eFactoryPro 3.0
293 results found
-
Proposal: Add the Repair Code field to the Shift Turnover Report. Justification: Including the Repair Code in the shift turnover report wil
Proposal:
Add the Repair Code field to the Shift Turnover Report.Justification:
Including the Repair Code in the shift turnover report will provide direct and timely access to essential operational data. Currently, BI reports are experiencing issues due to the recent V3 update, causing delays in data availability. By adding this field to the turnover report, we can ensure an immediate and reliable source of first-hand information, improving decision-making and reducing dependency on BI reports.23 votes -
Required Data Entry / Meter-Gauge Readings
There isn't an existing method to enter and record critical data that is needed to be collected, monitored, and trended. Requesting a form to allow critical data readings to be entered, recorded, and imported into Excel and/or PowerBI for historical trending.
39 votes -
Export the Job Plan list from the EFP portal.
Export the Job Plan list from the EFP portal.
23 votes -
Improve "Feedback" function in Planning/job plans.
When sorting by "Feedback" in Planning/job plans, need to be able to tell if we have already addressed that issue. Today, when we sort by Feedback, it lists every job plan with feedback that was ever created. In order to see what has been addressed and what is new, the Planner has to re-review EVERY feedback note. Very impractical.
7 votes -
conteo de horas
Mejorar que al finalizar el mes y comenzar el otro mes ,que no se borre el registro de mano de obra de ordenes ya cerradas ,para poder ver cuantas horas se lleva en la semana
1 vote -
Add "Child Machine Type" to Equipment Group for Filtering and Metric Separation.
This will allow simplified asset registry filtering and metric separation from parent assets.
2 votes -
Making search easier
Add search operators to part search feature.
2 votes -
Cambio de unidad de horas a minutos en reporte
Buenas tardes,
Nos pudieran ayudar para que el reporte de shift turnover reporte venga el tiempo muerto, tiempo de reparación y tiempo labor en unidad de minutos con 2 decimales, por favor. Muchas gracias.1 vote -
Predictive Maintenance still generates
PDM tasks should generate as PdM task types instead of PM. Also, there should be some differentiation in FM tasks based on whether they come from PdM and PM's to allow for easier data analysis of PM and PdM Effectiveness.
7 votes -
We need the ability to sort completed workorders by the date it was completed.
Customer wants us to report out weekly on FMs created and FMs completed but if we complete an FM from 3 months ago it's more difficult to find without the ability to search by date completed.
6 votes -
Change Asset Search Criteria when creating new work order to "contains"
Change the Search functionality in the work order generation portal that the customer uses from Equals to Contains. By changing the search function to contains, it will help the customer find specific sub-assets that are tied to a main asset without having the exact wording. should reduce the number of workorders input incorrectly on asset name and also make it easier to find the asset when entering work orders
9 votes -
Obsolete parts still pull in EFP
Parts marked as obsolete in EFP/SMP are populating when technicians search for parts in EFP. This leads to confusion and as of recently, lead to improper part handling and consumption at the site. Obsolete parts should not populate in a search on the user end, much like decommissioned and scrapped assets do not populate when you search for them when creating a work order.
2 votes -
test 2
test 2
1 vote -
test
test
1 vote -
Change asset IDs without having to delete time, repair, and malfunction.
When an operator submits a task with the wrong asset id, and it isn't noticed until after labor and notes have been added, they have to be deleted and put back on once the asset ID has been changed.
8 votes -
Daily Capacity Report
I like how we can export the Daily Capacity Report to Excell, but it does not have information needed to do anything with it other than how many minutes the job takes and who's assigned. Could we get the criticality and Status information to go along with the export.
1 vote -
Job Plan steps need line and paragraph breaks in work orders
Planner/Schedulers go to great care to create detailed steps often with several sub-steps and places to check off completion. It looks great printed out in a pdf. But on the computer or iPad screen, carriage returns and paragraph breaks are ignored and the steps are just giant run on sentences that are jumble together.
5 votes -
Pictures/Attachments at the Task Level
Provide the ability to add in Pictures and Documents at the task step level. This will provide more direction on the activities required by the technicians and enable the ability to provide more detailed procedures to support the execution of steps during work on a machine.
6 votes -
comment count
Would it be possible to add a field that contains the number of comments on the work order. I commonly look for historical events that all had many notes on them because I know they tie to machine events I've had before.
1 vote -
Auto-populate tasks in the feed when they are submitted
Add a live feed or auto-refresh to the task and workorder portals so we don't have to refresh as often. When a work order/Task comes in it'll automatically populate the feed.
1 vote
- Don't see your idea?


