Attach task templates to any work order type
To support the planning function, Task Templates are used to create "Reusable Job Plans." These RJP's stream line the planning process and create an avenue for continuous improvement. The ability to attach these RJP Task Templates to any work order/task type will save planning time and create work efficiency for the Technicians.
-
Bailey, Trent M. commented
It is a very useful tool for equipment rebuilds and a production line turn around that happens often. It speeds up the process of creating work orders in these circumstances.
-
Jacobs, Deborah M. commented
It would be fantastic to have this back (was available in 2.0). It is something that I would use almost daily.
-
Medeiros, Marc E. commented
I agree this would be a nice feature.
-
John Colvin commented
I can see the value in this, however, I haven't been in the position long enough to give a good educated opinion.
-
Jacobs, Deborah M. commented
Agree 100%. It is something that I utilized in the old system for all types of jobs, especially safety related work. Please bring this back to us.
-
Levi Scott commented
The ability to make task templates as MOTH or MRCT for that matter would be great. There are several applications for this that I can think of off the top of my head.
Re-occurring items for planned line or plant shutdowns that are not on a set schedule
Creating a template for projects so that we can reuse the information
Having SOPs that can then be placed directly to WOs when neededBasically if we could open this field so that we can create task templates that are Not MPRO it would be beneficial to the sites.
-
Christopher Atchison commented
I want to create a “MOTH” / “Event”, Task Template and have it scheduled to release on a predetermined schedule.
The system will only allow for MPRO Task Templates to be generated.
Here at APEX, it is outside of our scope of work to make line adjustments. This is something that falls on Operators, or the Setup Team.
ATS is being utilized too often to make these adjustments which is reducing the available man hours needed to complete PM's. We want to be able to capture the man hours that are going towards these adjustments daily, and share the results with the Customer.
I had the thought to have the system generate a MOTH / Event work order daily, to cut down on the Planner having to generate that work order every day. This will also continue to happen regardless of if the Planner is onsite or not. (eg: Sick Days, Vacation)
I know this is not the only Site that could benefit from this change. Scheduled generated work orders shouldn’t just be limited to MPRO / PM-PD’s.