Would like the ability to hyperlink into tasks from the daily schedule portal, would help to see notes and time already accomplished etc
In the daily scheduling portal the task number has a space between the first 3 numbers and the last 4 which doesn't allow us to copy and paste easily. We would like it to be a hyperlink that takes you to the task or at least be able to copy it like you can the tasks in the work module.
8 votesThere is a clipboard icon next to the task IDs, which users can click to copy without space.
-
Sorting options in Scheduling Portal
Could we add a criteria to Table Sorts in the Scheduling Portal / Daily Capacity tab? I would like to sort the scheduled work by Building Location or Asset Number if Building Location isn't possible... This would greatly speed up the scheduling process and tech utilization efficiency by assigning all PMs/ tasks on a given machine line at the same time.
6 votesWe already have the ability to filter the tasks by building location and asset ID in period and daily capacity scheduling screens. Also, users can sort the building location and asset ID on period capacity screen.
-
pm generation on same day of the month
Create a frequency unit that will allow the PM's to drop on the same day of the month each month so that we can schedule the same p.m.'s on the same day each month at the customer's request so we can get to a scheduling point where we can take the machines for the monthly downtime Pm's the same days each month. this will keep them from walking forward and backwards throughout the months and also stop the occasional monthly pm from generating within the same month. SAP called this Key Date and it has been requested from one of…
2 votesUsers can use the 'weeks' option to schedule a PM on the same day each week. As many sites do not want PMs due on weekends, we are unable do both calendar months and 28-day months calculations because our PM generation tool does not support that functionality, i.e., dealing with two different methods of calculation.
-
Remove the space in the middle of the task number in the daily capacity scheduling screen to make it easier to copy
When you click any task in the daily capacity screen, the task ID in the top left has a space in middle of the numbers. It's annoying and an extra step to have to remove the space in the middle of the numbers when pasting it anywhere else.
4 votesUsers can use the copy button next to the task number. It does not provide any space unless users right-click and select copy, which copies the task number with space.
-
task display settings
Hello...the efactory task screen doesn't retain our personal preferences. I liked it when I was able to simplify the info displayed.
1 voteUsers can select the columns they want by clicking the hamburger menu adjacent to the columns, and the system will save the settings until the user clicks the "Reset columns" option. Please let us know if you are experiencing problems with any specific screen of the EFP.
-
Period Capacity portal column widths reset
Can the period capacity portal have column widths remember your setting. It is so time consuming every time you schedule a task or two to have to go back to opening the column widths to see the information. Other pages can keep settings, how is it this page does not??
1 voteHello, Tina. Unlike other EFP screens, period capacity contains a large number of columns, making it difficult to maintain column width in order to display the entire column name. Users can, however, use the hover over function to see the name without having to expand it each time.
-
We need the ability to change the equipment number on equipment with an active malfunction.
The customers consistently submit work orders using the incorrect asset id and if they submit it in a down status you can not change the asset id without clearing the malfunction. If you clear the malfunction to change the id and then input the malfunction again it will track as scheduled downtime which skews your metrics. This forces us to cancel the work order and create it again as a new work order backdating the malfunction start time to the original work order time so our metrics are correct.
Either let us modify the asset IDs even in a down…
3 votesThis ability is already present in the EFP. Create a new malfunction as an unscheduled by changing the downtime on the task to the date earlier than task created date. Along with that we are also providing the users to delete the malfunctions, change the asset and create a malfunction if required and users can change it to unscheduled by changing the time.
-
PM Tracking
Is there any way to track what changes are made to PM plans, who made them and when?
1 voteThis is current functionality on the Edit PM screen in the Planner Portal.
-
Closing PM on the Compliance Finish date requires Variance?
When closing a PM on the final Compliance date eFactory is asking for a variance? This is new, never required one before on last date.
1 vote -
Data exported to Excel missing in the Scheduling Portal.
When exporting the Data in Period Capacity (filtered by compliance dates) to Excel the field for 'Reschedules' transfers all zeros regardless of the data present. Can this be corrected?
1 voteDeclined per Operations team
-
We need a way to edit compliance start/ finish dates. My site is M-F and PMs open and close on weekends which leads to a bottle neck
We need a way to edit compliance start/ finish dates. My site is M-F and PMs open and close on weekends which leads to a bottle neck on some weeks.
2 votesThis will be addressed in the new PM functionality in the EFP.
-
We need a way to edit compliance finish dates.
We need a way to edit PMs that come due on the weekends. Or at least edit the compliance dates to match the work schedule of the plant.
2 votesThis will be addressed in the new PM functionality in the EFP.
-
Batch Review Reconciliation on Completed Task
Batch Review Reconciliation on reviewed WO/TASK that are completed. KMS process staff can review the completed and cancelled jobs. Do a mass select all and one click for later batch processing. This would save time versus doing it one by one and then waiting for system to process the data.
2 votesThis defeats the purpose of having review screen and will mess up the metrics. Review screen motto is to allow supervisors to go through each task and verify rather doing a bulk action.
-
Feedback does not work
Feedback does not work
2 votes -
Updating Repair codes during work order review
No longer able to change repair codes during work order review.
1 voteDeclined per Operations team
-
Pm needs to be removed
This silo isn’t operational any longer and pms are still being assigned to techs
2 votes -
Add Building Location field to the FMS Report> Task Planning
Add Building Location field to the FMS Report> Task Planning. This would cut our time in half pulling excel sheets for scheduling. We use this field to show the main line asset of sub assets.
1 voteDeclined per Operations team
-
Allow Task Filter by "Kitted & Staged" in eFP
I would like to run a list of task by "kitted and staged" status. I do not see the option.
2 votesDeclined per Operations team
-
Be able to see when tracking was added in events
It would be awesome to see when tracking was added to a PO/req in the client. Many times I would have to ask someone for information on a PO because there is no tracking. Then it magically appears and it makes it look like I am going crazy. This way everyone is held accountable for their responsibility in the process of getting new parts.
1 voteDeclined per Operations team
-
Task tile sort
Make the task tiles sortable. either by dragging and dropping in any order or sorting by status
2 votesDeclined per Operations team