eFactoryPro 3.0
7 results found
-
Equipment in Work module needs an additional field to identify "At Risk" equipment.
Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.
5 votes -
Operator Performed Maintenance sub-type should be available for MCRT type work orders.
Customer has requested all down work orders use sub-types to track responsibility for assets being down. The "Operator Performed Maintenance" sub type cannot be added to a MCRT work order. We need this sub-type to be available to MCRT work orders. Can have changed so it is available on MCRT?
5 votesAfter further review with the site, it seems there is a little confusion on this request.
"Operator error" the Operator causes the problem. "Operator performed maintenance" the Operator fixes the problem. The site is trying to use the sub-types to distinguish between who is responsible for resolving an issue and any extended downtime that occurred.
An example of "operator performed maintenance" 3rd shift operator has a non-maintenance machine issue related to training or experience that prevents running the machine. So, the machine sits idle with a down work order submitted. 1st shift operator arrives and being more experienced is able to fix the issue and begins running the machine.
This functionality will also be useful as our Operator-Performed Maintenance (OPM) program continues to grow within ATS. I am reopening the request to discuss further with our teams.
-
Task View
When I scroll down to look for a particular task and find and open the task, I found the task list jumps back to top of the list and then I have to scroll through the list again to find what I was looking for. I suppose if I noted the task number it would not be that big of an issue, but it would be handy if the list just stayed in the position that I stopped. Really a pain when you have multiple Work Orders.
5 votesunder review · AdminMichelle Oldfield (Business Analyst, Advanced Technology Services, Inc.) respondedThank you for your feedback! We are looking into the technical requirements for making this happen.
-
To add a field for indicate if a Pm was audited
One opportunity that we see in e-Factory is that the system doesn´t have a field for to indicate if the PM was audited. We are suggesting a field as a check mark and with this, to get the option in a report for to verify quickly how many pm´s were audited. The field may be add to Shift turn over report.
24 votesunder review · AdminMichelle Oldfield (Business Analyst, Advanced Technology Services, Inc.) respondedThis feedback is being examined by Operations leadership for possible inclusion in a future development sprint.
-
Predictive maintenance as PD, not PM in Task
Predictive maintenance Task Category in a Task Template shows up as PM Activity Type in the Task rather than PD Activity Type. Need to differentiate between the two Activity Types.
27 votes -
Down & Reduced in Tasks
Down and Reduced drop down. Can we have only open tasks show, instead of all. I have to go in and uncheck completed, reviewed, etc.
11 votes -
Need a way to see work order waiting on parts to be consumed.
Is there a way to add a filter/report to make it easier to see these? I am at a new location and all of our parts are not loaded yet so we have to add the new part and then purchasing has to set up new 100 number and then add stock and then the WO can be closed after consuming material. As it is I have to go through each work order individually looking for these issues. Would be less time consuming if I could run a report or export and filter for these issues first thing of each…
2 votesunder review · AdminMichelle Oldfield (Business Analyst, Advanced Technology Services, Inc.) respondedThank you for your feedback! We will take your suggestion to the business for possible inclusion in our development queue.