Sorting options in Scheduling Portal
Could we add a criteria to Table Sorts in the Scheduling Portal / Daily Capacity tab? I would like to sort the scheduled work by Building Location or Asset Number if Building Location isn't possible... This would greatly speed up the scheduling process and tech utilization efficiency by assigning all PMs/ tasks on a given machine line at the same time.
6 votes -
Predictive Maintenance still generates
PDM tasks should generate as PdM task types instead of PM. Also, there should be some differentiation in FM tasks based on whether they come from PdM and PM's to allow for easier data analysis of PM and PdM Effectiveness.
5 votes -
Job Plan steps need line and paragraph breaks in work orders
Planner/Schedulers go to great care to create detailed steps often with several sub-steps and places to check off completion. It looks great printed out in a pdf. But on the computer or iPad screen, carriage returns and paragraph breaks are ignored and the steps are just giant run on sentences that are jumble together.
5 votes -
Change Asset Search Criteria when creating new work order to "contains"
Change the Search functionality in the work order generation portal that the customer uses from Equals to Contains. By changing the search function to contains, it will help the customer find specific sub-assets that are tied to a main asset without having the exact wording. should reduce the number of workorders input incorrectly on asset name and also make it easier to find the asset when entering work orders
7 votes -
We need the ability to sort completed workorders by the date it was completed.
Customer wants us to report out weekly on FMs created and FMs completed but if we complete an FM from 3 months ago it's more difficult to find without the ability to search by date completed.
2 votes -
fix efactory to actually work between the hours of 4 am and 5 am est we have put in multiple tickets for this problem and nothing has fixed
fix efactory to actually work between the hours of 4 am and 5 am est we have put in multiple tickets for this problem and nothing has fixed this is horrible for metrices with not being able to access work orders between these hours this is an ongoing problem falling on nothing but deaf ears
10 votes -
Filter for Task Sub-type in the Review window
Filter for Task Sub-type in the Review window
5 votes -
log value added interaction
I feel that there should be a quick link button to allow technicians to post time when the technician provides task specific training or instruction to customer representatives such as operators. This would allow us to record additional unscheduled time in without having to create an additional downtime work order, but also provides feedback on customer value added support.
1 vote -
Boton Desmarcar todo
En las tareas, agregar un boton que en vez de marcar todo, sea para borrar todo
1 vote -
Resumen de horas laboradas por dia
Que en la seccion de horas laboradas, se muestre una opcion de descargar el resumen de horas laboradas, pero resumida por dias. De esta forma, los tecnicos podriamos saber de una forma mas facil cuanto tiempo hemos capturado en cada dia y hacer la suma mas rapido. En vez de tener que sumar el tiempo de cada tarea de forma individual.
1 vote -
Expanded/Customizable Data Fields for views
On various portals it would be beneficial to have multiple existing data fields to select from when setting up views in those portals. Have seen this in other CMMS' where you can select the data you want visible and data you don't want visible for those views. Ex. Asset Subtype, Technician Name, OEM, etc..
1 vote -
Provide ability to do mass printing in the task screen
Add in a feature to select multiple tasks to print at once. This would minimize the time spent preventing tasks to provide paper copies of tasks.
1 vote -
Method to See Parts Status + Supply Chain Notes at the Task Level
Currently, Supply chain enters in parts notes in the client and a scs has to be dilligent to manually transfer information into the task notes. It would be beneficial to link these together for better visibility and also provide a status indicator to show expected delivery date in the task screens. This is usually the first question from our leadership and customers.
1 vote -
Machine Downtime Values
In the equipment portal a field needs to be reserved for Machine Downtime Values that can be updated annually during machine criticality reviews. This will help quantify the value of downtime reductions and prevent back and forth with customer on agreed downtime rates. Will enable reporting capability that is a manual process today.
1 vote -
3 votes
-
Agilizar el filtrado de ordenes a revisar (Supevisores)
Visibilidad en pantalla principal de revisión de ordenes de que técnico cerró la tarea.
Nos agilizará a los supervisores el filtrado de las ordenes que requerimos revisar.
5 votes -
Letters/words still too light
Please make the words on the screen darker and easier to see. For sites using older screens, the text is still too light to see clearly causing eye strain.
1 vote -
Limit technician active sites
Allow the technician to remain active on one site at a time. If the technician migrates from the site, automatically mark his team status at the previous site as inactive.
10 votes -
Multiple Bins
If the part is in multiple bins allow the option to select which bin you want to pull the part from. Right now it defaults based on BIN name alphabetically. This can cause confusion and inventory discrepancies.
4 votes -
Equipment in Work module needs an additional field to identify "At Risk" equipment.
Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.
5 votes