eFactoryPro 3.0
305 results found
-
Technician Repair Notes Visibility
There is not a great way to see historical repair notes on equipment. In the equipment Module there should be a column on the task history that contains the tech repair notes on assets so this information can be quickly referenced and exported for understanding repair history and used for reliability analysis.
16 votes -
Proposal: Add the Repair Code field to the Shift Turnover Report. Justification: Including the Repair Code in the shift turnover report wil
Proposal:
Add the Repair Code field to the Shift Turnover Report.Justification:
Including the Repair Code in the shift turnover report will provide direct and timely access to essential operational data. Currently, BI reports are experiencing issues due to the recent V3 update, causing delays in data availability. By adding this field to the turnover report, we can ensure an immediate and reliable source of first-hand information, improving decision-making and reducing dependency on BI reports.28 votes -
Add gearbox to the Object field under Add Repair Code
A big chunk of work goes under "see comments" when working motor/gearbox issues because no gearbox option exists and gear is too generic. This will aid in separating out work during analysis.
12 votes -
Dark mode option
Dark mode to prevent headaches and eye strain during long time use
9 votes -
Scheduled/Unscheduled Downtime in Malfunction Screen
Today in the Malfunction Screen there is logic built in that determines if a Malfunction is considered a Breakdown which dictates if the Downtime/Reduced time is "Scheduled" or "Unscheduled". This logic does not accurately show this and causes excess rework to modify tasks to place the data into the right category. This causes inaccuracy in downtime calculations and Eaton CONC calculations which we are held accountable to with our customers. We should remove the logic with these breakdowns and create a toggle for the user to define if the Downtime is Scheduled or Unscheduled with Unscheduled being the default category.
8 votes -
Priority 1 and 2 tickets
Priority 1 and 2 tickets only populate in the daily capacity for the week they are created. They no longer transfer to following schedule weeks within the daily capacity unless manually scheduled. Please change this back to where they maintain being in the daily capacity until completed. Instances where priority 1 or 2 tickets continue on to following scheduled weeks are typically due to parts orders, needing OEM support, or if a priority 1 safety ticket populates on a Wednesday evening (the end of our scheduling week), and is not resolved before Thursday morning (the beginning of the following schedule…
7 votes -
Customer adding attachments to WOs when they make them
I know this has been suggested before and the concern was bad actors would add malicious files. I'm wondering if it would be possible to let the customers add attachments in the screen where they enter new WOs and not just at any point in the process. I know it would be very beneficial to our site for customers to be able to enter pictures of problems.
9 votes -
Required Data Entry / Meter-Gauge Readings
There isn't an existing method to enter and record critical data that is needed to be collected, monitored, and trended. Requesting a form to allow critical data readings to be entered, recorded, and imported into Excel and/or PowerBI for historical trending.
39 votes -
Food Safety Codes
We dont have a good way to track food safety related work order data. Suggestion is to Add "Food Safety" as a subtype, Treated like "Safety." Makes priority of Task 1. Shows up on Status Monitor as top priority for Symbol. Can be filtered in Task Grid and in Scheduling screens (Daily Capacity). A "Food Safety" symbol appears in Daily Capacity so it can be easily Identified. In a separate column on the Task Grid than the Safety Column. When Exported from Task Grid to an Excel file must say "Food Safety" in the column not "Yes", Add "CIP" as…
2 votes -
Failure Code Update
Currently there are no failure codes related to Washdowns or electrical shorts due to items getting wet. Can we add failure codes to capture this.
2 votes -
Runtime/Downtime Designation
Currently there is no designation to identify if a planned job requires a machine to be operating or down in order to perform. This should be an available designation when planning because it will allow for better visibility of what is required of a job and make scheduling with a customer 100X easier. It will allow us to explicitly tell a customer how much downtime we need on a machine to perform a job.
2 votes -
Add the ability to create alert conditions for individual assets in the Event Monitor
Currently, alerts can only be set up based on the list found below. Our customer is requesting alerts on specific assets. Can Asset ID be included in this list?
Work Order Priority
Equipment Criticality
Operating Status
Work Order Status
Task Type
Sublocation
Task Type5 votes -
Export the Job Plan list from the EFP portal.
Export the Job Plan list from the EFP portal.
24 votes -
slide bar window on scheduling assign sheet for task steps to be seen
add a slide bar to be able to see the steps involved in a pm while scheduling to daily cap.
4 votesThe team has decided to table this idea for the moment. We appreciate your input and may revisit it in the future.
-
Improve "Feedback" function in Planning/job plans.
When sorting by "Feedback" in Planning/job plans, need to be able to tell if we have already addressed that issue. Today, when we sort by Feedback, it lists every job plan with feedback that was ever created. In order to see what has been addressed and what is new, the Planner has to re-review EVERY feedback note. Very impractical.
9 votes -
Work Order Entry Screen Malfunction Update
Today, when the customer enters a work order on the customer screen, they can very easily miss or bypass specifying a malfunction because the field defaults to None. In order to have more data accuracy, and require less rework after the work orders are entered, the malfunction status should be an empty required field that forces you to make a selection.
1 vote -
Daily Capacity Report
I like how we can export the Daily Capacity Report to Excell, but it does not have information needed to do anything with it other than how many minutes the job takes and who's assigned. Could we get the criticality and Status information to go along with the export.
3 votes -
Making search easier
Add search operators to part search feature.
4 votes -
bring back tab
please bring back the Downed and reduced tabs as well as recent tasked
2 votes -
conteo de horas
Mejorar que al finalizar el mes y comenzar el otro mes ,que no se borre el registro de mano de obra de ordenes ya cerradas ,para poder ver cuantas horas se lleva en la semana
1 vote
- Don't see your idea?


