Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

272 results found

  1. Machine Downtime Values

    In the equipment portal a field needs to be reserved for Machine Downtime Values that can be updated annually during machine criticality reviews. This will help quantify the value of downtime reductions and prevent back and forth with customer on agreed downtime rates. Will enable reporting capability that is a manual process today.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Add Asset ID to the task list on the EFP IOS App

    When technicians receive a task list in the EFP IOS App they do not have visibility of the asset id unless they click into the task. This can create extra steps and data integrity misses when common job plans/pms are added to multiple tasks/assets in a shift.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Mobile  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. System Generated Auto Scheduling

    Would cut down on time if there was a method to auto-populate schedule with items that are planned and within an upcoming compliance window. Have a "suggested" auto schedule that could be edited or added-subtracted from after posting.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Required Data Entry / Meter-Gauge Readings

    There isn't an existing method to enter and record critical data that is needed to be collected, monitored, and trended. Requesting a form to allow critical data readings to be entered, recorded, and imported into Excel and/or PowerBI for historical trending.

    39 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Change asset IDs without having to delete time, repair, and malfunction.

    When an operator submits a task with the wrong asset id, and it isn't noticed until after labor and notes have been added, they have to be deleted and put back on once the asset ID has been changed.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Change color of Reduced Status

    Change color of operating status - Reduced - to further differentiate between Red Down. Reduced looks orange/too similar.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Change Asset Search Criteria when creating new work order to "contains"

    Change the Search functionality in the work order generation portal that the customer uses from Equals to Contains. By changing the search function to contains, it will help the customer find specific sub-assets that are tied to a main asset without having the exact wording. should reduce the number of workorders input incorrectly on asset name and also make it easier to find the asset when entering work orders

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Repair Notes Visibility

    Create a report presenting repair notes per Task Number or add repair notes to the remarks or add repair notes to the shift turnover report.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Add the PO Line to the Billable PO Report with Simple View = Y

    Can we please add the PO line to the Billable PO report with Simple View = N? Without the PO Line, one cannot combine this report with other purchasing reports.
    For some reason, the Simple View = Y has both the PO Number & PO Line

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Filter for Task Sub-type in the Review window

    Filter for Task Sub-type in the Review window

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    planned  ·  0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. status monitor screen show equipment in form of a map

    have a map of the facility with each piece of equipment located and labeled where it is. That way anyone who walks into the building can locate any piece of equipment by looking at the status monitor. still have it change color for status.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. full circle

    let's add a notes added by Columb so we can quickly look up any work orders we added notes to.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Training  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. full circle

    Lets connect parts arrival notifications to e-mail the originator and the scheduler so we can plan repairs.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. fix efactory to actually work between the hours of 4 am and 5 am est we have put in multiple tickets for this problem and nothing has fixed

    fix efactory to actually work between the hours of 4 am and 5 am est we have put in multiple tickets for this problem and nothing has fixed this is horrible for metrices with not being able to access work orders between these hours this is an ongoing problem falling on nothing but deaf ears

    10 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Job plan steps should have an option to attach images

    Planner/Schedulers should be able to attach image files (PNG/JPG/GIF) to specific steps in a job plan. The technician should be able to see those images for each step and enlarge them in the steps screen.

    The downside of using attachments for the files is that 1) the tech has to go back and forth between steps and attachments, and 2) it's harder to organize the images based on a specific step

    10 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Scrolling in Scheduling Portal causes filtered list to reset column widths

    When scrolling down in list of tasks on Scheduling Portal Period Capacity to columns reset width so the data I'm looking for is hidden, have to keep resetting column width. Description field is what I'm focused on.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. 3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. FM task completion notifications

    I want to be automatically notified when certain FM tasks that I did not create are completed.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. additional fields in shift reports

    The labor comments and the notes sections need to have their own separate fields when displaying in the shift turnover report.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. 4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Feedback and Knowledge Base