  1. Would like the ability to hyperlink into tasks from the daily schedule portal, would help to see notes and time already accomplished etc

    In the daily scheduling portal the task number has a space between the first 3 numbers and the last 4 which doesn't allow us to copy and paste easily. We would like it to be a hyperlink that takes you to the task or at least be able to copy it like you can the tasks in the work module.

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  2. Remove the space in the middle of the task number in the daily capacity scheduling screen to make it easier to copy

    When you click any task in the daily capacity screen, the task ID in the top left has a space in middle of the numbers. It's annoying and an extra step to have to remove the space in the middle of the numbers when pasting it anywhere else.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  3. Period Capacity portal column widths reset

    Can the period capacity portal have column widths remember your setting. It is so time consuming every time you schedule a task or two to have to go back to opening the column widths to see the information. Other pages can keep settings, how is it this page does not??

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Hello, Tina. Unlike other EFP screens, period capacity contains a large number of columns, making it difficult to maintain column width in order to display the entire column name. Users can, however, use the hover over function to see the name without having to expand it each time. 

  4. Data exported to Excel missing in the Scheduling Portal.

    When exporting the Data in Period Capacity (filtered by compliance dates) to Excel the field for 'Reschedules' transfers all zeros regardless of the data present. Can this be corrected?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  5. Pm needs to be removed

    This silo isn’t operational any longer and pms are still being assigned to techs

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  6. Allow Task Filter by "Kitted & Staged" in eFP

    I would like to run a list of task by "kitted and staged" status. I do not see the option.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  7. Task tile sort

    Make the task tiles sortable. either by dragging and dropping in any order or sorting by status

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  8. Edit dates on Containers

    Have the ability to shifts dates on containers. The plant we run at has constantly changing run periods and downtime periods. This would allow us to create containers for the run time and downtime separately and shift dates as needed. Save on doing double work from production schedule changes last minute.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  9. We need visibility for every time a workorder is modified not just the last time it was.

    We need visibility for every time a workorder is modified not just the last time it was. This way even after it was completed, we would still be able to tell how many times it got moved and who moved it.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  10. Reopening Tasks

    When reopening Task for rework they are not easily found in the period capacity due to status of "rework" and go to daily capacity from when they were supposed to get done. When this falls in previous week it is cumbersome to search, move to period capacity and reschedule. Might make sense to have some options of what to do with it, as in to reassign or send to period capacity

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  11. Holidays should be transferred from Workday to the EF 3.0 Portal Work Schedule

    Holiday integration within the Workday to EF 3.0 Portal Work Schedule.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  12. Add an icon to say that a task is assigned to someone

    In the daily capacity screen, there is no way to see which tasks on the left side are already assigned without opening the task. Add an icon or something to show that the task is already assigned.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea