Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

303 results found

  1. My Work

    When reviewing work orders/tasks in the "My Work" section of the Work Module Portal, there used to be an option that allowed you to switch to a list view of all tasks assigned to you. Can you please bring this function back? This would better allow technicians to keep track of assigned tasks versus trying to click back through various weeks.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →

    As far as we know, there isn't currently a built-in option to view all tasks assigned to a specific user for an entire month. Right now, options are a bit limited: You can only view tasks by week and export to see the list of tasks for a week.

    Current Workaround: If you need to see all tasks assigned to a specific person, you can head over to the Tasks screen, then filter by their technician's name and the created date.

  2. Please release an android app.

    It would be helpful to have an app for android devices. I do not have an iphone.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Mobile  ·  Admin →
  3. Check Links provided in Training Modules

    www.knowledge.efactorypro.com & https://uservoice.advancedtech.com/forums/
    These links provided in eFP Training for Maint Tech, did not work, 'Page not found'.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Training  ·  Admin →
  4. Parts Used on the BI Shift Turnover Report

    Can we add a column to the BI Shift Turnover Report listing the parts that were used on the tasks?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  5. Asset health score

    Similar to asset criticality, it would be beneficial to have a 1-5 score for asset condition. Maybe this could be incorporated into the OS to review and agree on asset conditions with the customer on an annual basis. This lets us see our most at risk assets and prioritize rebuild or AIM projects for those. It would also help us develop asset lifecycle methodology and clear communication with the customer on asset health. The MHA scores that are performed can tie right in and validate or update asset health scores

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
  6. Daily capacity and holiday hours

    In the daily capacity section of scheduling in the planning portal, holidays that we do not work do not get greyed out. Have the option of adding zero work hours on days that are a dedicated holiday and the plant is closed.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  7. Meter PMs Need a Longer Compliance Window

    Meters used to have a compliance window of 14 days. Now it's set to 7 days. It needs to be reverted back to the 14 days.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    declined  ·  1 comment  ·  Planner Portal  ·  Admin →
  8. Hiiii

    Hiiii

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    declined  ·  0 comments  ·  Training  ·  Admin →
  9. Down Equipment Pop-up notification

    There should be a Down Equipment Pop-up notification window that shows no matter what screen you are working on.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    declined  ·  0 comments  ·  Client  ·  Admin →
  10. Allow us to add extra parts needs when needed

    Allow an increase in part need through edit quantity.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    declined  ·  0 comments  ·  Portal  ·  Admin →
  11. task display settings

    Hello...the efactory task screen doesn't retain our personal preferences. I liked it when I was able to simplify the info displayed.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  12. Period Capacity portal column widths reset

    Can the period capacity portal have column widths remember your setting. It is so time consuming every time you schedule a task or two to have to go back to opening the column widths to see the information. Other pages can keep settings, how is it this page does not??

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Hello, Tina. Unlike other EFP screens, period capacity contains a large number of columns, making it difficult to maintain column width in order to display the entire column name. Users can, however, use the hover over function to see the name without having to expand it each time. 

  13. pm generation on same day of the month

    Create a frequency unit that will allow the PM's to drop on the same day of the month each month so that we can schedule the same p.m.'s on the same day each month at the customer's request so we can get to a scheduling point where we can take the machines for the monthly downtime Pm's the same days each month. this will keep them from walking forward and backwards throughout the months and also stop the occasional monthly pm from generating within the same month. SAP called this Key Date and it has been requested from one of…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Users can use the 'weeks' option to schedule a PM on the same day each week. As many sites do not want PMs due on weekends, we are unable do both calendar months and 28-day months calculations because our PM generation tool does not support that functionality, i.e., dealing with two different methods of calculation. 

  14. Would like the ability to hyperlink into tasks from the daily schedule portal, would help to see notes and time already accomplished etc

    In the daily scheduling portal the task number has a space between the first 3 numbers and the last 4 which doesn't allow us to copy and paste easily. We would like it to be a hyperlink that takes you to the task or at least be able to copy it like you can the tasks in the work module.

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  15. Remove the space in the middle of the task number in the daily capacity scheduling screen to make it easier to copy

    When you click any task in the daily capacity screen, the task ID in the top left has a space in middle of the numbers. It's annoying and an extra step to have to remove the space in the middle of the numbers when pasting it anywhere else.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  16. Sorting options in Scheduling Portal

    Could we add a criteria to Table Sorts in the Scheduling Portal / Daily Capacity tab? I would like to sort the scheduled work by Building Location or Asset Number if Building Location isn't possible... This would greatly speed up the scheduling process and tech utilization efficiency by assigning all PMs/ tasks on a given machine line at the same time.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Portal  ·  Admin →
  17. PM Tracking

    Is there any way to track what changes are made to PM plans, who made them and when?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  18. Updating Repair codes during work order review

    No longer able to change repair codes during work order review.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
  19. Closing PM on the Compliance Finish date requires Variance?

    When closing a PM on the final Compliance date eFactory is asking for a variance? This is new, never required one before on last date.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    declined  ·  1 comment  ·  Portal  ·  Admin →
  20. Data exported to Excel missing in the Scheduling Portal.

    When exporting the Data in Period Capacity (filtered by compliance dates) to Excel the field for 'Reschedules' transfers all zeros regardless of the data present. Can this be corrected?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

← Previous 1 3 4 5 15 16
  • Don't see your idea?