eFactoryPro 3.0
28 results found
-
Need to see work order sub status in the Supervisor grid
As a supervisor, it would be helpful to see the Work Order sub-status (Cancel/duplicate) in the grid from the Review work order panel. This would allow you to see, at a glance, which PMs were just canceled vs. canceled/duplicate.
4 votes -
Parent-Child Asset Relation Functionality
Need to have a parent-child relationship function added to the system. This is necessary for metrics, as if a child asset goes down, that is where the WO is put to. The parent asset is affected as a whole, though, so downtime needs to be considered there as well.
21 votes -
RCA Trigger App on Power BI
All sites should have an RCA trigger Document filled out by this point. Being able to create a report or app on power bi to quickly see if any RCA's have been triggered in the current month is a great time saving tool. Can we have a template created that sites can then use that addresses safety, Failure count, Downtime, Cost, etc. in accordance with the RCA Trigger Template from the Standards and Assessments page?
a mock up has been created at this link:
https://app.powerbi.com/groups/me/reports/40e32eec-836a-4f7c-baa9-32f0dc704dc4?ctid=786b8a42-d6d2-45f9-ac36-b35652395f2a5 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
Thank you for your feedback! Our Power BI analyst team is looking at your suggestion and determining how we could implement this.
-
Down & Reduced in Tasks
Down and Reduced drop down. Can we have only open tasks show, instead of all. I have to go in and uncheck completed, reviewed, etc.
11 votes -
Create a report in Power BI for Mexico´s Labor
The idea is to create a report in Power BI where the sites can review the Technician´s Labor. This idea was created via e-mail last 4/4/2018. Michael Vincent created the reported and he added it into the Application section in Power BI but unfortunately the report is not working as we expected. We saw some opportunities, for example, when you select the report by month for an specific site, we can not see all the technician´s labor. Please contact to me if you have any question or doubt.
5 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
This suggestion has been shared with our Power BI Data Analyst to see what he is able to update on the existing report.
-
Need a way to see work order waiting on parts to be consumed.
Is there a way to add a filter/report to make it easier to see these? I am at a new location and all of our parts are not loaded yet so we have to add the new part and then purchasing has to set up new 100 number and then add stock and then the WO can be closed after consuming material. As it is I have to go through each work order individually looking for these issues. Would be less time consuming if I could run a report or export and filter for these issues first thing of each…
2 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
Thank you for your feedback! We will take your suggestion to the business for possible inclusion in our development queue.
-
Tech Portal: Add Predictive Support and Personnel tracking
The tracking of Predictive equipment cases and personnel is a very manual process right now that involves spreadsheets, SharePoint and Outlook.
We also don't have a process in place to effectively track the process from problems documented, to work orders created, repairs effected and cost savings/avoidance tied back to the original issue or root cause.
This will reduce man-hours needed for the current process and improve the tracking of program effectiveness and BI metrics.
7 votesThank you for the suggestion. We will discuss this with the product owner for possible inclusion in the development backlog.
-
Control Center: Add Escalation condition for nuisance failures / high part spend
I would like to have an alert like an escalation for when a piece of equipment has X amount of failures in Y amount of time
Or when the cost of repair is above a set amount.
3 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
This request is currently being discussed with FMS Leadership for possible inclusion in the eFP 3.0 development queue.
- Don't see your idea?