Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

287 results found

  1. We need the ability to change the equipment number on equipment with an active malfunction.

    The customers consistently submit work orders using the incorrect asset id and if they submit it in a down status you can not change the asset id without clearing the malfunction. If you clear the malfunction to change the id and then input the malfunction again it will track as scheduled downtime which skews your metrics. This forces us to cancel the work order and create it again as a new work order backdating the malfunction start time to the original work order time so our metrics are correct.

    Either let us modify the asset IDs even in a down…

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →

    This ability is already present in the EFP.  Create a new malfunction as an unscheduled by changing the downtime on the task to the date earlier than task created date. Along with that we are also providing the users to delete the malfunctions, change the asset and create a malfunction if required and users can change it to unscheduled by changing the time. 

  2. PM Tracking

    Is there any way to track what changes are made to PM plans, who made them and when?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  3. Closing PM on the Compliance Finish date requires Variance?

    When closing a PM on the final Compliance date eFactory is asking for a variance? This is new, never required one before on last date.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    declined  ·  1 comment  ·  Portal  ·  Admin →
  4. Data exported to Excel missing in the Scheduling Portal.

    When exporting the Data in Period Capacity (filtered by compliance dates) to Excel the field for 'Reschedules' transfers all zeros regardless of the data present. Can this be corrected?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  5. We need a way to edit compliance start/ finish dates. My site is M-F and PMs open and close on weekends which leads to a bottle neck

    We need a way to edit compliance start/ finish dates. My site is M-F and PMs open and close on weekends which leads to a bottle neck on some weeks.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  6. We need a way to edit compliance finish dates.

    We need a way to edit PMs that come due on the weekends. Or at least edit the compliance dates to match the work schedule of the plant.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  7. Batch Review Reconciliation on Completed Task

    Batch Review Reconciliation on reviewed WO/TASK that are completed. KMS process staff can review the completed and cancelled jobs. Do a mass select all and one click for later batch processing. This would save time versus doing it one by one and then waiting for system to process the data.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
  8. Feedback does not work

    Feedback does not work

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  9. Updating Repair codes during work order review

    No longer able to change repair codes during work order review.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
  10. Pm needs to be removed

    This silo isn’t operational any longer and pms are still being assigned to techs

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  11. Add Building Location field to the FMS Report> Task Planning

    Add Building Location field to the FMS Report> Task Planning. This would cut our time in half pulling excel sheets for scheduling. We use this field to show the main line asset of sub assets.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  12. Allow Task Filter by "Kitted & Staged" in eFP

    I would like to run a list of task by "kitted and staged" status. I do not see the option.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  13. Be able to see when tracking was added in events

    It would be awesome to see when tracking was added to a PO/req in the client. Many times I would have to ask someone for information on a PO because there is no tracking. Then it magically appears and it makes it look like I am going crazy. This way everyone is held accountable for their responsibility in the process of getting new parts.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
  14. Task tile sort

    Make the task tiles sortable. either by dragging and dropping in any order or sorting by status

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  15. Edit dates on Containers

    Have the ability to shifts dates on containers. The plant we run at has constantly changing run periods and downtime periods. This would allow us to create containers for the run time and downtime separately and shift dates as needed. Save on doing double work from production schedule changes last minute.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  16. default to proactive

    on MOTH task make the default to "proactive"

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Training  ·  Admin →
  17. Proactive default

    On MOTH task make the default to "proactive."

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  18. COLOCAR FOTOGRAFIA PARA LAS MAQUINAS EN EL PORTAL

    Una idea que podría llegar a ser muy útil para nuevos usuarios o cuando se cambia alguien de planta. Es que se le pueda colocar una FOTOGRAFIA de la maquina en del equipo en esta plataforma y de esa manera seria muchísimo más fácil de encontrarlas cuando te asignan una tarea en ella.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
  19. Mass processing of reviewed completed tasks.

    Mass check off of reviewed task when completed. Supervisor and review completed task and check a box. Once all tasks have been reviewed, the supervisor can click on the mass close out for all the reviewed completed task to process. instead of doing having the system process each one individually. This would save a lot of time waiting.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
  20. We need visibility for every time a workorder is modified not just the last time it was.

    We need visibility for every time a workorder is modified not just the last time it was. This way even after it was completed, we would still be able to tell how many times it got moved and who moved it.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

← Previous 1 3 4 5 14 15
  • Don't see your idea?

Feedback and Knowledge Base