eFactoryPro 3.0
38 results found
-
Export the Job Plan list from the EFP portal.
Export the Job Plan list from the EFP portal.
24 votes -
To add a field for indicate if a Pm was audited
One opportunity that we see in e-Factory is that the system doesn´t have a field for to indicate if the PM was audited. We are suggesting a field as a check mark and with this, to get the option in a report for to verify quickly how many pm´s were audited. The field may be add to Shift turn over report.
24 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
This feedback is being examined by Operations leadership for possible inclusion in a future development sprint.
-
Parent-Child Asset Relation Functionality
Need to have a parent-child relationship function added to the system. This is necessary for metrics, as if a child asset goes down, that is where the WO is put to. The parent asset is affected as a whole, though, so downtime needs to be considered there as well.
21 votes -
Technician Repair Notes Visibility
There is not a great way to see historical repair notes on equipment. In the equipment Module there should be a column on the task history that contains the tech repair notes on assets so this information can be quickly referenced and exported for understanding repair history and used for reliability analysis.
17 votes -
DT required button added to job plan
Add a field in the Job plan template to indicate if this task requires DT
14 votesUnder review with IT team.
-
Determine type of job by work order on the review tab
If we can add type of job performed by work order as for example: Electric, Mechanic, Hydraulic, Pneumatic, Electronic, Lubrication, Coolant. We can determine Downtime & MTTR due to each of these, by plant, area, or technician. With this we can understand development needs by plant, area or technician, so we can set the trainings needed for our people and also track its effectiveness on each specific case
12 votesGreat suggestion! There is projects currently in place to tackle this exact issue. We are redefining the skills and skillsets for technicians, equipment, and for job requirements. These 3 will work together to specify development requirements for technicians and provide us with skillset requirements based on equipment requirements.
-
Enhancement Request: Man-Hours Visibility and Reporting in Efactory
Enhancement Proposal: Man-Hours Visibility in Efactory
Currently, Efactory allows users to view and export maintenance activity durations (clock hours) through reports such as Forecast, PM Forecast, and other operational queries. However, there is no visible or exportable field that represents the Man-Hours (MH) required to execute these activities.
Current Situation
When configuring preventive or corrective maintenance activities in Efactory, the system already captures the information needed to calculate Man-Hours:
Activity duration (clock hours)
Number of assigned technicians
Hours assigned to each technicianAlthough this data already exists within the system, it is not currently available for direct viewing or export.
…
11 votes -
Dark mode option
Dark mode to prevent headaches and eye strain during long time use
11 votes -
Period Capacity Select all feature
Select all on period capacity – able to select all will be able to move all over to execution faster
11 votes -
Down & Reduced in Tasks
Down and Reduced drop down. Can we have only open tasks show, instead of all. I have to go in and uncheck completed, reviewed, etc.
11 votes -
Incorporate Customer approval step into eFP
Our customer already requires that a 'handback form' is completed before machines can be put back into service when technicians have done work on them.
Please incorporate an extra feature into each task in eFP for 'CUSTOMER APPROVAL'.
When the technician checks a 'request handback approval' it emails the work order creator details of the closed work order including the steps, parts used, and notes with a link to approve the work completed.9 votesAfter reviewing this with Nate and team, we've decided to table this request for now. Because this approval workflow is specific to one site's requirements rather than a broader need across all sites, we are prioritizing enhancements that benefit the wider user base first.
We appreciate you bringing this use case to our attention and will keep it logged in case similar handback requirements expand to other sites in the future
-
Proactive BoM building process
Currently the only way BoMs are built is by consuming parts (retroactive approach given a breakdown happened), and manually adding parts from a critical spare analysis, or some similar project, and I think it would be worthwhile to have a proactive process.
I'm picturing something like a button in the parts section where the tech could enter whatever part information he has available and a field to upload a nameplate picture. Then this submission goes to the SCS to review validate and either order for spare, or find/create a part ID and add to the BoM for future ordering purposes.…
9 votesIt is better suited for the new supply chain portal rather than EFP.
