Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

270 results found

  1. add est labor to technician task report(s)

    add minutes to technician task readout

    add equipment category to technician readout

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Planned Start Date on Shift Turnover

    Shift Turnover Report - Adding the Criticality is planned - thank you. Can we get the Planned Start Date added as well please? Planned Start Date reflects both the creation date of non-pm tasks and the compliance start of PM tasks. I could effectively use a single date column for all of my reporting out of the STO report instead of dealing with two date columns and confusing people. Thank you.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. add time required to do PM - to go to excell

    On PORTAL/TECHNICIAN/PLANNED START/ Why or can the time required to do the pm be a category that would transfer to the excel spreadsheet?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. FM type tasks having a sub-type=PM or PD

    FM type tasks, should they have a sub-statuses describing if they were created from a PM or PD type task?

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Filtering for equipment.

    When we filter to select equipment we enter ( example) C-2 and all the equipment will come up and you have to scroll through and find what you are looking for. when you are scrolling the scroll will usually kick you out 3 or 4 times making this very time consuming and frustrating. We need a way for it to only bring up equipment for the line you are searching for.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Need a way to see work order waiting on parts to be consumed.

    Is there a way to add a filter/report to make it easier to see these? I am at a new location and all of our parts are not loaded yet so we have to add the new part and then purchasing has to set up new 100 number and then add stock and then the WO can be closed after consuming material. As it is I have to go through each work order individually looking for these issues. Would be less time consuming if I could run a report or export and filter for these issues first thing of each…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. ESM: Event Monitor Breakdown Filter

    Add the functionality to the event monitor to filter out breakdowns for facility type equipment.

    ESM - Equipment System Monitor
    Planner/Supervisor
    Add Filter by Equipment Group: Machine Type / Facility Type / Tool & Die / Sub-location

    16 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    5 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. GNS PO Receipts need to batch at 11:58 PM instead of Midnight

    GNS PO Receipts need to batch at 11:58 PM instead of Midnight for reporting purposes at sites that need to provide reports to our customers for amount spent in a specific time frame. The current method makes it difficult to accurately report when GNS PO receipts are made the last day of the month but reports show transaction at midnight on the first of the month.

    10 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Need ability to run Escalations Report for specific site instead of wide open for all sites

    Need ability to run Escalations Report i Client and SSRS web page for specific site instead of wide open for all sites - currently there is not an option avl. to select one site

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Tech Portal: Add Reason For Variance to the PM Compliance Panel

    In the v4 portal, can we add the reason for variance to the PM Compliance information at the bottom of the screen where it shows 'compliance start and finish and date' completed?

    This was requested by Mark Howard at Site 491 and Michael Spigner site 202

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Enable Add Assembly

    Give sites the ability to "Add Assemblies" for parts in inventory. It would be very helpful to add an assembly list of parts that are used to create another part (e.g. a pump could have bearings, gaskets, and an impeller as assembly parts)

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Tech Portal: Multi-Filters in Portal Search

    Can you please add the option to select more than one filtered option when using the search function on the portal.

    i.e. i would like to display tasks or work orders for several different sub-locations

    10 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Automatic Refresh

    Can it be made where recent customer requests automatically refreshes every few minutes.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Tech Portal: Add date completed line to work order history

    When you look at a piece of equipment's work order history , please add a date completed line.

    If there is an AUDIT you can print the machine history to show past PM's completed as well as work orders completed

    9 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Sort names by alphabet in field to assign people

    Sort names by alphabet in field to assign

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Add "Asset ID" column to PM List report in ATS_FMS_Reports

    Add "Asset ID" column to PM List report in ATSFMSReports.
    It would be more efficient to have the Asset ID showing on the PM List report.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Consume multiple part simultaneously

    Consume multiple parts at the same time.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Reporting: Tech Utilization /overlapped time stamps in PowerBI

    In one of the latest updates, i noticed the BI background data has a new sheet for overlapping malfunctions.
    Can we get the same type of function for overlapping timestamps?
    Or more ideally, can we eliminate the ability for technicians to overlap their time stamps?

    PowerBI sometimes reflects over 100% utilization for technicians due to overlapped time stamps

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Tech Portal: Ability to Edit 'Part Need' Location (ATS/CUSTOMER)

    Could we make it where you can edit the (Location From) when you click on the Actions / Edit Part Need in EFP 3.0 portal.

    Tech Portal
    Part need
    Edit the location for ATS or Customer stock location

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Tech Portal - Download/Print control center's status monitors

    Require ability to download and/or print status monitors in Control Center.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Feedback and Knowledge Base