eFactoryPro 3.0
313 results found
-
parts location
we need parts location on parts used
3 votes -
display
Can you have the option of saving personal preferences
3 votes -
Parts Needs Forecast
A report that will look at all needed materials on all open PMs, show the availability (in stock or not) and the pm compliance dates. This would help with kitting and verifying all needed parts are at least on order for future PMs with customer promise dates prior to compliance due dates.
3 votes -
BOM
It would benefit the technician if we could see the bill of material (BOM) on the work order for that specific piece of equipment. This was good on efactory 2.0.
3 votes -
Free text space
Free text note filled in period capacity, i.e. offsite – able to add notes as needed from week to week
3 votes -
STR based on Task Touched Date Rather than Created Date
It would be nice to have a report just like the Shift Turnover Report, but instead of running based on task/work order created date, it would go off of when the task was last modified. For instance, if I ran the STR for just today, it would only show tasks that were created today. This would miss any work done on a task that was created in the past (like a PM that would have been created a month ago, or a backlog work order that is 6+ months old)
3 votes -
customer closed work order alert
The customer would like to see the original Work Order description when they get the alert that a work order is closed. sometimes the tech comments are not descriptive enough for them to remember what the work order was particularly when they have a lot of work orders they put in the system.
3 votes -
Fast Automatic Logout
Reduce time until automatic logout when computer is idle. Prevents unauthorized access
3 votes -
Add model #'s to Equipment page
Portal-Equipment
Need to have model # displayed.3 votes -
way to label issues Mechanical or electrical
would make assigning work orders and for tech to find tickets that fit their skill set if there was a drop down that allowed for identification.
3 votes -
Add "Asset ID" column to PM List report in ATS_FMS_Reports
Add "Asset ID" column to PM List report in ATSFMSReports.
It would be more efficient to have the Asset ID showing on the PM List report.3 votes -
model number
no model number in summary can it be added
3 votes -
Mejores ocpiones para el cliente al colocar una orden
Se requiere que el sistema de ordenes del cliente muestre opciones de eventos o soporte cunado el equipo este CAIDO pero la tarea no sea responsabilidad directa de mantenimiento.
Actualmente el cliente esta cometiendo el error de colocarnos ordenes con status CAIDO y la tarea es soporte en actividades de ellos como setup o fixtures. Realmente el equipo esta CAIDO para ellos mas sin embargo nos afecta a nosotros por que se cataloga como REACTIVO.
3 votes -
Reporting: Tech Utilization /overlapped time stamps in PowerBI
In one of the latest updates, i noticed the BI background data has a new sheet for overlapping malfunctions.
Can we get the same type of function for overlapping timestamps?
Or more ideally, can we eliminate the ability for technicians to overlap their time stamps?PowerBI sometimes reflects over 100% utilization for technicians due to overlapped time stamps
3 votes -
Control Center: Add Escalation condition for nuisance failures / high part spend
I would like to have an alert like an escalation for when a piece of equipment has X amount of failures in Y amount of time
Or when the cost of repair is above a set amount.
3 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
This request is currently being discussed with FMS Leadership for possible inclusion in the eFP 3.0 development queue.
-
Data Extraction / Extracción de datos
Evaluar la implementación de APIs en la plataforma, que permitan extraer automáticamente la información de las órdenes. Para optimizar el trabajo. Los power Bi, son de gran ayuda, pero es más tardado estar bajando reportes cada que se requieran. ///
Evaluate the implementation of APIs on the platform to enable the automatic extraction of order information and optimize workflows. While Power BI is very helpful, manually downloading reports whenever they are needed is time-consuming.2 votesNate will contact the user and get back to us with more information about the request, so this has been tabled for now.
-
PM Plans "Building" field editable
When reviewing PM Plans, there are fields that I wish I could edit, that I can't. Such as the "Building" field. When I click the "EDIT" button to the right of the row, it takes me to a new page where I can not update that information.
2 votesStanton Sparks will be gathering more details on this from the user
-
Task notes formatting
It would be helpful if we can add formatting to task notes like bullet points, separate paragraphs, indentations, etc. The job plans were updated to allow this formatting and it would be nice to have the same in task notes.
2 votesCarl will reach out to the users and get back to us with more information regarding the need.
-
Make cycle count consistant.
When running stock count at the end of the month, it should not remove parts from the cycle count and then ding SCS metrics for it. For example, several times I have ran my cycle count last day of the month and not get 100% even though I entered 100% of what was on the list. This is due to the system creating its expected count on the 1st of the month (example 93 parts) but then NOT giving me the full count at the end of the month (ex 89 parts). Then it causes the SCS to have bad…
2 votesWe're currently working on a new supply chain portal that includes the cycle counts functionality. We'll keep this feedback in mind as we continue designing that experience. While we can't make any commitments about specific changes at this time, improving usability and layout are considerations we're taking into account as the new portal is developed.
-
Runtime/Downtime Designation
Currently there is no designation to identify if a planned job requires a machine to be operating or down in order to perform. This should be an available designation when planning because it will allow for better visibility of what is required of a job and make scheduling with a customer 100X easier. It will allow us to explicitly tell a customer how much downtime we need on a machine to perform a job.
2 votes
- Don't see your idea?


