eFactoryPro 3.0
311 results found
-
1 vote
-
Text notifications when all parts are allocated to WOs that require kitting
When the SCS receives all parts to a WO, the tech that requested the parts would get an automated text notification that their parts have arrived.
3 votes -
FM task completion notifications
I want to be automatically notified when certain FM tasks that I did not create are completed.
1 vote -
additional fields in shift reports
The labor comments and the notes sections need to have their own separate fields when displaying in the shift turnover report.
1 vote -
Add Building Location field to the FMS Report> Task Planning
Add Building Location field to the FMS Report> Task Planning. This would cut our time in half pulling excel sheets for scheduling. We use this field to show the main line asset of sub assets.
1 vote -
Agilizar el filtrado de ordenes a revisar (Supevisores)
Visibilidad en pantalla principal de revisión de ordenes de que técnico cerró la tarea.
Nos agilizará a los supervisores el filtrado de las ordenes que requerimos revisar.
4 votes -
Inventory adjustment
There needs be be a parts adjustment on a bearing 205pp I used two but inventory showed only one
1 vote -
Allow Task Filter by "Kitted & Staged" in eFP
I would like to run a list of task by "kitted and staged" status. I do not see the option.
2 votes -
Be able to see when tracking was added in events
It would be awesome to see when tracking was added to a PO/req in the client. Many times I would have to ask someone for information on a PO because there is no tracking. Then it magically appears and it makes it look like I am going crazy. This way everyone is held accountable for their responsibility in the process of getting new parts.
1 vote -
Status monitor with UP CM tickets.
Need a way to monitor up tickets that are CM tickets on the status monitor. All to often we customer puts in tickets as down or reduced so they can keep track of them and they do not affect production of a machine. This is not down and should not affect machine availability. However, do not want to show all up tickets on the status monitor as it will show all PMs as up tickets. Somehow we need a way to display CM tickets that are up so they do not get forgotten about.
1 vote -
Photos for parts
I think it would be a huge asset if we could add photos of parts to the database that appear where the "robot arm" is located in the parts screen. Would be good to be allowed multiple photos with arrows to cycle through them. I realize this could open an avenue for error but if a process for validation is created the benefits would be great I think.
14 votes -
reactive to proactive
could there be a quicker way to change a job to proactive if the customer has put it in as reactive rather that having to open a new ticket
2 votes -
Task tile sort
Make the task tiles sortable. either by dragging and dropping in any order or sorting by status
2 votes -
DT required button added to job plan
Add a field in the Job plan template to indicate if this task requires DT
14 votesUnder review with IT team.
-
Replace the planned start date with the first date of the period capacity or Scheduling Period dates on the all open tasks screen.
Replace the planned start date with the first date of the period capacity or Scheduling Period dates on the all open tasks screen.
3 votes -
Staged parts removed from available count.
Staged parts should be removed from inventory availability count. This will trigger the system to initiate a restock based on demand. Also, this will allow for inventory to be staged in reusable job plans that regenerate.
2 votes -
Can We get Asset field listed on Review portal?
When Reviewing Work Orders it would be much faster if the Asset was listed so you don't have to open the record if there's any question upon review.
1 vote -
Edit dates on Containers
Have the ability to shifts dates on containers. The plant we run at has constantly changing run periods and downtime periods. This would allow us to create containers for the run time and downtime separately and shift dates as needed. Save on doing double work from production schedule changes last minute.
2 votes -
default to proactive
on MOTH task make the default to "proactive"
3 votes -
Proactive default
On MOTH task make the default to "proactive."
3 votes