Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

311 results found

  1. Adding Sublocation description on Work order print

    When using work order print on report server, the sublocation number is given. It would be more user friendly if this was the sublocation description instead.

    8 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Need to see work order sub status in the Supervisor grid

    As a supervisor, it would be helpful to see the Work Order sub-status (Cancel/duplicate) in the grid from the Review work order panel. This would allow you to see, at a glance, which PMs were just canceled vs. canceled/duplicate.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Parent-Child Asset Relation Functionality

    Need to have a parent-child relationship function added to the system. This is necessary for metrics, as if a child asset goes down, that is where the WO is put to. The parent asset is affected as a whole, though, so downtime needs to be considered there as well.

    21 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  3 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Add Equipment creation date in the Equipment list report

    We need that the Equipment list in the SS reports cointains the date of creation of each equipment. We are having this request from our customers.

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Change Labor Hours to Rolling 30 days

    Labor hours should display last 30 days instead of hours entered in the current month. When the first day of the month occurs, the Labor Hours screen is blank.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Need the ability to create an escalation/event monitor per equipment/asset

    A need has been identified to create Escalations/ Event Monitor for either an individual or a collection of equipment/assets.

    If given this level of control in the escalation process we would be able to escalate particular down time occurrences to the proper people without "spamming" a host of individuals.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Buyers need ability to reverse receipt on Parts PO even though an invoice has already posted against the PO.

    Buyers need ability to reverse receipt on Parts PO even though an invoice has already posted against the PO. Need the system to allow Buyers to modify open qty. on the PO regardless if there is a partial receipt or not.

    13 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Add model #'s to Equipment page

    Portal-Equipment
    Need to have model # displayed.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. PdM Follow Up Tasks

    We need the ability to assign follow up tasks on PdM Work Orders to a specific asset (maybe have a drop down box). Currently, most PdM work orders are routes for the entire facility. Instead of creating a PdM work order for each asset, we would like to have the ability to assign follow up tasks on this work order type to assets.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. closing tasks

    There are too many steps to close a work order that does not belong to ATS and does not impact our metrics. i have tp close approximately 150 work orders from other non-ats department's.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Bill of Materials Report-Add Bin Location

    The Bill of Material (BOM) report in the client should include the bin location of each part listed on the BOM. This way it's easier for a tech or SCS or Planner etc to physically look for these parts in the Crib.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Multi Select Option

    Option to choose multiples Task status in shift turn over report (Multi select option)

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. When Part ID is added/extended to a site in eFP Client, the system should create a Stock Escalation if a Min/Max >0 is entered.

    When a Part ID is added/extended to a site in the eFP Client, the system should create a Stock Escalation if a Min/Max >0 is entered. It normally does this when a Part ID already exists at a site but it does not generate a Stock Escalation when a Part ID is initially added to a site Stock Record. We need to initiate this to comply with SAR (Stock Auth. Req.) process.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Remove Delete buttons for SCS on Run Log

    SCS delete Run IDs from the Run Log thinking it will delete the actual Stock Count Run but it only deletes the historical data reported on the Run Log. The DELETE buttons should be removed from the Client on the Run Log.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. SCS need ability to add parts to BoM

    Currently only SM & PS have access to manually add Part IDs to BoM. The SCS also needs this ability.

    24 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    8 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Stock Count should not allow new Stock to be created by user if a previous Stock Count is still open.

    We could avoid Stock Count Exceptions if eFP did not allow users to create a new Stock Count Run if a previous Stock Count Run ID is still open.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Stock Count creation should require Place ID be entered.

    The Stock Counts should require Place ID to be entered in filed provided. eFP currently shows Place ID field is Required field but the system does not actually require it. Sites often mistakenly run Stock Counts wide-open for All materials sites.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Error al correr reporte con el portan el Español

    Cuando cambias el lenguaje a Español, al querer generar los reportes aparece el error: "falta un valor en el parametro lenguaje" y no te deja correr ningún reporte. cambie el idioma nuevamente a Ingles y ya me dejo correr el reporte.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Down time and escalation time have different counters

    We have a problem with the programation of the system. For example our client has a production schedule from 6:30am to 12:00 am, if our client enter a WO for a reactive work at 11:30 pm, the down time starts from 11:30 pm it is interruptted at 12:00am and then starts counting again at 6:30am, we dont have problem with that. The problem is the scalation system: If our client enter a WO for a reactive work at 11:30pm the time for scalation starts counting and it doesnt stop at 12:00am, it continuing counting. This situation provoques scalations for high…

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. SCS should not have the ability to perform a manual cost change for parts in the eFP Client

    SCS should not have the ability to perform a manual cost change for parts in the eFP Client.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Feedback and Knowledge Base