Job plan steps should have an option to attach images
Planner/Schedulers should be able to attach image files (PNG/JPG/GIF) to specific steps in a job plan. The technician should be able to see those images for each step and enlarge them in the steps screen.
The downside of using attachments for the files is that 1) the tech has to go back and forth between steps and attachments, and 2) it's harder to organize the images based on a specific step
2 votes -
Equipment in Work module needs an additional field to identify "At Risk" equipment.
Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.
5 votes -
Operator Performed Maintenance sub-type should be available for MCRT type work orders.
Customer has requested all down work orders use sub-types to track responsibility for assets being down. The "Operator Performed Maintenance" sub type cannot be added to a MCRT work order. We need this sub-type to be available to MCRT work orders. Can have changed so it is available on MCRT?
5 votesAfter further review with the site, it seems there is a little confusion on this request.
"Operator error" the Operator causes the problem. "Operator performed maintenance" the Operator fixes the problem. The site is trying to use the sub-types to distinguish between who is responsible for resolving an issue and any extended downtime that occurred.
An example of "operator performed maintenance" 3rd shift operator has a non-maintenance machine issue related to training or experience that prevents running the machine. So, the machine sits idle with a down work order submitted. 1st shift operator arrives and being more experienced is able to fix the issue and begins running the machine.
This functionality will also be useful as our Operator-Performed Maintenance (OPM) program continues to grow within ATS. I am reopening the request to discuss further with our teams.
-
DT required button added to job plan
Add a field in the Job plan template to indicate if this task requires DT
14 votesUnder review with IT team.
-
Determine type of job by work order on the review tab
If we can add type of job performed by work order as for example: Electric, Mechanic, Hydraulic, Pneumatic, Electronic, Lubrication, Coolant. We can determine Downtime & MTTR due to each of these, by plant, area, or technician. With this we can understand development needs by plant, area or technician, so we can set the trainings needed for our people and also track its effectiveness on each specific case
12 votesGreat suggestion! There is projects currently in place to tackle this exact issue. We are redefining the skills and skillsets for technicians, equipment, and for job requirements. These 3 will work together to specify development requirements for technicians and provide us with skillset requirements based on equipment requirements.
-
Task View
When I scroll down to look for a particular task and find and open the task, I found the task list jumps back to top of the list and then I have to scroll through the list again to find what I was looking for. I suppose if I noted the task number it would not be that big of an issue, but it would be handy if the list just stayed in the position that I stopped. Really a pain when you have multiple Work Orders.
5 votesunder review · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThank you for your feedback! We are looking into the technical requirements for making this happen.
-
Period Capacity Select all feature
Select all on period capacity – able to select all will be able to move all over to execution faster
11 votes -
Fix time and day entry for android tablets
Fix this so that when used in landscape mode, the date and time entry doesn't show up in a tiny corner of your screen.
1 voteunder review · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedDuane, thank you for your feedback! We are currently investigating the development effort needed in order to give all screens a landscape option. We will keep you updated on the progress.
-
Need to see work order sub status in the Supervisor grid
As a supervisor, it would be helpful to see the Work Order sub-status (Cancel/duplicate) in the grid from the Review work order panel. This would allow you to see, at a glance, which PMs were just canceled vs. canceled/duplicate.
4 votes -
To add a field for indicate if a Pm was audited
One opportunity that we see in e-Factory is that the system doesn´t have a field for to indicate if the PM was audited. We are suggesting a field as a check mark and with this, to get the option in a report for to verify quickly how many pm´s were audited. The field may be add to Shift turn over report.
24 votesunder review · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThis feedback is being examined by Operations leadership for possible inclusion in a future development sprint.
-
Need a way to see work order waiting on parts to be consumed.
Is there a way to add a filter/report to make it easier to see these? I am at a new location and all of our parts are not loaded yet so we have to add the new part and then purchasing has to set up new 100 number and then add stock and then the WO can be closed after consuming material. As it is I have to go through each work order individually looking for these issues. Would be less time consuming if I could run a report or export and filter for these issues first thing of each…
2 votesunder review · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThank you for your feedback! We will take your suggestion to the business for possible inclusion in our development queue.
-
RCA Trigger App on Power BI
All sites should have an RCA trigger Document filled out by this point. Being able to create a report or app on power bi to quickly see if any RCA's have been triggered in the current month is a great time saving tool. Can we have a template created that sites can then use that addresses safety, Failure count, Downtime, Cost, etc. in accordance with the RCA Trigger Template from the Standards and Assessments page?
a mock up has been created at this link:
https://app.powerbi.com/groups/me/reports/40e32eec-836a-4f7c-baa9-32f0dc704dc4?ctid=786b8a42-d6d2-45f9-ac36-b35652395f2a5 votesunder review · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThank you for your feedback! Our Power BI analyst team is looking at your suggestion and determining how we could implement this.
-
Parent-Child Asset Relation Functionality
Need to have a parent-child relationship function added to the system. This is necessary for metrics, as if a child asset goes down, that is where the WO is put to. The parent asset is affected as a whole, though, so downtime needs to be considered there as well.
21 votes -
Create a report in Power BI for Mexico´s Labor
The idea is to create a report in Power BI where the sites can review the Technician´s Labor. This idea was created via e-mail last 4/4/2018. Michael Vincent created the reported and he added it into the Application section in Power BI but unfortunately the report is not working as we expected. We saw some opportunities, for example, when you select the report by month for an specific site, we can not see all the technician´s labor. Please contact to me if you have any question or doubt.
5 votesunder review · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThis suggestion has been shared with our Power BI Data Analyst to see what he is able to update on the existing report.
-
Down & Reduced in Tasks
Down and Reduced drop down. Can we have only open tasks show, instead of all. I have to go in and uncheck completed, reviewed, etc.
11 votes -
Control Center: Add Escalation condition for nuisance failures / high part spend
I would like to have an alert like an escalation for when a piece of equipment has X amount of failures in Y amount of time
Or when the cost of repair is above a set amount.
3 votesunder review · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThis request is currently being discussed with FMS Leadership for possible inclusion in the eFP 3.0 development queue.
-
Tech Portal: Add Predictive Support and Personnel tracking
The tracking of Predictive equipment cases and personnel is a very manual process right now that involves spreadsheets, SharePoint and Outlook.
We also don't have a process in place to effectively track the process from problems documented, to work orders created, repairs effected and cost savings/avoidance tied back to the original issue or root cause.
This will reduce man-hours needed for the current process and improve the tracking of program effectiveness and BI metrics.
7 votesThank you for the suggestion. We will discuss this with the product owner for possible inclusion in the development backlog.