Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

306 results found

  1. Cancelled Work Orders should say why they were cancelled

    Cancelled work orders should have reason stating why the work order was cancelled.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Add PO Events for changes to Due Dates on PO lines.

    Need an Event to show Date/Time and CreatedBy for any changes to PO line Due Date.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. at least reduce the space the headers use.

    Please remove the split screen. I access this site on my phone while on the go, with the split screen, 100% useless.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Tech Portal: Add Predictive Support and Personnel tracking

    The tracking of Predictive equipment cases and personnel is a very manual process right now that involves spreadsheets, SharePoint and Outlook.

    We also don't have a process in place to effectively track the process from problems documented, to work orders created, repairs effected and cost savings/avoidance tied back to the original issue or root cause.

    This will reduce man-hours needed for the current process and improve the tracking of program effectiveness and BI metrics.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Control Center: Add Escalation condition for nuisance failures / high part spend

    I would like to have an alert like an escalation for when a piece of equipment has X amount of failures in Y amount of time

    Or when the cost of repair is above a set amount.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Lock out matrix and tools need to perform task based maintenance should be included in RJP to increase efficiency and safety.

    Task based lock out matrix can be added to the RJP template as well as any tools or PPE required to perform the job correctly and safely.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
1 2 12 13 14 16 Next →
  • Don't see your idea?