Proposal: Add the Repair Code field to the Shift Turnover Report. Justification: Including the Repair Code in the shift turnover report wil
Proposal:
Add the Repair Code field to the Shift Turnover Report.Justification:
Including the Repair Code in the shift turnover report will provide direct and timely access to essential operational data. Currently, BI reports are experiencing issues due to the recent V3 update, causing delays in data availability. By adding this field to the turnover report, we can ensure an immediate and reliable source of first-hand information, improving decision-making and reducing dependency on BI reports.27 votes -
daily capacity
Bring back the capability of seeing who is assigned and when they are assigned a task in period capacity when clicking on the task!!!!
7 votes -
Required Data Entry / Meter-Gauge Readings
There isn't an existing method to enter and record critical data that is needed to be collected, monitored, and trended. Requesting a form to allow critical data readings to be entered, recorded, and imported into Excel and/or PowerBI for historical trending.
39 votes -
Export the Job Plan list from the EFP portal.
Export the Job Plan list from the EFP portal.
23 votes -
Job plan steps format the same in the task as when viewed in planning
Text doesn't format the same between the job plan step editor and the actual task steps. A new text line in the planner doesn't show in the task, it just runs on until the end of the spacing. This makes it tricky to see each step as it's meant to be displayed, especially when there are multiple steps.
How the step displays in the job plan editor:
__1. Verify that machine specific Lockout/Tagout procedures are posted in clear sight for this equipment.
_2. Review LOTO procedures for accuracy to include any modifications that may have been made to…2 votes -
Improve "Feedback" function in Planning/job plans.
When sorting by "Feedback" in Planning/job plans, need to be able to tell if we have already addressed that issue. Today, when we sort by Feedback, it lists every job plan with feedback that was ever created. In order to see what has been addressed and what is new, the Planner has to re-review EVERY feedback note. Very impractical.
7 votes -
Dark mode option
Dark mode to prevent headaches and eye strain during long time use
1 vote -
Add the ability to create alert conditions for individual assets in the Event Monitor
Currently, alerts can only be set up based on the list found below. Our customer is requesting alerts on specific assets. Can Asset ID be included in this list?
Work Order Priority
Equipment Criticality
Operating Status
Work Order Status
Task Type
Sublocation
Task Type2 votes -
Add gearbox to the Object field under Add Repair Code
A big chunk of work goes under "see comments" when working motor/gearbox issues because no gearbox option exists and gear is too generic. This will aid in separating out work during analysis.
1 vote -
Adding a created date column to the period capacity
Adding a created date column to the period capacity so that you can easily see the age of tickets when adding to daily capacity. This will allow planners to more easily identify the age of tickets when building schedule and they know that they need to verify before moving into schedule. In theory tickets should be planned around the time they are created but this is not always the case.
1 vote -
MHM generated Work orders showing up on Status Monitor.
possible Status Monitor feature for MHM / EFP integration. When MHM creates a work order in EFP. It shows up on the Status monitor as like maybe a yellow block or magenta block or something. I assume most MHM generated work orders would be "up" work orders and most sites ignore or even hide Up assets on status monitors. But having MHM generated work orders show up on status monitor would 1. alert the supervisor or whoever is monitoring status monitor of an MHM event. 2. Show the customer that we are aware of potential issues and proactively addressing them.…
1 vote -
Customer adding attachments to WOs when they make them
I know this has been suggested before and the concern was bad actors would add malicious files. I'm wondering if it would be possible to let the customers add attachments in the screen where they enter new WOs and not just at any point in the process. I know it would be very beneficial to our site for customers to be able to enter pictures of problems.
2 votes -
slide bar window on scheduling assign sheet for task steps to be seen
add a slide bar to be able to see the steps involved in a pm while scheduling to daily cap.
1 voteThe team has decided to table this idea for the moment. We appreciate your input and may revisit it in the future.
-
conteo de horas
Mejorar que al finalizar el mes y comenzar el otro mes ,que no se borre el registro de mano de obra de ordenes ya cerradas ,para poder ver cuantas horas se lleva en la semana
1 vote -
Predictive Maintenance still generates
PDM tasks should generate as PdM task types instead of PM. Also, there should be some differentiation in FM tasks based on whether they come from PdM and PM's to allow for easier data analysis of PM and PdM Effectiveness.
7 votes -
Food Safety clicker / Adding Attachments
Could we add the possibility of having a 'Food Safety' option, just like there is a 'Safety Option' when entering a WO.
Also, could the customer portal have the option of adding a picture.
1 vote -
bring back tab
please bring back the Downed and reduced tabs as well as recent tasked
1 vote -
Add "Child Machine Type" to Equipment Group for Filtering and Metric Separation.
This will allow simplified asset registry filtering and metric separation from parent assets.
2 votes -
Making search easier
Add search operators to part search feature.
2 votes -
Cambio de unidad de horas a minutos en reporte
Buenas tardes,
Nos pudieran ayudar para que el reporte de shift turnover reporte venga el tiempo muerto, tiempo de reparación y tiempo labor en unidad de minutos con 2 decimales, por favor. Muchas gracias.1 vote