Erase reason for variance
Erase reason for variance
When accidentally we put a reason for variance in portal, we cant edit to put the fill blank, we need to go to the CLIENT and edit from there.
1 vote -
1 vote
-
CMs, malfunctions and breakdowns.
When a malfunction is entered with its' start date after the WO creation date, the system changes the breakdown flag as "NO".
Sometimes the customer will report an issue and continue working the machine until we arrive to fix the equipment. Even though they didn't stop right away, We are still taking the machine down within the production schedule because of a problem reported by the customer. This should be considered as a malfunction (Breakdown - Yes) and count against MTTR, MTBF as any other failure.
What I am saying is that a malfuntion start date after the creation date…
6 votesMike Wibben has stated that he still agrees with the previous decision that all malfunctions with a Start Date/Time after the WO creation date/time are not considered breakdowns. This is due to the machine being taken down after the work order was created, which indicates planned downtime, not an unforeseen breakdown.
-
PM Task Duration Report
Need to be able to pull the open PM tasks with a the task duration already included. Right now it's a manual process and increases non-value added work to our day.
1 voteThis information is available from the Shift Turnover Report. By using the Task Status and WO Type filters, you can filter for open proactive work. The results include a column for task duration, which is the planned duration in hours for the PM.
-
Technician Filtering in Supervisor Portal
When filtering out the Technician tab in the 'Assign Task' column of the Supervisor Portal, it is no longer possible to select the Technician from the drop down. Therefore i am unable to filter out each Technician. For example if i input Equals 'Colin Sansom' in the filter i get all results for Colin Loveless, Colin Sansom and Alex Sansom.
1 vote -
Add work order / task filter to Accumulated Labor Report
Is it possible to add a work order or task number filter to the Accumulated Labor Report? This would allow me to obtain labor hours data for a specific work order / Task.
1 vote -
Work Order Completion without Task Completion
Technician is able to complete the work order and not the task. Is this a bug? Finding these under Supervisor Review Role.
1 voteThis is a bug that is being corrected in our current development cycle. The fix will be released on 05/22/18 if it passes testing.
-
new work order assignment
when I make a work order/task it should automatically be assigned to me and go to my list
2 votesDoes not follow WEM process.
-
bill of material
please fix the system so we can see what been used on the machine on the bill of material
1 voteThank you for your suggestion. It was a business decision in regards to Bill of Material to display all parts used on the same models.
Please continue using User voice for more feedbacks and suggestions. -
Pictures for Work Order generators as an option
i want the option to add a picture to the area needing attention. this would help the work order generator and maintenance tech in this process. also expedite all EHS concerns.
5 votesDeclining the request due to the age of request without any votes or activity.
-
Bugs
Be able to expand work order list. Also fix bugs on task sign off tabs. Can barely get to work on IPAD
1 vote -
Make part cost visible in the tech portal.
Make the cost of parts visible for technicians when reserving a part. We need access to this for approval purposes on overnight shifts when we have no supply chain support.
1 voteThank you for your feedback. Per the Director of MRO and Supply Chain, part cost information will not be displayed in the Tech Portal.
-
Enable us to minimize the split screen to view the tasks in full screen.
On the tasks display the split screen is used. It should be able to be minimized when not needed, this will give more screen space when looking through tasks.
3 votesThe task detail panel can currently be downsized, allowing the user to utilize the full screen for going through the list of tasks.
-
Row height not big enough for data.
On the Tasks display screen, the rows are all the same size causing part of the data to not be seen. It would be beneficial to increase the row height to fit the data for each row. Also minimizing the font size would help as well.
1 vote -
Recent tasks goes directly to open work orders only.
When you click on recent customer tasks it would be nice if it pulled up only open work orders right off. Then if we needed to look at something else IE: canceled, completed, hold, etc. We could use the drop down and select thaat.
3 votesGoes against the WEM processes of scheduling/assigning work rather that working from the recent work orders.
-
Customer name on work order.
When the customer enters a work order they also enter their name. But when we get the work order it shows customer. We really need the customers name that entered it on the work order. That way we can talk with the correct individual and get any details that will help complete the job quicker. An example would be we respond to the work order on a test stand where several people are working and we start having to asking individuals who put the work order in. Talking to the correct individual saves a lot of time on repairs.
1 voteThis capability currently exists on the Work Order screen in the Portal. The requester name is located on the Summary section of the Work Order screen, in the Requester field.
-
Canceled Work Orders - Under Supervisor
Canceled Work orders should not be a list for approval. Why is this information there? Should we be approving this growing list? It makes no sense to have this list since work orders are canceled for a reason. System should remove on its own.
1 voteMarc, thank you for your feedback! It was a decision made by the FMS business to require canceled work orders to be reviewed. This allows site management to view which work requests have been cancelled and be able to answer any customer questions that arise from the cancellation.
-
Job type
Hello, We have a opportunitty here in Nuevo Laredo with the Efactory pro 3.0 normally we give support to operations when they have the machine down by a setup or fixture repairs.
The problem here this type of order is very frequently they are introducing like MRCT because for them the machine really is down but by something that is out of our scoope.
Once the work order are in the system there are not a option to change to"others", this cause us a rework because to correct this is neccessary cancel and make new order with the correct type.
…
31 votes -
time entry
We used to be able to enter end time on work orders that was in the future. THIS WAS A NICE FEATURE! I sometimes fill out work orders near the end of the day, but will work until the last minuet.
1 voteJames, thank you for your feedback! While we can see how you would use this feature, Operations decided to not allow time stamps that are dated in the future. This was a decision made to enhance data accuracy and prevent work from being recorded prior to being done.
-
Requestor needs to appear on task
techs need to see a requestor field in the task level please to know whom to speak with at customer level.
1 voteRichard, thank you for your feedback! The requestor is shown at the work order level, since that contains the actual work request information. If you click on the work order tab next to the task tab, you will see a field for “Requestor” in the summary section of the work order.