eFactoryPro 3.0
311 results found
-
COLOCAR FOTOGRAFIA PARA LAS MAQUINAS EN EL PORTAL
Una idea que podría llegar a ser muy útil para nuevos usuarios o cuando se cambia alguien de planta. Es que se le pueda colocar una FOTOGRAFIA de la maquina en del equipo en esta plataforma y de esa manera seria muchísimo más fácil de encontrarlas cuando te asignan una tarea en ella.
1 vote -
Table sorts/add asset ID
On the daily capacity screen we have the A to Z table sort. I was wondering if we could have the asset ID added to the sort option. This woud allow us to see all tickets for that asset and keep them together when putting into the techs buckets. The asset Id under the other table filter only lets you see one asset at a time.
1 vote -
Letters/words still too light
Please make the words on the screen darker and easier to see. For sites using older screens, the text is still too light to see clearly causing eye strain.
1 vote -
PM -> AM button changes labor time field.
When adding labor to a task after 12PM, if you select the start time and enter the hour then minute then click the PM -> AM button, it appears to work but will enter a different time when you press 'Set'. The PM -> AM button must be pressed first to work correctly. Would be nice if it worked in any order.
2 votes -
Limit technician active sites
Allow the technician to remain active on one site at a time. If the technician migrates from the site, automatically mark his team status at the previous site as inactive.
10 votes -
Multiple Bins
If the part is in multiple bins allow the option to select which bin you want to pull the part from. Right now it defaults based on BIN name alphabetically. This can cause confusion and inventory discrepancies.
4 votes -
Mass processing of reviewed completed tasks.
Mass check off of reviewed task when completed. Supervisor and review completed task and check a box. Once all tasks have been reviewed, the supervisor can click on the mass close out for all the reviewed completed task to process. instead of doing having the system process each one individually. This would save a lot of time waiting.
1 vote -
We need visibility for every time a workorder is modified not just the last time it was.
We need visibility for every time a workorder is modified not just the last time it was. This way even after it was completed, we would still be able to tell how many times it got moved and who moved it.
2 votes -
Equipment in Work module needs an additional field to identify "At Risk" equipment.
Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.
5 votes -
Follow Up Task - Asset ID
Remove the need to add an Asset ID when creating a Follow Up Task
1 vote -
Labor Hour Tab Quits Working After 15 days
The labor tab every month only displays out to the 15th. Then I have to select the 16th thru the rest of the month or each day. I use this feature to keep track of my tech utilization hours. Thank you, Michael
1 vote -
Task Planned Proccess Easier and Quicker
Would be helpful to have a quick access to the planner portal into the task to plan the task you are working on it, then once planned back to the task, and dont have to copy the task number, load the planner portal and search the task you want to plan. This would be easier and quiker our work.
27 votes -
Subscribing to updates of specific work orders
It would be nice to be able to stay subscribed to a work order's updates in regard to parts orders even after it has changed ownership from technician to planner and so on. This would allow technicians to be informed once parts were kitted in the crib that we have been waiting on.
1 vote -
Change MRCT WO/Task Type to PR
supervisor having ability to change an MRCT WO/Task to a project. A lot of times the requestor selects the wrong type of work order and it take time to cancel and create new WOs when tis happens after the fact
5 votes -
test-tru
test
2 votes -
Job Remarks Section
The original EfP had a job remarks section that would allow you to view all remarks under an asset without needing to open each individual work order. That feature was widely used and very helpful in looking for previous issue, repairs, and machine health trends. This would be useful in the current iteration as well.
1 vote -
Parts requsition vs consumption quantity
Parts (especially liquids) which are allocated/used in quantities different than their containers hold are troublesome. It would be efficient to be able to receive quantities separate from how allocated and used. so 5 gallon pails(or any volume) could be requisitioned and the allocation and use could be done in a different qty/volume count.
5 votes -
Mandatory Place ID entry when creating Stock Count for Cycle counts
Make this a mandatory input field so stock counts/cycle counts are not ran wide open for the whole company/all sites.
3 votes -
Print label automatically during receiving process
A label should generate to print like a RCV document does to print the part label during the receiving process. Navigating to a report and manually generating is a long process that is not efficient.
3 votes -
Reopening Tasks
When reopening Task for rework they are not easily found in the period capacity due to status of "rework" and go to daily capacity from when they were supposed to get done. When this falls in previous week it is cumbersome to search, move to period capacity and reschedule. Might make sense to have some options of what to do with it, as in to reassign or send to period capacity
4 votes
- Don't see your idea?