eFactoryPro 3.0
287 results found
-
Blank work orders from Equipment screen
Cannot pull up a work order from Equipment Screen. Labor, Notes, etc. are blank
1 vote -
Expanded PM Generation Abilities
Add in expanded generation rules for triggering PMs. The want is the ability to exclude certain days. Example- exclude weekends for daily PM Generation
5 votes -
Repair Notes Visibility
Create a report presenting repair notes per Task Number or add repair notes to the remarks or add repair notes to the shift turnover report.
7 votes -
Recent changes
Whatever recent changes were made, the system is now terrible. First with slow load speeds, then jacking up organization, now I cannot see a work order if accessed through Equipment page. It's noted load speed complaint was completed, it's not. This is barely functional now, overall. Appreciate all the hard work that is normally done in your thankless position(s) but ouch... can't work like this.
1 vote -
In Planning Portal - Job Plans tab, It is not allowing search by Equipment or sort the column.
Please allow Search filter for Equipment in this portal to work. We are asked for all PMs on certain equipment - this would allow them to be easily printed but current Equipment field doesn't work when filtered on main tab for Job Plans.
2 votes -
sign out
efactory doesn't automatically sign you out when you close the page. This causes people to use other tech's accounts when adding time and labor. Can you add an automatic sign out when the page is closed?
2 votes -
Job plan steps should have an option to attach images
Planner/Schedulers should be able to attach image files (PNG/JPG/GIF) to specific steps in a job plan. The technician should be able to see those images for each step and enlarge them in the steps screen.
The downside of using attachments for the files is that 1) the tech has to go back and forth between steps and attachments, and 2) it's harder to organize the images based on a specific step
10 votesPBI 99959
-
Add the PO Line to the Billable PO Report with Simple View = Y
Can we please add the PO line to the Billable PO report with Simple View = N? Without the PO Line, one cannot combine this report with other purchasing reports.
For some reason, the Simple View = Y has both the PO Number & PO Line6 votesPBI 101000
-
fix efactory to actually work between the hours of 4 am and 5 am est we have put in multiple tickets for this problem and nothing has fixed
fix efactory to actually work between the hours of 4 am and 5 am est we have put in multiple tickets for this problem and nothing has fixed this is horrible for metrices with not being able to access work orders between these hours this is an ongoing problem falling on nothing but deaf ears
10 votes -
status monitor screen show equipment in form of a map
have a map of the facility with each piece of equipment located and labeled where it is. That way anyone who walks into the building can locate any piece of equipment by looking at the status monitor. still have it change color for status.
6 votes -
EFP Dark Mode
I would really like a dark mode option for EFP. This would reduce eye strain. Currently using third party plugins to darken this group of tabs.
1 vote -
Filter for Task Sub-type in the Review window
Filter for Task Sub-type in the Review window
5 votes -
Add Status Reason of RESCHEDULE to Edit Task Summary
Oftentimes, a PM is compliance is lapsed, but if it is a monthly, the new one will not generate for the next period yet. It is better to RESCHEDULE it within the current or next period than to use any other option under Status.
2 votes -
Add new field on shift turnover report, seperate reduced time and downtime
Is there a way to separate DT & reduced time into different fields. I recently became aware our shift turnover report is reporting inaccurate data regarding true DT. Most of our people tracking DT will do so using a shift turnover report, I recently came across TaskID 6396664 for site 727, where they have a reduced ticket showing 543hrs of DT. As far as cost savings goes, this can defeat any savings potential we have for this project. We need to truly differentiate DT and Reduced time.
1 vote -
full circle
Lets connect parts arrival notifications to e-mail the originator and the scheduler so we can plan repairs.
6 votes -
Change color of Reduced Status
Change color of operating status - Reduced - to further differentiate between Red Down. Reduced looks orange/too similar.
2 votes -
log value added interaction
I feel that there should be a quick link button to allow technicians to post time when the technician provides task specific training or instruction to customer representatives such as operators. This would allow us to record additional unscheduled time in without having to create an additional downtime work order, but also provides feedback on customer value added support.
1 vote -
Boton Desmarcar todo
En las tareas, agregar un boton que en vez de marcar todo, sea para borrar todo
1 vote -
Resumen de horas laboradas por dia
Que en la seccion de horas laboradas, se muestre una opcion de descargar el resumen de horas laboradas, pero resumida por dias. De esta forma, los tecnicos podriamos saber de una forma mas facil cuanto tiempo hemos capturado en cada dia y hacer la suma mas rapido. En vez de tener que sumar el tiempo de cada tarea de forma individual.
1 vote -
Display HTML tags properly in all screens
Some places HTML tags work (like in the pre-defined steps tab) but in other places HTML shows as plain text like in the actual Job plan steps. HTML tags should always display properly in all tabs, windows, and print outs.
1 vote
- Don't see your idea?