eFactoryPro 3.0
293 results found
-
adding notes after closing task
allow me to add notes to a closed Task. i forgot to include something important on the note section before closing it out. now it wont allow me to add additional notes. thats dumb
2 votesClosing a task locks all data, per request from the business. This prevents data from being changed after it has been reported on the metrics.
-
Asset Numbers in Alphabetical Order
When searching for an asset whilst creating a work order the asset numbers are not in alphabetical order. For instance the following asset numbers appear in this order 6945-B, 6945-A, 6945. This is causing the customer to enter the wrong asset number. i.e. they will search for 6945 and just choose the first one on the list which is 6945-B.
2 votesDeclining the request due to the age of request without any votes or activity.
-
Another MRCT to MOTH idea
As an idea. Could we make it where certain machines could have a status like "under engineering" or "Out of Scope" and only allow MOTH or MPRO work orders to go under the cpsx #.
1 voteDeclining the request due to the age of request without any votes or activity.
-
Task Summary EDIT button disappears when task is marked Complete.
Recently, on the Task Summary window, the EDIT button disappears after marking a task "Complete".
We are now unable to change the Task Status so we can edit the task if more information is needed (i.e. add a part to be consumed).
Previously, the Edit button remained available until the task was "Reviewed".
Thank you.4 votesIf changes need to be made, reopen the completed task.
-
Receiving Document Data
The Receiving Document should only show the qualities received on the Receiving ID. Such As Receiving ID 161911 PO 586474 I only received 12 pcs on Line 1 and 6 pcs on Line 2. The Receiving Doc Shows 24 pcs on Line 1 and 12 pcs on Line 2.
1 voteDeclining the request due to the age of request without any votes or activity.
-
Change Time for Daily Update of Data Warehouse
Would it be possible to change the time when the data warehouse does its daily update? I have been informed that this is updated at 2am every night (in phases). For some of the daily metrics, it would be more beneficial if this data was updated closer to 5-6am for the daily operations meeting to capture any work orders that occurred during 3rd shift prior to that operations meeting.
Thanks,
Josh Boswell1 voteThe reason that the data warehouse is updated at this time is because it takes several hours for all the data to be refreshed. Doing it overnight has the least effect on users of the system.
-
BOM List from Portal Task
I would like to see the full BOM listing when i add a part to a task for an asset. It would not have to be automatic but if i had the option it would greatly improve my teams ability to find parts.
2 votesDeclining the request due to the age of request without any votes or activity.
-
Ability to Edit Asset Number
Please add the ability to edit the asset number on a work order. The customer frequently enters the incorrect asset number and the only way to change it is to create a new work order.
1 voteThe asset number can be changed as long as no labor, notes, or parts have been added to the work order. After those have been added, we can't change the asset due to data being tied to those objects.
-
print from portal P/S Template steps
Print from portal P/S tab Template steps.
1 voteDeclining the request due to the age of request without any votes or activity.
-
Schedule compliance PBI Metric
In the schedule compliance metric, the PMs are not considering as planned task until you indicated the start and finish planned, do that implies a lot of time because in a site there are 300 pms per week on average, and i consider its neecesary the pms will be taken by default as planned task in this metric
14 votesThere are measures in Power BI that already include all PMs as planned. The issue with the metric in question is most likely due to which data points were used to build the chart. This needs to be troubleshooted by the FMS System Support team.
-
Quick information on an asset based on Asset ID
Please add the capability to get basic information on a machine when an Asset ID is given. i.e. Description, sub location, pole location. Status i.e. up, down, reduced
Contact: Ian Aguirre - Caterpillar Facility Engineering, Pontiac IL Aguirre_Ian@cat.com
ATS Area Manager: Joe Erickson/Nathan Klein1 voteDeclining the request due to the age of request without any votes or activity.
-
Objects to be added
I’m working with site 065 here in the UK to analyse root causes and breakdown data.
We have a couple of difficulties with doing so because there are a number of very specialist machines which provide 90% of the product output in the facility. They are designed to turn plastic film into bags.
the majority of the object codes are listed as ‘other’ which doesn’t really help when looking at the whole asset population and those that are populated are too generic as these machines have a number of components that do not fit correctly into categories such as ‘heater’…1 voteDeclining the request due to the age of request without any votes or activity.
-
Full Reign on Task Edit Movement
Planner/Scheduler - Allow capability to move task freely. Currently it is limited to what the screen shows.
1 voteDeclining the request due to the age of request without any votes or activity.
-
Double Click selection
Planner/scheduler portal - remove double click option for easier selection to edit
1 voteDeclining the request due to the age of request without any votes or activity.
-
Add to Meter Functionality
Add a separate meters section for trending temperatures and pressures. This way the trends can be graphed and correlated to repairs or downtime events.
1 voteDeclining the request due to the age of request without any votes or activity.
-
Add an Object to the repair list.
Can we add GUARD or Guards to the list of Repair codes. Thank you
1 voteDeclining the request due to the age of request without any votes or activity.
-
Ability to use a Equipment/Product Type when creating a event monitor. For example being able to create a Facility or Tool Room monitor.
Add the choice of equipment/product type as a selection when creating an event monitor
1 voteDeclining the request due to the age of request without any votes or activity.
-
Need 3 Year PM Frequency in eFP 3.0
Pressurized vessels need to have safety relief valves replaced every 3 years (per industry standard and state inspector recommendation). We do not have the ability to create 3 year PMs at this time in eFP 3.0. This needs to be addressed as soon as possible. Thank you.
11 votesDeb,
We currently have a three-year PM frequency in the system. You will want to use the Schedule Rule of TRIANNUAL, which will make your PM due every three calendar years.
-
Planning wizard
Would it be possible to turn the active task while in the planning wizard into a hyperlink to the task. Also it would be nice to see the requestor in the planning wizard. this would help me understand who i can contact while planning a task and if i have any questions
1 voteDeclining the request due to the age of request without any votes or activity.
-
Follow up
Is there any way to automatically use the equipment number that you are currently making a follow up task for instead of having to physically put in the equipment number. Thank you!
5 votesThere is a lot of instances where the follow-up task would differ in asset from the PM. We would rather the technician take the time to enter the data in correctly.
- Don't see your idea?