eFactoryPro 3.0
311 results found
-
No suggestions for RCA
In the RCA portion of the work order. There should be an over travel selection in the problem field. Also something generic stating strictly "Machine" in the object field.
1 vote -
Failure Analysis Report
Failure Analysis Report
1 vote -
Task Completed Date
Please add column under " All Tasks" that shows the task completed date.
1 vote -
1 vote
-
Meters bubble doesnt show Red on meter required work orders/tasks
On tasks with meter entry required, the bubble doesnt show up as red like the steps/malfunction/etc when items are missing. This leads to confusion when techs cannot close the work order but dont see red on the bubbles.
1 vote -
Site 311 Support
I need this automatically added to all site 311 work orders except PM's
Instruct ATS to contact Quality on any item modified or replaced that has a calibration sticker or has a measurable reading recorded.
1 vote -
issue parts in SCS module needs to be streamlined
I would prefer not to have to click on stock first to issue stock... can't we just do it all in one click... not navigate to issue parts, then switch badges, then click on the lines, etc.
1 vote -
add Equpment ID # to paper copy of WO
Put the 3.0 equipment ID # on the work order as well as the Asset #
1 vote -
add techicians
From the portal/technician /task screen when changing or assigning technicians, is it possible to have the new technicians name appear on the screen immediately?
1 vote -
add est labor to technician task report(s)
add minutes to technician task readout
add equipment category to technician readout
1 vote -
Printing in Portal
On portal/technician/task/(green circle - print task
When you print the task it comes out very tiny and basically unreadable - can this be upgrades to print like a generated PM?
1 vote -
add time required to do PM - to go to excell
On PORTAL/TECHNICIAN/PLANNED START/ Why or can the time required to do the pm be a category that would transfer to the excel spreadsheet?
1 vote -
Increase PM generation windo
instead of the 28 day window, would it be possible to increase? 90 days would seem to make sense.
1 voteWe are working on developing the PM Management module inside the Portal. One of the included features will be to to customize the PM generation window for each PM at a site.
-
FM type tasks having a sub-type=PM or PD
FM type tasks, should they have a sub-statuses describing if they were created from a PM or PD type task?
1 vote -
***** change
On problem add new setup or ***** change
1 vote -
***** changes happen everyday
Add ***** change
1 vote -
For removal of broken bolts
Please add bolt
1 vote -
Operator PM's split from ATS PM's
In the drop down menu of the portal instead of "All open PM's", make 2 categories. One should be ATS PM's and one should be Customer PM's
1 vote -
On the EFP3 Technician screen the Asset number and the Equipment ID number should both be available for use.
On the EFP3 Technician screen the Asset number and the Equipment ID number should both be available for use.
1 vote -
Notes on PM Step
Add note on PM task at step level so techs don't have to exit out and go to notes section
1 vote
- Don't see your idea?