eFactoryPro 3.0
308 results found
-
Obsolete parts still pull in EFP
Parts marked as obsolete in EFP/SMP are populating when technicians search for parts in EFP. This leads to confusion and as of recently, lead to improper part handling and consumption at the site. Obsolete parts should not populate in a search on the user end, much like decommissioned and scrapped assets do not populate when you search for them when creating a work order.
2 votes -
Add new field on shift turnover report, seperate reduced time and downtime
Is there a way to separate DT & reduced time into different fields. I recently became aware our shift turnover report is reporting inaccurate data regarding true DT. Most of our people tracking DT will do so using a shift turnover report, I recently came across TaskID 6396664 for site 727, where they have a reduced ticket showing 543hrs of DT. As far as cost savings goes, this can defeat any savings potential we have for this project. We need to truly differentiate DT and Reduced time.
2 votes -
Add Status Reason of RESCHEDULE to Edit Task Summary
Oftentimes, a PM is compliance is lapsed, but if it is a monthly, the new one will not generate for the next period yet. It is better to RESCHEDULE it within the current or next period than to use any other option under Status.
2 votes -
Add Asset ID to the task list on the EFP IOS App
When technicians receive a task list in the EFP IOS App they do not have visibility of the asset id unless they click into the task. This can create extra steps and data integrity misses when common job plans/pms are added to multiple tasks/assets in a shift.
2 votes -
System Generated Auto Scheduling
Would cut down on time if there was a method to auto-populate schedule with items that are planned and within an upcoming compliance window. Have a "suggested" auto schedule that could be edited or added-subtracted from after posting.
2 votes -
Change color of Reduced Status
Change color of operating status - Reduced - to further differentiate between Red Down. Reduced looks orange/too similar.
2 votes -
additional fields in shift reports
The labor comments and the notes sections need to have their own separate fields when displaying in the shift turnover report.
2 votes -
Inventory adjustment
There needs be be a parts adjustment on a bearing 205pp I used two but inventory showed only one
2 votes -
Job Remarks Section
The original EfP had a job remarks section that would allow you to view all remarks under an asset without needing to open each individual work order. That feature was widely used and very helpful in looking for previous issue, repairs, and machine health trends. This would be useful in the current iteration as well.
2 votes -
PM -> AM button changes labor time field.
When adding labor to a task after 12PM, if you select the start time and enter the hour then minute then click the PM -> AM button, it appears to work but will enter a different time when you press 'Set'. The PM -> AM button must be pressed first to work correctly. Would be nice if it worked in any order.
2 votes -
test-tru
test
2 votes -
test-tru
test-tru
2 votes -
Print WO/TASK with Parts Used and Part Needs
When a tech, planner, or SCS prints a WO/Task it should have the parts used and the part needs listed. This will help when kitting or staging parts that are just received in or ready to be installed.
2 votes -
Part need issues, Location issues with Fastest lead time and custom
When adding a part to a task the two options for Fastest Lead Time and Custom create more issue than it actually helps. It defaults to Location ATS when most sites are location Customer. It should not allow them to select ATS or Customer based on the contract type. IT will also create bad stock records under the wrong location. Finally, it will generate a REQ to order under that wrong location which the SCS or Buyer may not catch. This cause billing and inventory issues.
2 votes -
Saving table and team filter
Is there a way to save your table filters or team filter
2 votes -
Period Capacity Export Planned Hours Format
Reformat the Period Capacity export planned duration hours column to be in a Decimal Point Number format instead of the current format of 0 HRS 38 MIN. The current format has to be converted every time someone exports it to Excel then they have to manually do the conversions.
2 votes -
Customer view Parts in system
Allow customers to see parts associated with each asset and locations within store rooms to better utilize system and ATS personnel as we wouldn't need to ask them to locate parts for us.
2 votes -
Equipment tags
For customers and for ATS users... on equipment add a section to add equipment tags. This could be used for users to input other nicknames used for the asset to help when searching for equipment when creating work over. The customers have trouble searching Assets when creating work order
2 votes -
Filter Fix
WO/Task filter need to be reworked. Sometimes it works but most times when you type in a specific workorder or task number it just comes up with a full list of either one.
2 votes -
Make more User friendly Group List
Option to adjust group list to have most used at top of list by as set by individual user.
Ex: -RIW -RIW: Phase 1 ..... I dont need these at the top of my list having them at top pushes the groups i use lower down.2 votes