eFactoryPro 3.0
60 results found
-
PM MODIFICATION SEARCH TOOL / DIFF
I would like to be able to go back and see the changes I have made on PM over any given time period. Right now there is no way to diff modifications to PMs. Customers have asked to see the PM optimizations that have been made over the past year and it is impossible from what I can see.
1 votecompleted · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedJob Plans modifications can be viewed on the History tab of the job plan in the Planner Portal. This history can also be accessed through Power BI.
-
Task Template Step Ordering
Currently when adding a step to a task template, the 'step order' needs to be changed manually. With templates containing 50 or more steps this can take a lot of time. Could you make the steps 'drag and drop' and therefore change the step order number automatically?
12 votes -
SCS should Not have the ability to make Stock Record changes for sites other than their own.
Currently, SCS is able delete Storage Bin IDs and change Target Min/Max levels at other sites besides their own. The SCS should not be allowed to make Stock Record changes for sites other than their own site. There have been instances where the SCS thought they were deleting a Bin ID or changing Min/Max levels on the Stock Record for their site but actually made changes for a site other than their own.
24 votesThank you everyone for all of your feedback. We have reviewed the request and determined that the only time this canoccur is when the SCS has permissions to both sites. Min/max changes will still require corporate supply chain approvals. Please let us know if specific instances come up. We will be performing a review of current permissions to validate proper access for all SCS.
-
Supply Chain: PM Work Orders should generate Part Need Requests
Planned Maintenance (PM) Work Orders should generate Part Need Requests several weeks in advance.
For scheduled work on Tasks allowing the Storeroom personnel enough time to order qtys. not on hand and pick - kit/stage the parts in the designated Storeroom area well ahead of the PM due date.35 votes -
Track & Notate changes in Task Templates
Be able to track changes in Task Template in Efactory Client by being able to add notes. We can do this in our PM contracts, should do the same for Task Templates.
1 vote -
Client: PRE-TASK ANALYSIS List expansion
Need the PM steps, "Pre-task analysis" statement on customer submitted PM work order to include more detail.
PRE-TASK ANALYSIS
Perform pre-task analysis before beginning work.
_Am I qualified and trained to do this Task? If not STOP and get help.
_Review each step of this Task prior to starting job.
_Do I have the correct tools, equipment, PPE and/or permits?
_Identify what hazards are present for each step of the job.
_Can I control each of those hazards before starting? If not STOP and get help.
_ If any unusual conditions exist write them in…25 votes -
Task Template Features
Team, I would like to ask for a feature that would show directly from the Task Template to which Assets is tied to. Currently is hard to identify the Assets that are using the same Task Template.
3 votes -
Equipment details.
Used to be able to click on the Equipment number and get the equipment details, this would be handy again for looking up machine details.
8 votes -
step option
put a third option on steps. Have a cannot do, then ask why. That will make it possible to close it.
3 votesUtilize the feedback option for this.
-
Counter for the number of updates for a task template
For the Task Templates, the system must to have a counter option for to update the number of times that a task template is updated. This will help for to audit a site and for to aligned the site with the FMS Sites Standars and Assessment Rev.3.0 in the section PM Improvement / Optimization Level 2 (Excelling) and said: More than 40% of PMs have been edited in previous 12 months.
13 votes -
Status change when using schedule board
When assigning work in the schedule board, why doesn't the tasks reflect status change. I dropped a task into the scheduled board, and task still shows open versus assigned. Assigned is an option on the task in the portal, but not an option in the drop down menu in the client.
1 votecompleted · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThis has been built into the new Daily Capacity scheduling screen in the Planner Portal.
-
Reports: Generating a BOM list for Inventory Parts
Sites should be able to generate a Bill of Materials "BOM" report for a particular equipment/machine model. The report needs to list all parts associated with that piece of equipment. We should be able to generate the report utilizing the four digit site#, place ID#, machine model# and/or even by site's asset ID#.
4 votes -
Schedule Board moves for tasks.
Client: Schedule Board -- Should be able to move Tasks by click and drag on the schedule board. Much easier to see daily plan of employee.
3 votescompleted · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThis has been corrected in the client, so that dragging a task now updates the Planned Start and End Dates/Times correctly.
-
Client: Task Template - Add Asset Search Field
Can you please add a search field for asset number in the Task Template tab.
It takes too long to get the the Task Template you require.
7 votes -
task template duplication
Planners/Schedulers need to be able to duplicate a task template and then edit the duplicate and rename it for time efficiency reasons.
2 votes -
Client: Access to Data Tables for Planners
If we knew how the tables and column header names related to the portal and client fields we could have access to any information we need at anytime reducing the need for one off reports being built to accommodate adhoc customer requests.
3 votes -
Client: Schedule board compliance start/ finish time stamp
Recently it was changed to look up a task by compliance start or finish you have to have a time stamp now. it easier to look at what pms are due that day by the entire day not just a specific time.
Change back to day and do not require a time.
1 voteThis function is working properly now.
-
Supply Chain personnel need the ability to add new storage bins for sites in the Client.
SCS & SCPM used to have the ability in the Client to create/add storage bins for sites but the NEW button has been removed from our access. Sites in the new optimized portal currently don't have the ability to add their own storage bins so we need the ability to do this in the Client until the new portal is updated giving the ability.
2 votes -
Search function for equipment
So. I noticed that when you look for equipment, the search function doesnt take into account the asset description nor the description fields. This make it harder to find them. ANY chance we can include these fields in the search function?
1 vote -
repair code object
please add a repair code for coupling under object
1 voteThis has been added. Please use the helpdesk in the future to create a ticket so these requests can be processed and tracked. Thank you!
- Don't see your idea?