eFactoryPro 3.0
33 results found
-
Pictures/Attachments at the Task Level
Provide the ability to add in Pictures and Documents at the task step level. This will provide more direction on the activities required by the technicians and enable the ability to provide more detailed procedures to support the execution of steps during work on a machine.
4 votes -
Expanded PM Generation Abilities
Add in expanded generation rules for triggering PMs. The want is the ability to exclude certain days. Example- exclude weekends for daily PM Generation
4 votes -
Job plan steps should have an option to attach images
Planner/Schedulers should be able to attach image files (PNG/JPG/GIF) to specific steps in a job plan. The technician should be able to see those images for each step and enlarge them in the steps screen.
The downside of using attachments for the files is that 1) the tech has to go back and forth between steps and attachments, and 2) it's harder to organize the images based on a specific step
9 votesPBI 99959
-
Display HTML tags properly in all screens
Some places HTML tags work (like in the pre-defined steps tab) but in other places HTML shows as plain text like in the actual Job plan steps. HTML tags should always display properly in all tabs, windows, and print outs.
1 vote -
Add in Component Based Master Task Steps
Provide the ability to cater master maintenance procedures for specific components that apply to machines. Ex. If a machine has a hydrogen valve, be able to select that and input regular maintenance checks or procedures to PM or repair that type of components.
1 vote -
EFP connected to equipment to read meters
Would be beneficial to create a method to connect meters to the equipment electronically. This would allow for more sites to pursue meter based maintenance and eliminate the need for a manual check and entry for sites that perform them currently. This can reduce the need for tech labor for non value added time based PMs.
1 vote -
DT required button added to job plan
Add a field in the Job plan template to indicate if this task requires DT
14 votesUnder review with IT team.
-
Replace the planned start date with the first date of the period capacity or Scheduling Period dates on the all open tasks screen.
Replace the planned start date with the first date of the period capacity or Scheduling Period dates on the all open tasks screen.
3 votes -
Task Planned Proccess Easier and Quicker
Would be helpful to have a quick access to the planner portal into the task to plan the task you are working on it, then once planned back to the task, and dont have to copy the task number, load the planner portal and search the task you want to plan. This would be easier and quiker our work.
27 votes -
Feedback status notification to the initiator
Feedback status notification to the initiator. Currently when an employee or customer provides feedback to the planner; no status results are sent to the initiator. So they have no clue if their feedback was rejected or approved. Especially rejected, should come with an explanation or comment.
1 vote -
MERGE W/O TOGETHER
I WORKED AT A PLACE WHERE IF YOU HAD DUPLICATE W/O "S FOR THE SAME ISSUE. WE THEN COULD MERGE BOTH W/O'S TOGETHER. IT WAS A MERGE BUTTON ON THE SCREEN THAT WE COULD HIT AFTER SELECTING 2 W/O'S WITH A CHECK MARK NEXT TO THEM. THEN IT ASKED US WHICH WORK ORDER TO KEEP AND WHICH ONE TO MERGE TO THE KEPT ONE. MADE THINGS EASIER. ATLEAST GIVE THIS TO THE PLANNER/SCHEDULER
THANKS6 votes -
Have a way to schedule workorders back to individual as you reopen it, and be able to flag it so the technician Knows
Have a way to schedule workorders back to the individual as you reopen it, and be able to flag it so the technician can Easly identify it needs reworked
7 votes -
Quality Assurance Request: Send Notifications when Regulatory PM task date is modified
This is a new position in Mexico and as part of my role, I need to receive a notification when a regulatory PM task date is modified. I already contact the support IT team and this option is not currently available. Please, can you assist?
10 votes -
9 votes
-
It would be nice to have the ability to create a work order from the planning task screen
It would be nice to have the ability to create a work order from the planning task screen.
2 votes -
Need excel export to include entire filtered selection
Period capacity currently exports only 100 rows. My exports would usually contain 400-500. I use this to allow the customer to see what work we have scheduled for a particular week.
7 votes -
7 votes
-
When scheduling a task in period or daily capacity - flag the that additional tasks exist for that asset.
Period - Will help us ensure we're scheduling all open tasks for an asset that can be completed at once - planned correctives and current PMs.
Daily - So we visit the asset only once
6 votes -
Planner Portal scheduling board that has a weekly view For PS to drop an entire weeks schedule onto that can have individual days selected
currently I use an Excel workbook with a sheet for each day. i print out each day and bring it to tier one meetings for technicians and a copy is emailed to customer so they know what machines we plan on taking each day. every cell on that page has to be filled out on every task each day of each week.
I propose a week display where you fill in a selected task number and it auto populates the rest of the information (asset iD, description of task, a blank notes section that can add notes if needed, planned…3 votes -
Codigos de reparacion
A mi punto de vista , esta buena la idea de mejora el sistema , pero creo prudente que cada sitio debe de tener sus códigos de reparación ya que en cada sitio las maquinas son diferentes y por ende el refaccionamiento es diferente . ademas de tener mas claro la información en la base de datos
1 vote