eFactoryPro 3.0
297 results found
-
Add Building Location field to the FMS Report> Task Planning
Add Building Location field to the FMS Report> Task Planning. This would cut our time in half pulling excel sheets for scheduling. We use this field to show the main line asset of sub assets.
1 voteDeclined per Operations team
-
Allow Task Filter by "Kitted & Staged" in eFP
I would like to run a list of task by "kitted and staged" status. I do not see the option.
2 votesDeclined per Operations team
-
Be able to see when tracking was added in events
It would be awesome to see when tracking was added to a PO/req in the client. Many times I would have to ask someone for information on a PO because there is no tracking. Then it magically appears and it makes it look like I am going crazy. This way everyone is held accountable for their responsibility in the process of getting new parts.
1 voteDeclined per Operations team
-
Task tile sort
Make the task tiles sortable. either by dragging and dropping in any order or sorting by status
2 votesDeclined per Operations team
-
Edit dates on Containers
Have the ability to shifts dates on containers. The plant we run at has constantly changing run periods and downtime periods. This would allow us to create containers for the run time and downtime separately and shift dates as needed. Save on doing double work from production schedule changes last minute.
2 votesDeclined per Operations
-
default to proactive
on MOTH task make the default to "proactive"
3 votesMost FMS customers do not consider "Other" type maintenance work to be proactive. Defaulting these types of tasks to proactive would cause extra work for the site.
-
Proactive default
On MOTH task make the default to "proactive."
3 votesDeclined per Operations team
-
COLOCAR FOTOGRAFIA PARA LAS MAQUINAS EN EL PORTAL
Una idea que podría llegar a ser muy útil para nuevos usuarios o cuando se cambia alguien de planta. Es que se le pueda colocar una FOTOGRAFIA de la maquina en del equipo en esta plataforma y de esa manera seria muchísimo más fácil de encontrarlas cuando te asignan una tarea en ella.
1 voteDeclined per Operations team
-
Mass processing of reviewed completed tasks.
Mass check off of reviewed task when completed. Supervisor and review completed task and check a box. Once all tasks have been reviewed, the supervisor can click on the mass close out for all the reviewed completed task to process. instead of doing having the system process each one individually. This would save a lot of time waiting.
1 voteDeclined per Operations team
-
We need visibility for every time a workorder is modified not just the last time it was.
We need visibility for every time a workorder is modified not just the last time it was. This way even after it was completed, we would still be able to tell how many times it got moved and who moved it.
2 votesThis is already possible via the events tab of the Task.
-
Follow Up Task - Asset ID
Remove the need to add an Asset ID when creating a Follow Up Task
1 voteDeclined per Operations team
-
Subscribing to updates of specific work orders
It would be nice to be able to stay subscribed to a work order's updates in regard to parts orders even after it has changed ownership from technician to planner and so on. This would allow technicians to be informed once parts were kitted in the crib that we have been waiting on.
1 voteDeclined per Operations team
-
Reopening Tasks
When reopening Task for rework they are not easily found in the period capacity due to status of "rework" and go to daily capacity from when they were supposed to get done. When this falls in previous week it is cumbersome to search, move to period capacity and reschedule. Might make sense to have some options of what to do with it, as in to reassign or send to period capacity
4 votesDeclined per Operations team
-
Daily Capacity / Waiting on Materials
Would like to be able to add time to Daily Capacity for work orders waiting on materials.
3 votesDeclined per Operations team
-
Searching Parts in Tech Portal
Adding the Site Reference field as a searchable option. Some sites use this for customer part numbers.
2 votesDeclined per Operations team
-
Notes after closure/cancellation
I think it would be good to be able to add notes even after a Task is closed/cancelled. That way additional info gathered in future could be added. Even if it were a supervisor only ability would be good. It may be good to add a popup that warns user that they are about to add a note to a closed/cancelled task, that way if they are in wrong task on screen it may alert them to such.
3 votesDeclined per Operations team
-
add 800 number for emergency request
I think “call the 800 number. 1-800-662-4001, OPTION 7” should appear when the EMERGENCY REQUEST toggle is selected. The process states for them to make the call. This would just facilitate the process.
2 votesDeclined per Operations team
-
Equipment readings (Meters) that accept free form Data entry
There are only three types of readings available; "Hit Count," "Hours operated," and "Units Produced." These meter types require that each reading increments from the previous reading. However, when trying to record fluctuating readings such as Level or Temperature it is possible to have readings that are lower than the previous reading. Would like to see a reading type that allows free form data entry so a fluctuating reading can be tracked over time.
4 votes -
Holidays should be transferred from Workday to the EF 3.0 Portal Work Schedule
Holiday integration within the Workday to EF 3.0 Portal Work Schedule.
2 votesDeclined per Operations team
-
Auto update work order screen
Can the work order screen auto update like the status monitor screen does?
1 voteDeclined per Operations team
- Don't see your idea?


