Period Capacity Export Planned Hours Format
Reformat the Period Capacity export planned duration hours column to be in a Decimal Point Number format instead of the current format of 0 HRS 38 MIN. The current format has to be converted every time someone exports it to Excel then they have to manually do the conversions.
2 votes -
Equipment in Work module needs an additional field to identify "At Risk" equipment.
Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.
5 votes -
Field Addition to Filter within Re work order review
Add the Field "Break Down" to the filter within the Work : Review screen.
1 vote -
Authority to cancel parts used/consumed.
Option to cancel parts consumed/ used. Operators have entered in wrong part number or quantity and consumed it by mistake.
3 votes -
Parts requsition vs consumption quantity
Parts (especially liquids) which are allocated/used in quantities different than their containers hold are troublesome. It would be efficient to be able to receive quantities separate from how allocated and used. so 5 gallon pails(or any volume) could be requisitioned and the allocation and use could be done in a different qty/volume count.
5 votes -
Part Notes/Description section
It would be great if parts has a better notes/description text section so that additional info buyers need to get the actual specifics correct could be entered or misc info that is helpful to everyone
4 votes -
Limit technician active sites
Allow the technician to remain active on one site at a time. If the technician migrates from the site, automatically mark his team status at the previous site as inactive.
10 votes -
Work module part search is not looking for manufacturer part number which is what we typically use.
When we search for a part using the manufacturer number it comes back with no results. Also if we use a dash it will come back with all the site parts.
5 votes -
Metric for PM feedback
Metric for PM feedback
6 votesThis is currently in the works. In the WEM App > Job Title Labor Evaluation > Task Feedback there is metrics for feedback from the technicians. It is part of our backlog to add more useful metrics to this dashboard.
-
Photos for parts
I think it would be a huge asset if we could add photos of parts to the database that appear where the "robot arm" is located in the parts screen. Would be good to be allowed multiple photos with arrows to cycle through them. I realize this could open an avenue for error but if a process for validation is created the benefits would be great I think.
15 votes -
Operator Performed Maintenance sub-type should be available for MCRT type work orders.
Customer has requested all down work orders use sub-types to track responsibility for assets being down. The "Operator Performed Maintenance" sub type cannot be added to a MCRT work order. We need this sub-type to be available to MCRT work orders. Can have changed so it is available on MCRT?
5 votesAfter further review with the site, it seems there is a little confusion on this request.
"Operator error" the Operator causes the problem. "Operator performed maintenance" the Operator fixes the problem. The site is trying to use the sub-types to distinguish between who is responsible for resolving an issue and any extended downtime that occurred.
An example of "operator performed maintenance" 3rd shift operator has a non-maintenance machine issue related to training or experience that prevents running the machine. So, the machine sits idle with a down work order submitted. 1st shift operator arrives and being more experienced is able to fix the issue and begins running the machine.
This functionality will also be useful as our Operator-Performed Maintenance (OPM) program continues to grow within ATS. I am reopening the request to discuss further with our teams.
-
Customer view Parts in system
Allow customers to see parts associated with each asset and locations within store rooms to better utilize system and ATS personnel as we wouldn't need to ask them to locate parts for us.
2 votes -
1 vote
-
Period capacity canceling task selection
Allow canceling tasks within the scheduling portal period capacity screen. Being able to select / check multiple tasks would drastically reduce time and bandwidth requirements.
3 votes -
DT required button added to job plan
Add a field in the Job plan template to indicate if this task requires DT
14 votesUnder review with IT team.
-
Duplicacion de Ordenes
advertencia de duplicacion de ordenes, al crear una nueva orden que aparezcan las ultimas dos ordenes creadas para el ID en cuestion, esto para evitar ordenes duplicadas
1 vote -
It would be nice to have the ability to create a work order from the planning task screen
It would be nice to have the ability to create a work order from the planning task screen.
3 votes -
Requerimos acceso a Informe laboral acomulado, con la actualizacion ya no tuvimos acceso
Requerimos acceso a Informe laboral acomulado, con la actualizacion ya no tuvimos acceso
1 vote -
Equipment tags
For customers and for ATS users... on equipment add a section to add equipment tags. This could be used for users to input other nicknames used for the asset to help when searching for equipment when creating work over. The customers have trouble searching Assets when creating work order
2 votes -
Adding Attachments after Reviewed Status
Adding Attachments after WO is reviewed/closed out
1 vote