eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

9 results found

  1. Data exported to Excel missing in the Scheduling Portal.

    When exporting the Data in Period Capacity (filtered by compliance dates) to Excel the field for 'Reschedules' transfers all zeros regardless of the data present. Can this be corrected?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  2. Pm needs to be removed

    This silo isn’t operational any longer and pms are still being assigned to techs

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  3. Allow Task Filter by "Kitted & Staged" in eFP

    I would like to run a list of task by "kitted and staged" status. I do not see the option.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  4. Task tile sort

    Make the task tiles sortable. either by dragging and dropping in any order or sorting by status

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  5. Edit dates on Containers

    Have the ability to shifts dates on containers. The plant we run at has constantly changing run periods and downtime periods. This would allow us to create containers for the run time and downtime separately and shift dates as needed. Save on doing double work from production schedule changes last minute.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  6. We need visibility for every time a workorder is modified not just the last time it was.

    We need visibility for every time a workorder is modified not just the last time it was. This way even after it was completed, we would still be able to tell how many times it got moved and who moved it.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  7. Reopening Tasks

    When reopening Task for rework they are not easily found in the period capacity due to status of "rework" and go to daily capacity from when they were supposed to get done. When this falls in previous week it is cumbersome to search, move to period capacity and reschedule. Might make sense to have some options of what to do with it, as in to reassign or send to period capacity

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  8. Holidays should be transferred from Workday to the EF 3.0 Portal Work Schedule

    Holiday integration within the Workday to EF 3.0 Portal Work Schedule.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  9. Add an icon to say that a task is assigned to someone

    In the daily capacity screen, there is no way to see which tasks on the left side are already assigned without opening the task. Add an icon or something to show that the task is already assigned.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  • Don't see your idea?

Feedback and Knowledge Base