eFactoryPro 3.0
311 results found
-
STR based on Task Touched Date Rather than Created Date
It would be nice to have a report just like the Shift Turnover Report, but instead of running based on task/work order created date, it would go off of when the task was last modified. For instance, if I ran the STR for just today, it would only show tasks that were created today. This would miss any work done on a task that was created in the past (like a PM that would have been created a month ago, or a backlog work order that is 6+ months old)
3 votes -
customer closed work order alert
The customer would like to see the original Work Order description when they get the alert that a work order is closed. sometimes the tech comments are not descriptive enough for them to remember what the work order was particularly when they have a lot of work orders they put in the system.
3 votes -
Fast Automatic Logout
Reduce time until automatic logout when computer is idle. Prevents unauthorized access
3 votes -
Add model #'s to Equipment page
Portal-Equipment
Need to have model # displayed.3 votes -
way to label issues Mechanical or electrical
would make assigning work orders and for tech to find tickets that fit their skill set if there was a drop down that allowed for identification.
3 votes -
Equipment & Sub-Locations in Tech Portal
Split out equipment and sub-locations
3 votes -
Add "Asset ID" column to PM List report in ATS_FMS_Reports
Add "Asset ID" column to PM List report in ATSFMSReports.
It would be more efficient to have the Asset ID showing on the PM List report.3 votes -
model number
no model number in summary can it be added
3 votes -
Reporting: Tech Utilization /overlapped time stamps in PowerBI
In one of the latest updates, i noticed the BI background data has a new sheet for overlapping malfunctions.
Can we get the same type of function for overlapping timestamps?
Or more ideally, can we eliminate the ability for technicians to overlap their time stamps?PowerBI sometimes reflects over 100% utilization for technicians due to overlapped time stamps
3 votes -
Control Center: Add Escalation condition for nuisance failures / high part spend
I would like to have an alert like an escalation for when a piece of equipment has X amount of failures in Y amount of time
Or when the cost of repair is above a set amount.
3 votesunder review · AdminMichelle Oldfield (Business Analyst, Advanced Technology Services, Inc.) respondedThis request is currently being discussed with FMS Leadership for possible inclusion in the eFP 3.0 development queue.
-
full circle
Lets connect parts arrival notifications to e-mail the originator and the scheduler so we can plan repairs.
2 votes -
Job plan steps should have an option to attach images
Planner/Schedulers should be able to attach image files (PNG/JPG/GIF) to specific steps in a job plan. The technician should be able to see those images for each step and enlarge them in the steps screen.
The downside of using attachments for the files is that 1) the tech has to go back and forth between steps and attachments, and 2) it's harder to organize the images based on a specific step
2 votes -
Would be helpful to narrow down searches with AND logic. So you could use "relay" AND "24" to narrow search for 24 volt relays
Search using AND logic
2 votes -
Feedback does not work
Feedback does not work
2 votes -
Pm needs to be removed
This silo isn’t operational any longer and pms are still being assigned to techs
2 votes -
Allow Task Filter by "Kitted & Staged" in eFP
I would like to run a list of task by "kitted and staged" status. I do not see the option.
2 votes -
reactive to proactive
could there be a quicker way to change a job to proactive if the customer has put it in as reactive rather that having to open a new ticket
2 votes -
Task tile sort
Make the task tiles sortable. either by dragging and dropping in any order or sorting by status
2 votes -
Staged parts removed from available count.
Staged parts should be removed from inventory availability count. This will trigger the system to initiate a restock based on demand. Also, this will allow for inventory to be staged in reusable job plans that regenerate.
2 votes -
Edit dates on Containers
Have the ability to shifts dates on containers. The plant we run at has constantly changing run periods and downtime periods. This would allow us to create containers for the run time and downtime separately and shift dates as needed. Save on doing double work from production schedule changes last minute.
2 votes
- Don't see your idea?