Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

30 results found

  1. Proactive BoM building process

    Currently the only way BoMs are built is by consuming parts (retroactive approach given a breakdown happened), and manually adding parts from a critical spare analysis, or some similar project, and I think it would be worthwhile to have a proactive process.

    I'm picturing something like a button in the parts section where the tech could enter whatever part information he has available and a field to upload a nameplate picture. Then this submission goes to the SCS to review validate and either order for spare, or find/create a part ID and add to the BoM for future ordering purposes.…

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Supply Chain  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    It is better suited for the new supply chain portal rather than EFP.


    Implementing this feature will require additional infrastructure beyond data entry, while we see strong value in this concept, it will not be part of the "Day One" supply chain release. However, we have noted it as a placeholder for future development.

  2. BI Shift Turnover Report

    In the shift turnover report, the object / symptom / problem / resolution columns are very beneficial for REs to build out FMEA analysis. These columns' inputs are generated from the repair codes that techs select when completing the tasks, but there is an option for "Other - see comments" that is used when the standard selections do not apply. If we could have the report generate the comments that the techs input into those column fields instead of just listing "Other - see comments", it would save a lot of time having to go back and manually input the…

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Dark mode option

    Dark mode to prevent headaches and eye strain during long time use

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. BOM Updating Manually

    Currently in the system is it configured where a technician consumes a part, it is added automatically into the BOM of the equipment asset. I believe this function should be taken off. This often muddies up the BOMs where any small thing that can be consumed on an asset is added, where eventually a BOM can have 100, 200 etc line items. Moreover, when an item is updated and/or retrofitted, it will add that item but also have kept the previous item as well. If another person or technician goes into a BOM and looks for a part (Example motor)…

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    The current configuration was originally designed to ensure asset records don't remain empty, given that manual maintenance across every asset isn't scalable with our current resources, while also preserving cross-site visibility of parts history. Because this touches core operational workflows and historical site practices, any decision to alter this setup or to establish a formal auditing process requires review and alignment with leadership. We will continue to evaluate.

  5. Failure Code Update

    Currently there are no failure codes related to Washdowns or electrical shorts due to items getting wet. Can we add failure codes to capture this.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Customer adding attachments to WOs when they make them

    I know this has been suggested before and the concern was bad actors would add malicious files. I'm wondering if it would be possible to let the customers add attachments in the screen where they enter new WOs and not just at any point in the process. I know it would be very beneficial to our site for customers to be able to enter pictures of problems.

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Task notes formatting

    It would be helpful if we can add formatting to task notes like bullet points, separate paragraphs, indentations, etc. The job plans were updated to allow this formatting and it would be nice to have the same in task notes.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Add the ability to create alert conditions for individual assets in the Event Monitor

    Currently, alerts can only be set up based on the list found below. Our customer is requesting alerts on specific assets. Can Asset ID be included in this list?

    Work Order Priority
    Equipment Criticality
    Operating Status
    Work Order Status
    Task Type
    Sublocation
    Task Type

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Make cycle count consistant.

    When running stock count at the end of the month, it should not remove parts from the cycle count and then ding SCS metrics for it. For example, several times I have ran my cycle count last day of the month and not get 100% even though I entered 100% of what was on the list. This is due to the system creating its expected count on the 1st of the month (example 93 parts) but then NOT giving me the full count at the end of the month (ex 89 parts). Then it causes the SCS to have bad…

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We're currently working on a new supply chain portal that includes the cycle counts functionality. We'll keep this feedback in mind as we continue designing that experience. While we can't make any commitments about specific changes at this time, improving usability and layout are considerations we're taking into account as the new portal is developed.

  10. Export the Job Plan list from the EFP portal.

    Export the Job Plan list from the EFP portal.

    24 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. slide bar window on scheduling assign sheet for task steps to be seen

    add a slide bar to be able to see the steps involved in a pm while scheduling to daily cap.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. conteo de horas

    Mejorar que al finalizar el mes y comenzar el otro mes ,que no se borre el registro de mano de obra de ordenes ya cerradas ,para poder ver cuantas horas se lleva en la semana

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Food Safety clicker / Adding Attachments

    Could we add the possibility of having a 'Food Safety' option, just like there is a 'Safety Option' when entering a WO.

    Also, could the customer portal have the option of adding a picture.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Cambio de unidad de horas a minutos en reporte

    Buenas tardes,
    Nos pudieran ayudar para que el reporte de shift turnover reporte venga el tiempo muerto, tiempo de reparación y tiempo labor en unidad de minutos con 2 decimales, por favor. Muchas gracias.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. DT required button added to job plan

    Add a field in the Job plan template to indicate if this task requires DT

    14 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Equipment in Work module needs an additional field to identify "At Risk" equipment.

    Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Operator Performed Maintenance sub-type should be available for MCRT type work orders.

    Customer has requested all down work orders use sub-types to track responsibility for assets being down. The "Operator Performed Maintenance" sub type cannot be added to a MCRT work order. We need this sub-type to be available to MCRT work orders. Can have changed so it is available on MCRT?

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    After further review with the site, it seems there is a little confusion on this request.

    "Operator error" the Operator causes the problem. "Operator performed maintenance" the Operator fixes the problem. The site is trying to use the sub-types to distinguish between who is responsible for resolving an issue and any extended downtime that occurred.

    An example of "operator performed maintenance" 3rd shift operator has a non-maintenance machine issue related to training or experience that prevents running the machine. So, the machine sits idle with a down work order submitted. 1st shift operator arrives and being more experienced is able to fix the issue and begins running the machine.

    This functionality will also be useful as our Operator-Performed Maintenance (OPM) program continues to grow within ATS. I am reopening the request to discuss further with our teams.

  18. Determine type of job by work order on the review tab

    If we can add type of job performed by work order as for example: Electric, Mechanic, Hydraulic, Pneumatic, Electronic, Lubrication, Coolant. We can determine Downtime & MTTR due to each of these, by plant, area, or technician. With this we can understand development needs by plant, area or technician, so we can set the trainings needed for our people and also track its effectiveness on each specific case

    12 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Training  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    Great suggestion! There is projects currently in place to tackle this exact issue. We are redefining the skills and skillsets for technicians, equipment, and for job requirements. These 3 will work together to specify development requirements for technicians and provide us with skillset requirements based on equipment requirements.

  19. Task View

    When I scroll down to look for a particular task and find and open the task, I found the task list jumps back to top of the list and then I have to scroll through the list again to find what I was looking for. I suppose if I noted the task number it would not be that big of an issue, but it would be handy if the list just stayed in the position that I stopped. Really a pain when you have multiple Work Orders.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Period Capacity Select all feature

    Select all on period capacity – able to select all will be able to move all over to execution faster

    11 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
← Previous 1
  • Don't see your idea?