eFactoryPro 3.0
296 results found
-
PM Cancelations regenerate
If you cancel a PM in either the Portal or Client. the system will autogenerate a new PM for the same frequency. Can we please fix this so when you cancel a PM it stays cancelled. This is creating a big problem in a Sites PM Backlog.
54 votesWe have begun developing the PM Plan Management section of the Planner Module, which will allow users to create, modify, and schedule PMs. As part of this functionality, PM tasks that are canceled in the Work Module will not regenerate automatically.
-
PM Schedule Rules
There needs to be 12 WEEK, 24 WEEK and 48 WEEK PM schedule rules to match 4 WEEK. This allows for PMs to be scheduled to land on the exact same day of the week every time they generate. This makes is significantly simpler to schedule these PMs with the customer and minimizes downtime as the asset only needs to be down once for each PM event instead of multiple times. This allows a cadence to be established with the customer for equipment availability on a consistent basis. The most important benefit is that it allows for level loading of…
50 votesDevelopment work has started on the PM Management section of the Planner Module, which will allow users to create, modify, and schedule PMs from the Portal.
-
Add a checkbox in the client that allows PS to activate or disable PMs
The current method of cancelling PMs is time consuming. Adding a checkbox will help identify and label PMs as active or inactive without comprising the existing data in our system.There is no way to identify which PMs the site wishes to disable due to the PM no longer being needed or multiple PMs being combined into one.
40 votesDevelopment has begun to bring PM Management functionality to the Portal.
-
Technician Name Populated on Goods Receiving Document
Technician Name and Task or Work Order Number needs to be displayed on the goods receiving document in the Client. Currently i have to come out of the Client and into the Technician Portal and find the Task to find out which Technician ordered the part.
29 votes -
Predictive maintenance as PD, not PM in Task
Predictive maintenance Task Category in a Task Template shows up as PM Activity Type in the Task rather than PD Activity Type. Need to differentiate between the two Activity Types.
27 votes -
Add currency valuation function so we can get an accurate value of inventory and material usage by asset in the UK and Mexico
eFP3 currently has no foreign currency functionality. This means we are unable to manage inventory in the UK & Mexico using the system. Similarly all material usage by asset reports are inaccurate.
In order to globally utilise eFP3 effectively and efficiently the addition of a foreign currency function is required.
This would enable reports to be run in various currencies or to convert all values into a single currency. This could be as simple as a one-time conversion at the point of raising the PO based on a monthly exchange rate.
26 votes -
Task Planned Proccess Easier and Quicker
Would be helpful to have a quick access to the planner portal into the task to plan the task you are working on it, then once planned back to the task, and dont have to copy the task number, load the planner portal and search the task you want to plan. This would be easier and quiker our work.
25 votes -
Client: PRE-TASK ANALYSIS List expansion
Need the PM steps, "Pre-task analysis" statement on customer submitted PM work order to include more detail.
PRE-TASK ANALYSIS
Perform pre-task analysis before beginning work.
_Am I qualified and trained to do this Task? If not STOP and get help.
_Review each step of this Task prior to starting job.
_Do I have the correct tools, equipment, PPE and/or permits?
_Identify what hazards are present for each step of the job.
_Can I control each of those hazards before starting? If not STOP and get help.
_ If any unusual conditions exist write them in…25 votes -
To add a field for indicate if a Pm was audited
One opportunity that we see in e-Factory is that the system doesn´t have a field for to indicate if the PM was audited. We are suggesting a field as a check mark and with this, to get the option in a report for to verify quickly how many pm´s were audited. The field may be add to Shift turn over report.
24 votesunder review · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThis feedback is being examined by Operations leadership for possible inclusion in a future development sprint.
-
SCS need ability to add parts to BoM
Currently only SM & PS have access to manually add Part IDs to BoM. The SCS also needs this ability.
24 votes -
Provide ability to return parts to suppliers on PO they were bought on
Please provide the ability to return parts to suppliers on the same PO they were bought on even if ATS has already paid the supplier's invoice. We should be able to enter an RMA # from supplier and properly process any restocking fees by passing those fees on to our customer or choosing to absorb those fees internally if the return is not the fault of our customer. This process should also show as a credit to our customers on the monthly Billable PO report used for invoicing our customers.
23 votes -
Parent-Child Asset Relation Functionality
Need to have a parent-child relationship function added to the system. This is necessary for metrics, as if a child asset goes down, that is where the WO is put to. The parent asset is affected as a whole, though, so downtime needs to be considered there as well.
21 votes -
Part Status Icon located on work order's reserved parts listing.
Place a button along with "View Part Bin Info, Consume Part Need, Edit Part Need, and Cancel part need" that would query the parts need table and return if the req was released, due date, and tracking number for shipment.
21 votes -
Need tech portal access to asset notes like you can in client for high level information
Our site does not have the crib. Needs to be a way to see asset notes from the portal that are posted in the client. We can post important information like part numbers, set ups and so on in the client but very few people can see the information
21 votes -
Require Standard Part Nomenclature to Part Description
Parts need a standard description to search parts effectively (ex: All 1-7/16" 4-bolt Flange Block Bearings should be listed as: "1-7/16IN ID; 4B; FB" or all 480V 15HP 3500RPM 215 C-face motors should be listed as "15HP; 3500RPM; 215TC; 480V"). This will greatly increase the buyer and supply chain specialist's abilities to source parts from other local sites, vendors, or manufacturers.
If possible, this could be done as "required fields" when entering new parts into the system that auto-generate a part description from the fields.19 votes -
Include a column for Asset ID in the Review tab.
Not a necesity but would be nice.
19 votes -
Add "Planned Start Date" filters to work order report
When printing work orders, the current report does not allow for the specific week or period. Please add date filters for planned start date so that batch prints are directly related to the work being done.
16 votes -
ESM: Event Monitor Breakdown Filter
Add the functionality to the event monitor to filter out breakdowns for facility type equipment.
ESM - Equipment System Monitor
Planner/Supervisor
Add Filter by Equipment Group: Machine Type / Facility Type / Tool & Die / Sub-location16 votes -
Planner Portal
Add column in planning side showing items Waiting on material
15 votes -
Photos for parts
I think it would be a huge asset if we could add photos of parts to the database that appear where the "robot arm" is located in the parts screen. Would be good to be allowed multiple photos with arrows to cycle through them. I realize this could open an avenue for error but if a process for validation is created the benefits would be great I think.
14 votes