Change Labor Hours to Rolling 30 days
Labor hours should display last 30 days instead of hours entered in the current month. When the first day of the month occurs, the Labor Hours screen is blank.
4 votes -
Need the ability to create an escalation/event monitor per equipment/asset
A need has been identified to create Escalations/ Event Monitor for either an individual or a collection of equipment/assets.
If given this level of control in the escalation process we would be able to escalate particular down time occurrences to the proper people without "spamming" a host of individuals.
5 votes -
Add model #'s to Equipment page
Portal-Equipment
Need to have model # displayed.3 votes -
PdM Follow Up Tasks
We need the ability to assign follow up tasks on PdM Work Orders to a specific asset (maybe have a drop down box). Currently, most PdM work orders are routes for the entire facility. Instead of creating a PdM work order for each asset, we would like to have the ability to assign follow up tasks on this work order type to assets.
4 votes -
closing tasks
There are too many steps to close a work order that does not belong to ATS and does not impact our metrics. i have tp close approximately 150 work orders from other non-ats department's.
5 votes -
Error al correr reporte con el portan el Español
Cuando cambias el lenguaje a Español, al querer generar los reportes aparece el error: "falta un valor en el parametro lenguaje" y no te deja correr ningún reporte. cambie el idioma nuevamente a Ingles y ya me dejo correr el reporte.
2 votes -
Down time and escalation time have different counters
We have a problem with the programation of the system. For example our client has a production schedule from 6:30am to 12:00 am, if our client enter a WO for a reactive work at 11:30 pm, the down time starts from 11:30 pm it is interruptted at 12:00am and then starts counting again at 6:30am, we dont have problem with that. The problem is the scalation system: If our client enter a WO for a reactive work at 11:30pm the time for scalation starts counting and it doesnt stop at 12:00am, it continuing counting. This situation provoques scalations for high…
4 votes -
Part Status Icon located on work order's reserved parts listing.
Place a button along with "View Part Bin Info, Consume Part Need, Edit Part Need, and Cancel part need" that would query the parts need table and return if the req was released, due date, and tracking number for shipment.
21 votes -
Review work order by technician
I would like to review work orders by Technician
1 vote -
SISTEMA PERMITE BORRAR O MODIFICAR UNA TAREA YA COMPLETADA
Al momento de completar una tarea, cualquier persona que no haya participado en la tarea puede modificar y/o borrar horas de mano de obra, notas etc, favor de colocar candados ya que se puede perder informacion valiosa
1 vote -
Estimacion de tiempos desde Portal
Poder agregar el tiempo estimado de una actividad desde el EfactoryPro 2.0 ya que hacerlo desde el Cliente demora demasiado tiempo, cuando seria mas eficiente desde el portal.
En cuanto a los Mantenimiento Preventivos que el sistema pueda estimar el tiempo de ejecución calculando las ultimas 3 ejecuciones y la cantidad de personas.1 vote -
Repair code - object
Repair codes - object
Can “eyelet” be added to the drop down list?2 votes -
Add Planned and Actual Labor Columns to the Task Grid in the Portal
Please add Total Planned Labor minutes and Actual Labor to the basic technician report.
1 vote -
move the + up 1/2"
not a fan of the red plus sign in the middle of no where. it has no sensible reason to be by itself halfway in between the header and main body of the page.
1 vote -
Down & Reduced in Tasks
Down and Reduced drop down. Can we have only open tasks show, instead of all. I have to go in and uncheck completed, reviewed, etc.
11 votes -
Add Wire rope/cable for Hoist
There are not ODC codes for a Wire Rope cable for Hoist or tool balancers.
1 vote -
Adding the parts section to the WO print out
It would be beneficial for the Techs if the parts need section appeared when a WO is printed. Currently there is a part used section, and I would think that we could add a sub set in this section of the print out.
6 votes -
Date Planned Removed and Planned Start Date added to the Supervisor filter for unassigned and assigned tasks.
Date Planned Removed and Planned Start Date added to Supervisor filter for unassigned and assigned tasks.
2 votes -
Serial Number on printout
When printing out a work order some things are omitted on the printout that appear on the computer screen. One of them is the machine serial number; I'd like that added to the printout.
1 vote -
way to label issues Mechanical or electrical
would make assigning work orders and for tech to find tickets that fit their skill set if there was a drop down that allowed for identification.
3 votes