eFactoryPro 3.0
248 results found
-
Customer Portal: More filters in equipment search history
Enable excel filters in the equipment work order history. There is only a simple search right now. Need to be able to filter on each column.
2 votes -
Work order metrics on screen
Add response time and PM Compliance on task summary
10 votes -
Length of time to load certain pages
The system sometimes seems very slow to load certain pages when trying to complete and close out work orders. This slows down the process which is longer when closing out a work order already, since you have to go through different pages in order to close everything out.
7 votescompleted · AdminRyan Gardner (Technical Support Specialist II, Advanced Technology Services, Inc.) respondedThe system is operating nominally at numerous sites. The root cause of this issue has been identified as network limitations at the customer level. ATS cannot make changes to a non-ATS environment.
-
labor hours.
It would be nice if we can add all the techs to the labor page at once ,instead of having to do the hours all over again individually. Its time wasted.
5 votesThis functionality is now live in our eFactoryPro 3.0 environment. To add labor for multiple techs, go to the labor tab, and click next to your name in the 2nd box to select additional names.
-
Security for Power BI
Create an interface for managing security for Power BI. This will allow ATS to create a singular Office 365 group dashboard which can be used for all sites VS creating a group for each site which migrates to eFP 3.0. This will drive standardization across the company and allow the tool to me much more manageable as we implement and roll out new content.
3 votes -
Customer Portal: Change Overs
Customer Portal does not allow the Customer to enter an appropriate work order for Change Overs.
Suggested idea would be a 4th question on the Customer's Create Work Order screen, "Is this a "Change Over?"
If selected, then the work order would default to work order type MOTH, Activity Type EV, and Subtype Change Over, and the equipment would not be in a "Down" status.
This would prevent ATS from having to modify each change over work order when they are created by the Customer, which is the current process.
11 votes -
Red Green Scheduling Report
Please add columns for Planned Start and Planned End to help give reference when analyzing the data.
1 vote -
Counter for the number of updates for a task template
For the Task Templates, the system must to have a counter option for to update the number of times that a task template is updated. This will help for to audit a site and for to aligned the site with the FMS Sites Standars and Assessment Rev.3.0 in the section PM Improvement / Optimization Level 2 (Excelling) and said: More than 40% of PMs have been edited in previous 12 months.
13 votes -
useful
it would be helpful if we had a history button on the task page . it would save a lot of time looking up the history if we could click a tib and pull up asset history for the equipment
1 vote -
ADD SOME ITEMS TO OBJECT CODE
NECESITAMOS AGREGAR MAS OBJETOS EN LOS CODIGOS DE REPARACION. POR FAVOR INCLUIR LO SIGUIENTE EN EL CAMPO DE OBJETO:
INVERSOR
GUARDA MOTOR
TARJETA I/O
TERMINAL2 votes -
Our Southwire Customer at Starkville (site 735) requires billing purposes we report consumption of parts by their part number.
To accomplish this the following tables need added to these 3.0 reports.
1) The “Consumption by Place” report needs to have the ‘Site Reference’ field added.
2) The “Billable POs” report needs to have the ‘Site Reference’ field added
3) The “Simple Inventory Stat Report’ needs to have the ‘Site Reference’ field added.
4) The ‘Simple Inventory Stat Report’ needs to have the Criticality Status’ field added.a. The ‘Site Reference’ data is in the field name ‘UserDef6’ in the FSM Table named ‘STOCK’ (STOCK.UserDef6)
b. The ‘Criticality Status’ data is in the field name ‘UserDef7’ in…1 vote -
ATS Intranet link
Can you fix under links the ATS Intranet so it goes to the homepage again?
1 vote -
8 votes
-
Please include asset criticality in the shift turnover report.
The shift turnover report has nearly all information needed to format any kind of report the customer or site needs. The addition of the Asset Criticality designation would be very beneficial.
1 vote -
Traveling Technician Site Access
Add a login for traveling techs to access site Efactory pro system while at current site. Create a log in that allows them to access the specific site they are at using their actual name instead of another persons login .
Don Worthington
1 voteThis is a great idea! This was a primary feature we built into EFactoryPro with traveling techs in mind. If you request access to the site you are traveling to, permissions can be added to your account. Once added, and you can select the site from the site drop down in the top right of the technician interface!
-
Reports: Add Equipment criticality and priority to Task Planning report
The new "task planning" report needs to show equipment criticality.
Equipment criticality and priority must be used to ensure the proper work is being done at the proper time.
Without intrinsic knowledge of criticality proper sequencing of work is problematic.40 votes -
Partial Parts Consumption
Part Consumption: There should be an option to consume a variable amount of parts. If a tech only consumes a portion of parts requested, they should be able to consume only the used portion. Sometimes parts are not shipped in one package and techs can only use a portion of the parts needed on the work order, but the part need remains opened with nothing consumed until all parts arrive and and are consumed.
17 votes -
Query other sites inventory for equipment by same manufacturer or by model number
It would benefit a site manager to know that another ATS site had a machine with same or similar model number or manufacturer that could be contacted for phone/Skype/visit support.
1 votePlease use the Reliability360 App in PowerBi to search all equipment across ATS.
-
Reverse part look up for SCS
We as supply chain specialists would benefit from being able to view the machines that each part belongs to. If we have a part #, and we're not sure which machine or machines the part applies to, it would be great to be able to see where the part belongs or has been in the past.
7 votes -
Status change when using schedule board
When assigning work in the schedule board, why doesn't the tasks reflect status change. I dropped a task into the scheduled board, and task still shows open versus assigned. Assigned is an option on the task in the portal, but not an option in the drop down menu in the client.
1 votecompleted · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThis has been built into the new Daily Capacity scheduling screen in the Planner Portal.
- Don't see your idea?