Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

311 results found

  1. Need ability to run Escalations Report for specific site instead of wide open for all sites

    Need ability to run Escalations Report i Client and SSRS web page for specific site instead of wide open for all sites - currently there is not an option avl. to select one site

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Predictive maintenance as PD, not PM in Task

    Predictive maintenance Task Category in a Task Template shows up as PM Activity Type in the Task rather than PD Activity Type. Need to differentiate between the two Activity Types.

    27 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  10 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Inventory Stat Report should have the Customer Account included in the unsimple report

    Inventory Stat Report should have the Customer Account included in the unsimple report

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Reporting and BI  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Enable Add Assembly

    Give sites the ability to "Add Assemblies" for parts in inventory. It would be very helpful to add an assembly list of parts that are used to create another part (e.g. a pump could have bearings, gaskets, and an impeller as assembly parts)

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Work order tech remarks on PRINTED work order

    When printing work orders, notes are listed without date/time/tech name information. This makes it difficult to see a timeline of events and who did what tasks. Each line of NOTES entry should start with [DATE comment entered] [TIME comment entered] [TECH that entered comment]. Beginning of each comment like would look like this "08/02/2018 06:00 JRAMSEY ....". eFP2 did this and was very useful.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. RCA Trigger App on Power BI

    All sites should have an RCA trigger Document filled out by this point. Being able to create a report or app on power bi to quickly see if any RCA's have been triggered in the current month is a great time saving tool. Can we have a template created that sites can then use that addresses safety, Failure count, Downtime, Cost, etc. in accordance with the RCA Trigger Template from the Standards and Assessments page?

    a mock up has been created at this link:
    https://app.powerbi.com/groups/me/reports/40e32eec-836a-4f7c-baa9-32f0dc704dc4?ctid=786b8a42-d6d2-45f9-ac36-b35652395f2a

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. We need to be able to track response time and MTTR for Safety work orders for our KPI as defined by our customer.

    Need to be able to track response time and MTTR for safety work orders for our KPI.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Add Data Field "Remarks" to Accumulated Labor Report

    In order to determine PM effectiveness, adding the data field "Remarks" to the Accumulated Labor report will give us the ability to sort PM's where something was found or adjusted, from PM's that were "Completed". The Shift Turnover report does not allow you to pull all work orders that had labor in a specific month.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Can't cancel work order when task is already canceled

    If a task has been canceled you can't go to the work order to cancel it. The work order stays open

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Lock out matrix and tools need to perform task based maintenance should be included in RJP to increase efficiency and safety.

    Task based lock out matrix can be added to the RJP template as well as any tools or PPE required to perform the job correctly and safely.

    0 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Parent-Child Asset Relation Functionality

    Need to have a parent-child relationship function added to the system. This is necessary for metrics, as if a child asset goes down, that is where the WO is put to. The parent asset is affected as a whole, though, so downtime needs to be considered there as well.

    21 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  3 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Create a report in Power BI for Mexico´s Labor

    The idea is to create a report in Power BI where the sites can review the Technician´s Labor. This idea was created via e-mail last 4/4/2018. Michael Vincent created the reported and he added it into the Application section in Power BI but unfortunately the report is not working as we expected. We saw some opportunities, for example, when you select the report by month for an specific site, we can not see all the technician´s labor. Please contact to me if you have any question or doubt.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Adding the parts section to the WO print out

    It would be beneficial for the Techs if the parts need section appeared when a WO is printed. Currently there is a part used section, and I would think that we could add a sub set in this section of the print out.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    3 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Add to shift turn over report if a task was marked as PROACTIVE

    Hi, there´s no reports in SSRS that shows if a task was marked as PROACTIVE. This information will help a lot to the Planners & Schedulers if they want to see quickly which task are PROACTIVE, not just the Pm´s, PD´s and FM´s. I request add this information in the Shift Turn Over report and in Labor report.

    14 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Equipment & Sub-Locations in Tech Portal

    Split out equipment and sub-locations

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. MACHINE DETAILS ON WORKORDER IN THE CLIENT.

    When looking up a work order in the Client it no longer (very rarely) shows you the work order details for machine. The is crucial to us (sc & s/p) to have this.

    **I have placed in tickets and no matter what it has always come back as "resolved" even if it the problem has not been corrected.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Part Status Icon located on work order's reserved parts listing.

    Place a button along with "View Part Bin Info, Consume Part Need, Edit Part Need, and Cancel part need" that would query the parts need table and return if the req was released, due date, and tracking number for shipment.

    21 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Need tech portal access to asset notes like you can in client for high level information

    Our site does not have the crib. Needs to be a way to see asset notes from the portal that are posted in the client. We can post important information like part numbers, set ups and so on in the client but very few people can see the information

    21 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Down & Reduced in Tasks

    Down and Reduced drop down. Can we have only open tasks show, instead of all. I have to go in and uncheck completed, reviewed, etc.

    11 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  5 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Feedback and Knowledge Base