Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

270 results found

  1. Remove Delete buttons for SCS on Run Log

    SCS delete Run IDs from the Run Log thinking it will delete the actual Stock Count Run but it only deletes the historical data reported on the Run Log. The DELETE buttons should be removed from the Client on the Run Log.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. SCS need ability to add parts to BoM

    Currently only SM & PS have access to manually add Part IDs to BoM. The SCS also needs this ability.

    24 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    8 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Stock Count should not allow new Stock to be created by user if a previous Stock Count is still open.

    We could avoid Stock Count Exceptions if eFP did not allow users to create a new Stock Count Run if a previous Stock Count Run ID is still open.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Stock Count creation should require Place ID be entered.

    The Stock Counts should require Place ID to be entered in filed provided. eFP currently shows Place ID field is Required field but the system does not actually require it. Sites often mistakenly run Stock Counts wide-open for All materials sites.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Error al correr reporte con el portan el Español

    Cuando cambias el lenguaje a Español, al querer generar los reportes aparece el error: "falta un valor en el parametro lenguaje" y no te deja correr ningún reporte. cambie el idioma nuevamente a Ingles y ya me dejo correr el reporte.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Down time and escalation time have different counters

    We have a problem with the programation of the system. For example our client has a production schedule from 6:30am to 12:00 am, if our client enter a WO for a reactive work at 11:30 pm, the down time starts from 11:30 pm it is interruptted at 12:00am and then starts counting again at 6:30am, we dont have problem with that. The problem is the scalation system: If our client enter a WO for a reactive work at 11:30pm the time for scalation starts counting and it doesnt stop at 12:00am, it continuing counting. This situation provoques scalations for high…

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. SCS should not have the ability to perform a manual cost change for parts in the eFP Client

    SCS should not have the ability to perform a manual cost change for parts in the eFP Client.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Part Status Icon located on work order's reserved parts listing.

    Place a button along with "View Part Bin Info, Consume Part Need, Edit Part Need, and Cancel part need" that would query the parts need table and return if the req was released, due date, and tracking number for shipment.

    21 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Add to shift turn over report if a task was marked as PROACTIVE

    Hi, there´s no reports in SSRS that shows if a task was marked as PROACTIVE. This information will help a lot to the Planners & Schedulers if they want to see quickly which task are PROACTIVE, not just the Pm´s, PD´s and FM´s. I request add this information in the Shift Turn Over report and in Labor report.

    14 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Options on Timezones/timestamps.

    Provide option to change timezone in SSRS reporting system for shift turnover report.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Reporting and BI  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Review work order by technician

    I would like to review work orders by Technician

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. YTD Part Receipt Drill Down

    I would like to be able to drill down in the YTD Part Receipt under the 4 blocker in the supply chain metrics. i.e. Select HVAC>drill down and have it populate a list of everything purchased under that HVAC piece.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. SISTEMA PERMITE BORRAR O MODIFICAR UNA TAREA YA COMPLETADA

    Al momento de completar una tarea, cualquier persona que no haya participado en la tarea puede modificar y/o borrar horas de mano de obra, notas etc, favor de colocar candados ya que se puede perder informacion valiosa

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Estimacion de tiempos desde Portal

    Poder agregar el tiempo estimado de una actividad desde el EfactoryPro 2.0 ya que hacerlo desde el Cliente demora demasiado tiempo, cuando seria mas eficiente desde el portal.
    En cuanto a los Mantenimiento Preventivos que el sistema pueda estimar el tiempo de ejecución calculando las ultimas 3 ejecuciones y la cantidad de personas.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. RCA Trigger App on Power BI

    All sites should have an RCA trigger Document filled out by this point. Being able to create a report or app on power bi to quickly see if any RCA's have been triggered in the current month is a great time saving tool. Can we have a template created that sites can then use that addresses safety, Failure count, Downtime, Cost, etc. in accordance with the RCA Trigger Template from the Standards and Assessments page?

    a mock up has been created at this link:
    https://app.powerbi.com/groups/me/reports/40e32eec-836a-4f7c-baa9-32f0dc704dc4?ctid=786b8a42-d6d2-45f9-ac36-b35652395f2a

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Repair code - object

    Repair codes - object
    Can “eyelet” be added to the drop down list?

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Inventory Stat Report should have the Customer Account included in the unsimple report

    Inventory Stat Report should have the Customer Account included in the unsimple report

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Add Planned and Actual Labor Columns to the Task Grid in the Portal

    Please add Total Planned Labor minutes and Actual Labor to the basic technician report.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. move the + up 1/2"

    not a fan of the red plus sign in the middle of no where. it has no sensible reason to be by itself halfway in between the header and main body of the page.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Down & Reduced in Tasks

    Down and Reduced drop down. Can we have only open tasks show, instead of all. I have to go in and uncheck completed, reviewed, etc.

    11 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  5 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Feedback and Knowledge Base