add time required to do PM - to go to excell
On PORTAL/TECHNICIAN/PLANNED START/ Why or can the time required to do the pm be a category that would transfer to the excel spreadsheet?
1 vote -
Multi Select Option
Option to choose multiples Task status in shift turn over report (Multi select option)
6 votes -
FM type tasks having a sub-type=PM or PD
FM type tasks, should they have a sub-statuses describing if they were created from a PM or PD type task?
1 vote -
Remove Delete buttons for SCS on Run Log
SCS delete Run IDs from the Run Log thinking it will delete the actual Stock Count Run but it only deletes the historical data reported on the Run Log. The DELETE buttons should be removed from the Client on the Run Log.
6 votes -
SCS Section in Portal should have an open PO report
I think it would be a great idea if the SCS side of the Portal to have a screen that shows all open items in the system. In other words, it should show all open POs that in the system. This will take the place of having to run the Purchase Order Detail Report. At my site, there are POs that were posted for over a year that needs to be displayed. This way, it won't slow down the reporting server.
2 votes -
Stock Count should not allow new Stock to be created by user if a previous Stock Count is still open.
We could avoid Stock Count Exceptions if eFP did not allow users to create a new Stock Count Run if a previous Stock Count Run ID is still open.
6 votes -
Stock Count creation should require Place ID be entered.
The Stock Counts should require Place ID to be entered in filed provided. eFP currently shows Place ID field is Required field but the system does not actually require it. Sites often mistakenly run Stock Counts wide-open for All materials sites.
6 votes -
For removal of broken bolts
Please add bolt
1 vote -
Bill of Materials Report-Add Bin Location
The Bill of Material (BOM) report in the client should include the bin location of each part listed on the BOM. This way it's easier for a tech or SCS or Planner etc to physically look for these parts in the Crib.
7 votes -
SCS should not have the ability to perform a manual cost change for parts in the eFP Client
SCS should not have the ability to perform a manual cost change for parts in the eFP Client.
5 votes -
Operator PM's split from ATS PM's
In the drop down menu of the portal instead of "All open PM's", make 2 categories. One should be ATS PM's and one should be Customer PM's
1 vote -
Could you put machine location just under the Asset ID so we dont have to open ticket to find location
We work in a large plant with almost 2000 asset Locations, it would save time and money to add the equipment location to the status screen.
2 votes -
On the EFP3 Technician screen the Asset number and the Equipment ID number should both be available for use.
On the EFP3 Technician screen the Asset number and the Equipment ID number should both be available for use.
1 vote -
Notes on PM Step
Add note on PM task at step level so techs don't have to exit out and go to notes section
1 vote -
Planned Start Date on Shift Turnover
Shift Turnover Report - Adding the Criticality is planned - thank you. Can we get the Planned Start Date added as well please? Planned Start Date reflects both the creation date of non-pm tasks and the compliance start of PM tasks. I could effectively use a single date column for all of my reporting out of the STO report instead of dealing with two date columns and confusing people. Thank you.
2 votes -
Please consider a dropdown list, or equivalent, to work order review that identifies which organization is responsible for work.
Our site is being asked to track all physical downtime on assets, and then be able to report out who's scope of work the downtime falls under for CI efforts. Possible examples are "Lubrication Provider," "Facilities," and "Outside Contractor/Services."
7 votes -
Add Equipment creation date in the Equipment list report
We need that the Equipment list in the SS reports cointains the date of creation of each equipment. We are having this request from our customers.
13 votes -
My Team Open Task Dropdown
Can we add a my team task dropdown so technicians can pull up all open task assigned to their team without having to filter
1 vote -
way to label issues Mechanical or electrical
would make assigning work orders and for tech to find tickets that fit their skill set if there was a drop down that allowed for identification.
3 votes -
Filtering for equipment.
When we filter to select equipment we enter ( example) C-2 and all the equipment will come up and you have to scroll through and find what you are looking for. when you are scrolling the scroll will usually kick you out 3 or 4 times making this very time consuming and frustrating. We need a way for it to only bring up equipment for the line you are searching for.
2 votes