Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

264 results found

  1. Control Center: Add Escalation condition for nuisance failures / high part spend

    I would like to have an alert like an escalation for when a piece of equipment has X amount of failures in Y amount of time

    Or when the cost of repair is above a set amount.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Tech Portal: Ability to Edit 'Part Need' Location (ATS/CUSTOMER)

    Could we make it where you can edit the (Location From) when you click on the Actions / Edit Part Need in EFP 3.0 portal.

    Tech Portal
    Part need
    Edit the location for ATS or Customer stock location

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. ESM: Event Monitor Breakdown Filter

    Add the functionality to the event monitor to filter out breakdowns for facility type equipment.

    ESM - Equipment System Monitor
    Planner/Supervisor
    Add Filter by Equipment Group: Machine Type / Facility Type / Tool & Die / Sub-location

    16 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    5 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Tech Portal: Add Predictive Support and Personnel tracking

    The tracking of Predictive equipment cases and personnel is a very manual process right now that involves spreadsheets, SharePoint and Outlook.

    We also don't have a process in place to effectively track the process from problems documented, to work orders created, repairs effected and cost savings/avoidance tied back to the original issue or root cause.

    This will reduce man-hours needed for the current process and improve the tracking of program effectiveness and BI metrics.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
1 2 10 11 12 14 Next →
  • Don't see your idea?

Feedback and Knowledge Base