Have a way to schedule workorders back to individual as you reopen it, and be able to flag it so the technician Knows
Have a way to schedule workorders back to the individual as you reopen it, and be able to flag it so the technician can Easly identify it needs reworked
7 votes -
Parts search and adding
Adding parts to a work order is to complicated. It is taking technicians double the time to find the part in the system and then add it to the work order. I like what was added as far as the advanced filtering capabilities goes but that should be a separate option. Having the search default to the BOM of the equipment is not helpful since not every item you work on has an asset id. We need a basic search capability like we had before with my site stock and that would satisfy 90% of all technician parts needs.
13 votes -
Quality Assurance Request: Send Notifications when Regulatory PM task date is modified
This is a new position in Mexico and as part of my role, I need to receive a notification when a regulatory PM task date is modified. I already contact the support IT team and this option is not currently available. Please, can you assist?
10 votes -
Period capacity canceling task selection
Allow canceling tasks within the scheduling portal period capacity screen. Being able to select / check multiple tasks would drastically reduce time and bandwidth requirements.
3 votes -
dark mode
add a dark mode
12 votes -
It would be nice to have the ability to create a work order from the planning task screen
It would be nice to have the ability to create a work order from the planning task screen.
3 votes -
New Repair Codes
New Repair codes for cFactory Pro
Laser
Anode
Circuit Board7 votes -
Refresh button in work module
Within the work module of eFP, for the work order and task grid, can we get a refresh button, which would allow us to refresh the data. This helps with newer work orders which have been entered into the system.
6 votes -
Field Addition to Filter within Re work order review
Add the Field "Break Down" to the filter within the Work : Review screen.
1 vote -
Quantity Adjustment
Supply chain specialists and technicians need to be able to adjust the quantity of parts ordered both up and down. Not allowing people to adjust upwards is not efficient and makes no sense at the site level.
6 votes -
Customer view Parts in system
Allow customers to see parts associated with each asset and locations within store rooms to better utilize system and ATS personnel as we wouldn't need to ask them to locate parts for us.
2 votes -
1 vote
-
9 votes
-
Include a column for Asset criticality in the Tasks portal.
We have almost 200 WO tasks with a priority 3 status. It would be nice to see the asset criticality to prioritize the wo tasks.
7 votes -
Posting PO generates parts label to be printed
Instead of generating a receipt document to print or save, have that receipt generate as a document attached to that PO receipt transaction and have the system generate a parts label so that you don't have to copy and paste everything from the client into the parts label reports every time you receive an inventory item in.
4 votes -
8 votes
-
Need excel export to include entire filtered selection
Period capacity currently exports only 100 rows. My exports would usually contain 400-500. I use this to allow the customer to see what work we have scheduled for a particular week.
7 votes -
Equipment tags
For customers and for ATS users... on equipment add a section to add equipment tags. This could be used for users to input other nicknames used for the asset to help when searching for equipment when creating work over. The customers have trouble searching Assets when creating work order
2 votes -
Task View
When I scroll down to look for a particular task and find and open the task, I found the task list jumps back to top of the list and then I have to scroll through the list again to find what I was looking for. I suppose if I noted the task number it would not be that big of an issue, but it would be handy if the list just stayed in the position that I stopped. Really a pain when you have multiple Work Orders.
5 votesunder review ·AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) responded
Thank you for your feedback! We are looking into the technical requirements for making this happen.
-
Planner Portal scheduling board that has a weekly view For PS to drop an entire weeks schedule onto that can have individual days selected
currently I use an Excel workbook with a sheet for each day. i print out each day and bring it to tier one meetings for technicians and a copy is emailed to customer so they know what machines we plan on taking each day. every cell on that page has to be filled out on every task each day of each week.
I propose a week display where you fill in a selected task number and it auto populates the rest of the information (asset iD, description of task, a blank notes section that can add notes if needed, planned…4 votes