Implementing this feature will require additional infrastructure beyond data entry, while we see strong value in this concept, it will not be part of the "Day One" supply chain release. However, we have noted it as a placeholder for future development.
-
Scheduled/Unscheduled Downtime in Malfunction Screen
Today in the Malfunction Screen there is logic built in that determines if a Malfunction is considered a Breakdown which dictates if the Downtime/Reduced time is "Scheduled" or "Unscheduled". This logic does not accurately show this and causes excess rework to modify tasks to place the data into the right category. This causes inaccuracy in downtime calculations and Eaton CONC calculations which we are held accountable to with our customers. We should remove the logic with these breakdowns and create a toggle for the user to define if the Downtime is Scheduled or Unscheduled with Unscheduled being the default category.
8 votes -
criticality
Add asset Criticality to the technician my work boxes in their daily queue in the visual box for technicians to understand which p.m.'s to complete first. on larger sites the first focus for p.m.'s Daily and monthly are for Crit1,2 p.m.'s to be completed and when tech have 5-7 p.m.'s in their queue there is no way to tell easily without loading each task and scrolling. currently we populate "Crit 1" at the front of our PM description for indicators but with changing criticality this will prevent having to open all of the job plans for each of the 100…
7 voteswe are reviewing this ask alongside our broader Daily Capacity planning to determine the best path forward.
-
Tech Portal: Add Predictive Support and Personnel tracking
The tracking of Predictive equipment cases and personnel is a very manual process right now that involves spreadsheets, SharePoint and Outlook.
We also don't have a process in place to effectively track the process from problems documented, to work orders created, repairs effected and cost savings/avoidance tied back to the original issue or root cause.
This will reduce man-hours needed for the current process and improve the tracking of program effectiveness and BI metrics.
7 votesThank you for the suggestion. We will discuss this with the product owner for possible inclusion in the development backlog.
-
BI Shift Turnover Report
In the shift turnover report, the object / symptom / problem / resolution columns are very beneficial for REs to build out FMEA analysis. These columns' inputs are generated from the repair codes that techs select when completing the tasks, but there is an option for "Other - see comments" that is used when the standard selections do not apply. If we could have the report generate the comments that the techs input into those column fields instead of just listing "Other - see comments", it would save a lot of time having to go back and manually input the…
5 votesWe are putting this idea on hold due to the precedence of the SC project; however, the requirements remain under review
-
Add the ability to create alert conditions for individual assets in the Event Monitor
Currently, alerts can only be set up based on the list found below. Our customer is requesting alerts on specific assets. Can Asset ID be included in this list?
Work Order Priority
Equipment Criticality
Operating Status
Work Order Status
Task Type
Sublocation
Task Type5 votes -
Equipment in Work module needs an additional field to identify "At Risk" equipment.
Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.
5 votes -
Operator Performed Maintenance sub-type should be available for MCRT type work orders.
Customer has requested all down work orders use sub-types to track responsibility for assets being down. The "Operator Performed Maintenance" sub type cannot be added to a MCRT work order. We need this sub-type to be available to MCRT work orders. Can have changed so it is available on MCRT?
5 votesAfter further review with the site, it seems there is a little confusion on this request.
"Operator error" the Operator causes the problem. "Operator performed maintenance" the Operator fixes the problem. The site is trying to use the sub-types to distinguish between who is responsible for resolving an issue and any extended downtime that occurred.
An example of "operator performed maintenance" 3rd shift operator has a non-maintenance machine issue related to training or experience that prevents running the machine. So, the machine sits idle with a down work order submitted. 1st shift operator arrives and being more experienced is able to fix the issue and begins running the machine.
This functionality will also be useful as our Operator-Performed Maintenance (OPM) program continues to grow within ATS. I am reopening the request to discuss further with our teams.
-
Task View
When I scroll down to look for a particular task and find and open the task, I found the task list jumps back to top of the list and then I have to scroll through the list again to find what I was looking for. I suppose if I noted the task number it would not be that big of an issue, but it would be handy if the list just stayed in the position that I stopped. Really a pain when you have multiple Work Orders.
5 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
Thank you for your feedback! We are looking into the technical requirements for making this happen.
- Don't see your idea?


