Consume multiple part simultaneously
Consume multiple parts at the same time.
2 votes -
GNS PO Receipts need to batch at 11:58 PM instead of Midnight
GNS PO Receipts need to batch at 11:58 PM instead of Midnight for reporting purposes at sites that need to provide reports to our customers for amount spent in a specific time frame. The current method makes it difficult to accurately report when GNS PO receipts are made the last day of the month but reports show transaction at midnight on the first of the month.
10 votes -
Provide ability to return parts to suppliers on PO they were bought on
Please provide the ability to return parts to suppliers on the same PO they were bought on even if ATS has already paid the supplier's invoice. We should be able to enter an RMA # from supplier and properly process any restocking fees by passing those fees on to our customer or choosing to absorb those fees internally if the return is not the fault of our customer. This process should also show as a credit to our customers on the monthly Billable PO report used for invoicing our customers.
23 votes -
Manditory creator of task name on task
Make it a requirement for creator of task/work order to put there name so we can know who to ask questions and get needed information to perform the task.
4 votes -
Client: Purchase Order Details
knowing who put the part need request into the system lets us know who to go to for clarification. we need to be able to go to one person and ask what they mean/ or what they want.
the general request does not always cover what needs to be done. this is very important and can take a LOT OF TIME getting the proper information.
1 vote -
Tech Portal - Download/Print control center's status monitors
Require ability to download and/or print status monitors in Control Center.
2 votes -
Tech Portal: Add option to sort status monitors in Control Center
Add option to sort/filter the active/inactive existing status monitors in the Control Center.
2 votes -
Tech Portal: Add Reason For Variance to the PM Compliance Panel
In the v4 portal, can we add the reason for variance to the PM Compliance information at the bottom of the screen where it shows 'compliance start and finish and date' completed?
This was requested by Mark Howard at Site 491 and Michael Spigner site 202
9 votes -
Tech Portal: Add date completed line to work order history
When you look at a piece of equipment's work order history , please add a date completed line.
If there is an AUDIT you can print the machine history to show past PM's completed as well as work orders completed
9 votes -
Tech Portal: Equipment Screen - Attachments
In the portal under the Technician/Equipment screen, there are 2 buttons (Summary and Work Orders), can we get another tab for attachments.
We have various calibration and service history documents that would be easier to locate by asset instead of having to search for the specific task that has the calibration document attached
14 votes -
Tech Portal: Multi-Filters in Portal Search
Can you please add the option to select more than one filtered option when using the search function on the portal.
i.e. i would like to display tasks or work orders for several different sub-locations
10 votes -
Reporting: Tech Utilization /overlapped time stamps in PowerBI
In one of the latest updates, i noticed the BI background data has a new sheet for overlapping malfunctions.
Can we get the same type of function for overlapping timestamps?
Or more ideally, can we eliminate the ability for technicians to overlap their time stamps?PowerBI sometimes reflects over 100% utilization for technicians due to overlapped time stamps
3 votes -
Tech Portal: Order Details of Part Information
As a tech, when ordering parts it would be nice to see details of what we ordered.
I cannot find a way to pull up my comments/notes on a part order i made 2 months ago.
Now that i received the part, i need to reference that information.Supply Chain order data
Material/Parts order information
Historical
Receiving2 votes -
Control Center: Add Escalation condition for nuisance failures / high part spend
I would like to have an alert like an escalation for when a piece of equipment has X amount of failures in Y amount of time
Or when the cost of repair is above a set amount.
3 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
This request is currently being discussed with FMS Leadership for possible inclusion in the eFP 3.0 development queue.
-
Tech Portal: Ability to Edit 'Part Need' Location (ATS/CUSTOMER)
Could we make it where you can edit the (Location From) when you click on the Actions / Edit Part Need in EFP 3.0 portal.
Tech Portal
Part need
Edit the location for ATS or Customer stock location5 votes -
ESM: Event Monitor Breakdown Filter
Add the functionality to the event monitor to filter out breakdowns for facility type equipment.
ESM - Equipment System Monitor
Planner/Supervisor
Add Filter by Equipment Group: Machine Type / Facility Type / Tool & Die / Sub-location16 votes -
Tech Portal: Add Predictive Support and Personnel tracking
The tracking of Predictive equipment cases and personnel is a very manual process right now that involves spreadsheets, SharePoint and Outlook.
We also don't have a process in place to effectively track the process from problems documented, to work orders created, repairs effected and cost savings/avoidance tied back to the original issue or root cause.
This will reduce man-hours needed for the current process and improve the tracking of program effectiveness and BI metrics.
7 votesThank you for the suggestion. We will discuss this with the product owner for possible inclusion in the development backlog.