eFactoryPro 3.0
313 results found
-
eFP web version on iPad
eFP web version on iPad does not show all of the tabs across the top of the task, in order to close it.
The “Event” tab is cut in half, the green check mark and red cancel buttons are completely missing.
I understand that there is an actual eFP iOS app, but it is not written in Spanish. The web version can be translated to Spanish through the preferred language setting of the iPad.
The web version works like normal on the iPad, with exception to the problem mentioned above.
4 votes -
Need to see work order sub status in the Supervisor grid
As a supervisor, it would be helpful to see the Work Order sub-status (Cancel/duplicate) in the grid from the Review work order panel. This would allow you to see, at a glance, which PMs were just canceled vs. canceled/duplicate.
4 votes -
Change Labor Hours to Rolling 30 days
Labor hours should display last 30 days instead of hours entered in the current month. When the first day of the month occurs, the Labor Hours screen is blank.
4 votes -
PdM Follow Up Tasks
We need the ability to assign follow up tasks on PdM Work Orders to a specific asset (maybe have a drop down box). Currently, most PdM work orders are routes for the entire facility. Instead of creating a PdM work order for each asset, we would like to have the ability to assign follow up tasks on this work order type to assets.
4 votes -
Down time and escalation time have different counters
We have a problem with the programation of the system. For example our client has a production schedule from 6:30am to 12:00 am, if our client enter a WO for a reactive work at 11:30 pm, the down time starts from 11:30 pm it is interruptted at 12:00am and then starts counting again at 6:30am, we dont have problem with that. The problem is the scalation system: If our client enter a WO for a reactive work at 11:30pm the time for scalation starts counting and it doesnt stop at 12:00am, it continuing counting. This situation provoques scalations for high…
4 votes -
Manditory creator of task name on task
Make it a requirement for creator of task/work order to put there name so we can know who to ask questions and get needed information to perform the task.
4 votes -
Daily Capacity Report
I like how we can export the Daily Capacity Report to Excell, but it does not have information needed to do anything with it other than how many minutes the job takes and who's assigned. Could we get the criticality and Status information to go along with the export.
3 votes -
Obsolete parts still pull in EFP
Parts marked as obsolete in EFP/SMP are populating when technicians search for parts in EFP. This leads to confusion and as of recently, lead to improper part handling and consumption at the site. Obsolete parts should not populate in a search on the user end, much like decommissioned and scrapped assets do not populate when you search for them when creating a work order.
3 votes -
EFP Dark Mode
I would really like a dark mode option for EFP. This would reduce eye strain. Currently using third party plugins to darken this group of tabs.
3 votes -
In Planning Portal - Job Plans tab, It is not allowing search by Equipment or sort the column.
Please allow Search filter for Equipment in this portal to work. We are asked for all PMs on certain equipment - this would allow them to be easily printed but current Equipment field doesn't work when filtered on main tab for Job Plans.
3 votes -
sign out
efactory doesn't automatically sign you out when you close the page. This causes people to use other tech's accounts when adding time and labor. Can you add an automatic sign out when the page is closed?
3 votes -
full circle
let's add a notes added by Columb so we can quickly look up any work orders we added notes to.
3 votes -
3 votes
-
FM task completion notifications
I want to be automatically notified when certain FM tasks that I did not create are completed.
3 votes -
Staged parts removed from available count.
Staged parts should be removed from inventory availability count. This will trigger the system to initiate a restock based on demand. Also, this will allow for inventory to be staged in reusable job plans that regenerate.
3 votes -
Replace the planned start date with the first date of the period capacity or Scheduling Period dates on the all open tasks screen.
Replace the planned start date with the first date of the period capacity or Scheduling Period dates on the all open tasks screen.
3 votes -
Mandatory Place ID entry when creating Stock Count for Cycle counts
Make this a mandatory input field so stock counts/cycle counts are not ran wide open for the whole company/all sites.
3 votes -
Authority to cancel parts used/consumed.
Option to cancel parts consumed/ used. Operators have entered in wrong part number or quantity and consumed it by mistake.
3 votes -
Period capacity canceling task selection
Allow canceling tasks within the scheduling portal period capacity screen. Being able to select / check multiple tasks would drastically reduce time and bandwidth requirements.
3 votes -
When a workorder is scheduled for more than one person it shouldn't be able to be closed out until everyone has closed their section.
When a workorder is scheduled for more than one person it shouldn't be able to be closed out until everyone has closed their section. The way it is now once someone closes it the others who haven't put their time in do does not get their time accounted for.
3 votes
- Don't see your idea?


