Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

248 results found

  1. Fixing the broken parts search

    Please fix the parts search. It's extremely frustrating to check the location of a part suspected to be correct and then lose the entire search. Also the ability to sort by manufacturer would be very helpful. Maybe have the parts search function similar to how the tasks lists work so that the different aspects of the parts are searchable/sortable

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  0 comments  ·  Client  ·  Admin →
  2. Downtime in Malfunction section

    Today we can see the Repair Time in the malfunction section on the ESM portal, we would like to see also the Downtime in the Task.

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  1 comment  ·  Portal  ·  Admin →
  3. Monday through Friday option for PM's in EFP3.

    I would like to have a Monday through Friday option added for PM's . The weekly option in EFP only has a 3 day window. There is no good way to do a daily PM for a monday through Friday work week.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
  4. Add duration tab on Technician Portal

    Having duration in the technician portal allows our customer to see the time scheduled for each tasks, also good to have when exporting file.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
  5. Misalignment of P/S training tasks between systems

    Planner / Scheduler training misaligned between EFP Wiki and Cornerstone.

    Specifically, P/S 08,09,10 are not the correct lessons so that the two systems coincide.

    Wiki- Cornerstone-
    08- Job plans 08-T/S P/M
    09- Meters 09-Job plans
    10- T/S P/M 10-Meters

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Training  ·  Admin →
  6. Add a checkbox in the client that allows PS to activate or disable PMs

    The current method of cancelling PMs is time consuming. Adding a checkbox will help identify and label PMs as active or inactive without comprising the existing data in our system.There is no way to identify which PMs the site wishes to disable due to the PM no longer being needed or multiple PMs being combined into one.

    41 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  9 comments  ·  Client  ·  Admin →
  7. Planned start date/Assign Tech

    On the planne/Scheduler portal it would be nice to set the planned hours as well as the planned start date. As well as assign a tech.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
  8. Add the field Crew size to Forecast pm and shift turn over reports

    Add the field Crew Size to Forecast PM and Shift Turn Over Reports. At this time, both reports have the Duration parameter but it´s necessary to visualize the number of technician for each activity.

    18 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  9. Zero Quantity

    Have a site bin location in the tech portal for parts that have a zero quantity. That way the tech can check the location to verify the quantity is zero. There have been occasions when the system says zero when in fact there are parts in the bin location or mistakenly placed in adjacent bin.

    28 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  4 comments  ·  Portal  ·  Admin →
  10. Assign multiple Technicians to a Task

    Need to be able to assign multiple technicians to a Task. There is a way to do so in the Client but it does not show in the Portal.

    40 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  3 comments  ·  Portal  ·  Admin →
  11. Regulatory information in Power BI

    Can the Regulatory Fields be transitioned over to Power BI for tracking purposes at the site Level?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  12. Easier inventory search

    First, set up a separate site specific tab for going directly to inventory without the need of going through a work order.

    Second, give a back progression option in the parts search, or different dialogue boxes within the search so that we don't have to keep going back to the beginning each time we get to the part and find it isn't the one we were looking for.

    15 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  6 comments  ·  Client  ·  Admin →
  13. Change the optimization process

    eFactory doesn't recognize a change to the PM if you modify just the steps, you have to change the task description or the duration for the system to see the change, Change the system so it recognizes step changes as a change without having to modify the description or the duration.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  0 comments  ·  Client  ·  Admin →
  14. Template Steps Numbering

    It would be great if the automatic numbering of steps was in mulitples of 10. Example: first step would be 10, next would be 20, and so on. Then inserting new steps would be easy. If you need to insert a step between 40 and 50, you would number the new step 41, or 45.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    completed  ·  0 comments  ·  Client  ·  Admin →
  15. Time editable by tech it is assigned to.

    Tech's should be able to modify time assigned to them, no matter who created the time. This would help from overlapping time periods if someone incorrectly inputs another tech's time. A notification about new time entrys from other technicians would also be very nice to know if time has been put in or not.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
  16. Filter WO by teams

    Filter WO by teams so we can search the WO assigned to an individual team

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
  17. Cancelling Tasks

    When a technician cancels a Task they need to be able to add comments about why they cancelled it. Currently if they do this the Task will cancel, but the work order will remain open.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Portal  ·  Admin →
  18. As a Supervisor, groups should be able to be removed/inactivated in the ESM.

    As a Supervisor, groups should be able to be removed/inactivated in the ESM.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  19. Additional object code

    Can we add a "Strainer" to the list of objects in the repair code. We have a lot and they clog consistently. This code would help track these failures.
    Thanks

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  20. Visual representation on the status monitor if a job is waiting for parts/services.

    Can we have a visual represntation on the status monitor to see if a job is waiting for parts or services. This could be achieved by adding a small W in the top corner of each status icon. This would enable us to see at a glance what is happening with each job.

    47 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

  • Don't see your idea?

Feedback and Knowledge Base