Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

23 results found

  1. Need a way to see work order waiting on parts to be consumed.

    Is there a way to add a filter/report to make it easier to see these? I am at a new location and all of our parts are not loaded yet so we have to add the new part and then purchasing has to set up new 100 number and then add stock and then the WO can be closed after consuming material. As it is I have to go through each work order individually looking for these issues. Would be less time consuming if I could run a report or export and filter for these issues first thing of each…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Tech Portal: Add Predictive Support and Personnel tracking

    The tracking of Predictive equipment cases and personnel is a very manual process right now that involves spreadsheets, SharePoint and Outlook.

    We also don't have a process in place to effectively track the process from problems documented, to work orders created, repairs effected and cost savings/avoidance tied back to the original issue or root cause.

    This will reduce man-hours needed for the current process and improve the tracking of program effectiveness and BI metrics.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Control Center: Add Escalation condition for nuisance failures / high part spend

    I would like to have an alert like an escalation for when a piece of equipment has X amount of failures in Y amount of time

    Or when the cost of repair is above a set amount.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
2 Next →
  • Don't see your idea?

Feedback and Knowledge Base