eFactoryPro 3.0
244 results found
-
Refresh button in work module
Within the work module of eFP, for the work order and task grid, can we get a refresh button, which would allow us to refresh the data. This helps with newer work orders which have been entered into the system.
6 votes -
Require Standard Part Nomenclature to Part Description
Parts need a standard description to search parts effectively (ex: All 1-7/16" 4-bolt Flange Block Bearings should be listed as: "1-7/16IN ID; 4B; FB" or all 480V 15HP 3500RPM 215 C-face motors should be listed as "15HP; 3500RPM; 215TC; 480V"). This will greatly increase the buyer and supply chain specialist's abilities to source parts from other local sites, vendors, or manufacturers.
If possible, this could be done as "required fields" when entering new parts into the system that auto-generate a part description from the fields.19 votes -
Correcting Parts Used within the WEM Review Process
Having the capability to correct Parts Used during the reviewing WEM process.
1 vote -
Filter Fix
WO/Task filter need to be reworked. Sometimes it works but most times when you type in a specific workorder or task number it just comes up with a full list of either one.
2 votes -
Planner Portal scheduling board that has a weekly view For PS to drop an entire weeks schedule onto that can have individual days selected
currently I use an Excel workbook with a sheet for each day. i print out each day and bring it to tier one meetings for technicians and a copy is emailed to customer so they know what machines we plan on taking each day. every cell on that page has to be filled out on every task each day of each week.
I propose a week display where you fill in a selected task number and it auto populates the rest of the information (asset iD, description of task, a blank notes section that can add notes if needed, planned…3 votes -
Quantity Adjustment
Supply chain specialists and technicians need to be able to adjust the quantity of parts ordered both up and down. Not allowing people to adjust upwards is not efficient and makes no sense at the site level.
6 votes -
When a workorder is scheduled for more than one person it shouldn't be able to be closed out until everyone has closed their section.
When a workorder is scheduled for more than one person it shouldn't be able to be closed out until everyone has closed their section. The way it is now once someone closes it the others who haven't put their time in do does not get their time accounted for.
3 votes -
Determine type of job by work order on the review tab
If we can add type of job performed by work order as for example: Electric, Mechanic, Hydraulic, Pneumatic, Electronic, Lubrication, Coolant. We can determine Downtime & MTTR due to each of these, by plant, area, or technician. With this we can understand development needs by plant, area or technician, so we can set the trainings needed for our people and also track its effectiveness on each specific case
12 votesGreat suggestion! There is projects currently in place to tackle this exact issue. We are redefining the skills and skillsets for technicians, equipment, and for job requirements. These 3 will work together to specify development requirements for technicians and provide us with skillset requirements based on equipment requirements.
-
Assignations
Assignations always displayed on "My Work", not for date and add filter by date.
12 votes -
Part number search should disregard dashes, slashes, etc.
When searching for a part, if the number has a dash it will not show any results if you do not type the dash.
5 votes -
Include a column for Asset criticality in the Tasks portal.
We have almost 200 WO tasks with a priority 3 status. It would be nice to see the asset criticality to prioritize the wo tasks.
7 votes -
Asset ID Update
The system utilizes both a equipment number (which I'm assuming is a primary key for the equipment file) and the asset ID. If that is the case, why can't the Asset ID be updated during work order review without a major overhaul to the work order by deleting information off the task first?
1 vote -
Task View
When I scroll down to look for a particular task and find and open the task, I found the task list jumps back to top of the list and then I have to scroll through the list again to find what I was looking for. I suppose if I noted the task number it would not be that big of an issue, but it would be handy if the list just stayed in the position that I stopped. Really a pain when you have multiple Work Orders.
5 votesunder review · AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) respondedThank you for your feedback! We are looking into the technical requirements for making this happen.
-
Quality Assurance Request: Send Notifications when Regulatory PM task date is modified
This is a new position in Mexico and as part of my role, I need to receive a notification when a regulatory PM task date is modified. I already contact the support IT team and this option is not currently available. Please, can you assist?
9 votes -
Search options
Bring back the search options from the last versions.
1 vote -
Parts search and adding
Adding parts to a work order is to complicated. It is taking technicians double the time to find the part in the system and then add it to the work order. I like what was added as far as the advanced filtering capabilities goes but that should be a separate option. Having the search default to the BOM of the equipment is not helpful since not every item you work on has an asset id. We need a basic search capability like we had before with my site stock and that would satisfy 90% of all technician parts needs.
13 votes -
7 votes
-
Need excel export to include entire filtered selection
Period capacity currently exports only 100 rows. My exports would usually contain 400-500. I use this to allow the customer to see what work we have scheduled for a particular week.
7 votes -
Revert to original portal search/sort features vs filters
The filters are extremely inefficient. Also, filters takes away the ability to see examples of what is included in the column.
4 votes -
When scheduling a task in period or daily capacity - flag the that additional tasks exist for that asset.
Period - Will help us ensure we're scheduling all open tasks for an asset that can be completed at once - planned correctives and current PMs.
Daily - So we visit the asset only once
6 votes
- Don't see your idea?