eFactoryPro 3.0
28 results found
-
daily capacity
Bring back the capability of seeing who is assigned and when they are assigned a task in period capacity when clicking on the task!!!!
17 votes -
Add gearbox to the Object field under Add Repair Code
A big chunk of work goes under "see comments" when working motor/gearbox issues because no gearbox option exists and gear is too generic. This will aid in separating out work during analysis.
12 votes -
Add a Status Reason for "Waiting on Engineering"
We often find ourselves with downtime that is waiting on Manufacturing Engineers in order to get the machine up and running. Adding a hold status reasoning for "Waiting on Engineering" would help us get all of the machines that need engineers to be more readily visible to both us and the customer, as well as helping drive for lower down counts.
10 votes -
Dark mode option
Dark mode to prevent headaches and eye strain during long time use
8 votes -
Adding a created date column to the period capacity
Adding a created date column to the period capacity so that you can easily see the age of tickets when adding to daily capacity. This will allow planners to more easily identify the age of tickets when building schedule and they know that they need to verify before moving into schedule. In theory tickets should be planned around the time they are created but this is not always the case.
7 votes -
Customer adding attachments to WOs when they make them
I know this has been suggested before and the concern was bad actors would add malicious files. I'm wondering if it would be possible to let the customers add attachments in the screen where they enter new WOs and not just at any point in the process. I know it would be very beneficial to our site for customers to be able to enter pictures of problems.
8 votes -
Add the ability to create alert conditions for individual assets in the Event Monitor
Currently, alerts can only be set up based on the list found below. Our customer is requesting alerts on specific assets. Can Asset ID be included in this list?
Work Order Priority
Equipment Criticality
Operating Status
Work Order Status
Task Type
Sublocation
Task Type5 votes -
Export the Job Plan list from the EFP portal.
Export the Job Plan list from the EFP portal.
24 votes -
slide bar window on scheduling assign sheet for task steps to be seen
add a slide bar to be able to see the steps involved in a pm while scheduling to daily cap.
4 votesThe team has decided to table this idea for the moment. We appreciate your input and may revisit it in the future.
-
conteo de horas
Mejorar que al finalizar el mes y comenzar el otro mes ,que no se borre el registro de mano de obra de ordenes ya cerradas ,para poder ver cuantas horas se lleva en la semana
1 vote -
Food Safety clicker / Adding Attachments
Could we add the possibility of having a 'Food Safety' option, just like there is a 'Safety Option' when entering a WO.
Also, could the customer portal have the option of adding a picture.
1 vote -
Cambio de unidad de horas a minutos en reporte
Buenas tardes,
Nos pudieran ayudar para que el reporte de shift turnover reporte venga el tiempo muerto, tiempo de reparación y tiempo labor en unidad de minutos con 2 decimales, por favor. Muchas gracias.1 vote -
DT required button added to job plan
Add a field in the Job plan template to indicate if this task requires DT
14 votesUnder review with IT team.
-
Equipment in Work module needs an additional field to identify "At Risk" equipment.
Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.
5 votes -
Operator Performed Maintenance sub-type should be available for MCRT type work orders.
Customer has requested all down work orders use sub-types to track responsibility for assets being down. The "Operator Performed Maintenance" sub type cannot be added to a MCRT work order. We need this sub-type to be available to MCRT work orders. Can have changed so it is available on MCRT?
5 votesAfter further review with the site, it seems there is a little confusion on this request.
"Operator error" the Operator causes the problem. "Operator performed maintenance" the Operator fixes the problem. The site is trying to use the sub-types to distinguish between who is responsible for resolving an issue and any extended downtime that occurred.
An example of "operator performed maintenance" 3rd shift operator has a non-maintenance machine issue related to training or experience that prevents running the machine. So, the machine sits idle with a down work order submitted. 1st shift operator arrives and being more experienced is able to fix the issue and begins running the machine.
This functionality will also be useful as our Operator-Performed Maintenance (OPM) program continues to grow within ATS. I am reopening the request to discuss further with our teams.
-
Determine type of job by work order on the review tab
If we can add type of job performed by work order as for example: Electric, Mechanic, Hydraulic, Pneumatic, Electronic, Lubrication, Coolant. We can determine Downtime & MTTR due to each of these, by plant, area, or technician. With this we can understand development needs by plant, area or technician, so we can set the trainings needed for our people and also track its effectiveness on each specific case
12 votesGreat suggestion! There is projects currently in place to tackle this exact issue. We are redefining the skills and skillsets for technicians, equipment, and for job requirements. These 3 will work together to specify development requirements for technicians and provide us with skillset requirements based on equipment requirements.
-
Task View
When I scroll down to look for a particular task and find and open the task, I found the task list jumps back to top of the list and then I have to scroll through the list again to find what I was looking for. I suppose if I noted the task number it would not be that big of an issue, but it would be handy if the list just stayed in the position that I stopped. Really a pain when you have multiple Work Orders.
5 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
Thank you for your feedback! We are looking into the technical requirements for making this happen.
-
Period Capacity Select all feature
Select all on period capacity – able to select all will be able to move all over to execution faster
11 votes -
To add a field for indicate if a Pm was audited
One opportunity that we see in e-Factory is that the system doesn´t have a field for to indicate if the PM was audited. We are suggesting a field as a check mark and with this, to get the option in a report for to verify quickly how many pm´s were audited. The field may be add to Shift turn over report.
24 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
This feedback is being examined by Operations leadership for possible inclusion in a future development sprint.
-
Fix time and day entry for android tablets
Fix this so that when used in landscape mode, the date and time entry doesn't show up in a tiny corner of your screen.
1 voteunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
Duane, thank you for your feedback! We are currently investigating the development effort needed in order to give all screens a landscape option. We will keep you updated on the progress.