eFactoryPro 3.0
264 results found
-
Work module part search is not looking for manufacturer part number which is what we typically use.
When we search for a part using the manufacturer number it comes back with no results. Also if we use a dash it will come back with all the site parts.
5 votes -
Part Notes/Description section
It would be great if parts has a better notes/description text section so that additional info buyers need to get the actual specifics correct could be entered or misc info that is helpful to everyone
4 votes -
Feedback status notification to the initiator
Feedback status notification to the initiator. Currently when an employee or customer provides feedback to the planner; no status results are sent to the initiator. So they have no clue if their feedback was rejected or approved. Especially rejected, should come with an explanation or comment.
1 vote -
Create a condition in Event Monitor for 'Task Status'
We can currently create a condition to notify when a WO status changes, but not a task status change. This could notify that a new part need was created (status on the task changes from 'new' to 'hold/waiting on materials'). This could alert the SCS or crib attendant to begin kitting for that WO, so the parts are already ready when the tech comes to get the parts.
1 vote -
Authority to cancel parts used/consumed.
Option to cancel parts consumed/ used. Operators have entered in wrong part number or quantity and consumed it by mistake.
3 votes -
Dedicated Crib PC/Login
Is it possible to create a log in that can be used on a dedicated PC located in the Crib/Store that can display the Crib Portal? This will only be used to identify the location of stock.
1 vote -
Period Capacity Export Planned Hours Format
Reformat the Period Capacity export planned duration hours column to be in a Decimal Point Number format instead of the current format of 0 HRS 38 MIN. The current format has to be converted every time someone exports it to Excel then they have to manually do the conversions.
2 votes -
MERGE W/O TOGETHER
I WORKED AT A PLACE WHERE IF YOU HAD DUPLICATE W/O "S FOR THE SAME ISSUE. WE THEN COULD MERGE BOTH W/O'S TOGETHER. IT WAS A MERGE BUTTON ON THE SCREEN THAT WE COULD HIT AFTER SELECTING 2 W/O'S WITH A CHECK MARK NEXT TO THEM. THEN IT ASKED US WHICH WORK ORDER TO KEEP AND WHICH ONE TO MERGE TO THE KEPT ONE. MADE THINGS EASIER. ATLEAST GIVE THIS TO THE PLANNER/SCHEDULER
THANKS6 votes -
Assignations
Assignations always displayed on "My Work", not for date and add filter by date.
12 votes -
Determine type of job by work order on the review tab
If we can add type of job performed by work order as for example: Electric, Mechanic, Hydraulic, Pneumatic, Electronic, Lubrication, Coolant. We can determine Downtime & MTTR due to each of these, by plant, area, or technician. With this we can understand development needs by plant, area or technician, so we can set the trainings needed for our people and also track its effectiveness on each specific case
12 votesGreat suggestion! There is projects currently in place to tackle this exact issue. We are redefining the skills and skillsets for technicians, equipment, and for job requirements. These 3 will work together to specify development requirements for technicians and provide us with skillset requirements based on equipment requirements.
-
Have a way to schedule workorders back to individual as you reopen it, and be able to flag it so the technician Knows
Have a way to schedule workorders back to the individual as you reopen it, and be able to flag it so the technician can Easly identify it needs reworked
7 votes -
Parts search and adding
Adding parts to a work order is to complicated. It is taking technicians double the time to find the part in the system and then add it to the work order. I like what was added as far as the advanced filtering capabilities goes but that should be a separate option. Having the search default to the BOM of the equipment is not helpful since not every item you work on has an asset id. We need a basic search capability like we had before with my site stock and that would satisfy 90% of all technician parts needs.
13 votes -
Quality Assurance Request: Send Notifications when Regulatory PM task date is modified
This is a new position in Mexico and as part of my role, I need to receive a notification when a regulatory PM task date is modified. I already contact the support IT team and this option is not currently available. Please, can you assist?
10 votes -
Period capacity canceling task selection
Allow canceling tasks within the scheduling portal period capacity screen. Being able to select / check multiple tasks would drastically reduce time and bandwidth requirements.
3 votes -
dark mode
add a dark mode
12 votes -
New Repair Codes
New Repair codes for cFactory Pro
Laser
Anode
Circuit Board7 votes -
Refresh button in work module
Within the work module of eFP, for the work order and task grid, can we get a refresh button, which would allow us to refresh the data. This helps with newer work orders which have been entered into the system.
6 votes -
Field Addition to Filter within Re work order review
Add the Field "Break Down" to the filter within the Work : Review screen.
1 vote -
Quantity Adjustment
Supply chain specialists and technicians need to be able to adjust the quantity of parts ordered both up and down. Not allowing people to adjust upwards is not efficient and makes no sense at the site level.
6 votes -
Customer view Parts in system
Allow customers to see parts associated with each asset and locations within store rooms to better utilize system and ATS personnel as we wouldn't need to ask them to locate parts for us.
2 votes
- Don't see your idea?