eFactoryPro 3.0
287 results found
-
Remove field "Quantity Rejected" from RECEIVING page of the eFP Client.
SCS sometimes mistakenly enter & post a qty. in the field named QUANTITY REJECTED when receiving parts on a PO. This field doesn't appear to be necessary and should be removed or disabled so this error doesn't continue to occur.
1 voteDeclining the request due to the age of request without any votes or activity.
-
test
test
1 voteDeclining the request due to the age of request without any votes or activity.
-
SCS should not have the ability to change the Criticality on an Asset/Equipment ID in the eFP Client
Supply Chain Specialists should not have the ability to change the Criticality on an Asset/Equipment ID in the eFP Client
1 voteSupply Chain Specialists do not have the ability to update equipment records. If they are assigned another role that does have that capability, such as the Supervisor role, then they will be able to edit equipment records. I have communicated this to the requestor as well.
-
Repair Code
Repair Code , object = Slip Ring
1 voteDeclining the request due to the age of request without any votes or activity.
-
Site Specific BOMs
The BOM situation is terrible right now. I have parts for Trumpf lasers showing under the bom for my paint booth that has a specific asset number. I have an oven that shows over 800 parts on the bom, most of which have nothing to do with an oven. Those are just two examples. We did not have this problem when our assets had their own bom instead of being shared across all sites.
I should also mention that we do not even have any Trumpf equipment at our site, so its not like the parts were ordered under the…
2 votesDeclining the request due to the age of request without any votes or activity.
-
Add 2 year and 24 month choices for PM contract schedule rule, there are 4 year and 5 year choices, but no choices for 2 or 3 year?
Add 2 year and 24 months to the drop down in the client pm schedule rule
1 voteWas able to clarify with user that bi-annual frequency is to be used for PMs that should be performed every two years. A PM that should occur twice a year should have the semi-annual frequency.
-
Add cost to WO Information parts tab next to quantity
Our technicians currently would have to go to multiple reports or persons onsite to find out how much a part cost for a Work Order. When generating cost savings, it would be much faster if the technician could see the cost of the part on the work order next to quantity of parts under the parts tab.
1 votePer Mack Brown, part costs will not be made visible to site users in the technician Portal. A modified Power BI report will be used to get this information to them.
-
print from status screen
is there a way to print from the status monitor
1 voteRequestor was able to meet his reporting needs by using the Shift Turnover Report and the operating status and task template filters.
-
PO's / REQ's In "Post Pending" Status
We should be able to see All PO's for our Site that are in "Post Pending" Status Without Searching For A Req or PO. I have had a few PO's that have arrived on site that I am not able to receive . I am also wondering if this has anything to do with the New EDI requirement?
1 voteStatus filter on the Purchase Order screen allows users to filter their site’s purchase orders by the Post Pending status.
-
Customer Portal: Allow customer to designate WO as any priority level
I see response to other request/idea about manual priority selection, but we currently have quite a few customer WOs that are currently designated Emergency that do not warrant an immediate response. Would help customer engineers prioritize work that needs to be done, as we lack a planner scheduler on site
1 voteAfter reviewing this request with the OpEx leadership team, they have decided to continue with the current process of letting the system determine priority on customer requests. If the customer does not want an immediate response, they should not select the “requires immediate response” option when they create a work order.
-
Reports
I would like to have a scheduled report emailed to me daily at 6:00 am that contains all down equipment in my area. I would like it to include WO #, Asset ID, Asset location, Asset description, created on date, description of problem, technician assigned to the malfunction. I would like this in an excel format. This is something that could be set up in the CMMS that we used in KK (Llumin). Is it something that can be set up through efactory?
1 voteDeclining the request due to the age of request without any votes or activity.
-
pneumatic feild in material group
we need a pneumatic field in material group
1 voteDeclining the request due to the age of request without any votes or activity.
-
add Equipment ID to Technician screen
Expand the technician work screen: add Equipment ID to the table
1 voteDue to limited space on-screen, the Asset ID and Asset Description fields (Equipment and Description on-screen) were chosen to be displayed in the Task Summary screen. These fields are the ones that sites typically recognize and are not a system generated ID like the Equipment ID field.
With that being said, we are going to make the Equipment field on the Task Summary a hyperlink. This will allow users to link directly to the Equipment information from within a task, allowing them to see additional information such as Equipment ID.
-
FOLLOW UP MAINTENACE TASK FROM REACTIVE WORK ORDER
CREATE PROACTIVE FOLLOW UP MAINTENANCE TASK FROM A REACTIVE WORK ORDER
1 voteDeclining the request due to the age of request without any votes or activity.
-
Need Client Access on customer computer
Looking to streamline customer/planner/technician communications by having the real time eFactory Client planner schedule displayed publicly; a customer machine has already been allocated for this purpose, though I am only able to Remote In to the Client, which is time sensitive and becomes locked out due to inactivity.
1 voteDeclining the request due to the age of request without any votes or activity.
-
Adding selction
Loose wires should be in problem selection.
1 voteThank you for your feedback! Both codes currently exist in eFP 3.0. Wiring exists as an Object Code, and Loose exists as a Problem Code.
-
Number of open tasks on eqmt square
Could the number of open work orders be added to the equipment information square?
1 voteDeclining the request due to the age of request without any votes or activity.
-
Schedule Board Bugs
Several bugs with Schedule Board
1. Date/Day field gets corrupted when zoom is changed in Week mode
2. Constantly getting 'Expected place record with keys place_id=ST0000105678 not found
3. When i scroll to a Technician it scrolls back to the start periodically. Maybe related to bug 21 voteThis issue has been forwarded to the Help Desk and is being investigated by our Quality Assurance team. Incident ticket number for reference is INC000001185366.
-
Multiple reports into one
I am need reports collaborated together on the client side. 6 reports to go into 1 to save time. I was told from the help desk to use the feedback.
1 voteDeclining the request due to the age of request without any votes or activity.
-
Default Screen
Please make a way to change the default opening screen. I would be to be able configure what screen is when opening initially.
1 voteDeclining the request due to the age of request without any votes or activity.
- Don't see your idea?