eFactoryPro 3.0
274 results found
-
FM task completion notifications
I want to be automatically notified when certain FM tasks that I did not create are completed.
3 votes -
Text notifications when all parts are allocated to WOs that require kitting
When the SCS receives all parts to a WO, the tech that requested the parts would get an automated text notification that their parts have arrived.
6 votes -
additional fields in shift reports
The labor comments and the notes sections need to have their own separate fields when displaying in the shift turnover report.
2 votes -
Inventory adjustment
There needs be be a parts adjustment on a bearing 205pp I used two but inventory showed only one
2 votes -
Agilizar el filtrado de ordenes a revisar (Supevisores)
Visibilidad en pantalla principal de revisión de ordenes de que técnico cerró la tarea.
Nos agilizará a los supervisores el filtrado de las ordenes que requerimos revisar.
5 votes -
Photos for parts
I think it would be a huge asset if we could add photos of parts to the database that appear where the "robot arm" is located in the parts screen. Would be good to be allowed multiple photos with arrows to cycle through them. I realize this could open an avenue for error but if a process for validation is created the benefits would be great I think.
15 votes -
Status monitor with UP CM tickets.
Need a way to monitor up tickets that are CM tickets on the status monitor. All to often we customer puts in tickets as down or reduced so they can keep track of them and they do not affect production of a machine. This is not down and should not affect machine availability. However, do not want to show all up tickets on the status monitor as it will show all PMs as up tickets. Somehow we need a way to display CM tickets that are up so they do not get forgotten about.
1 vote -
Staged parts removed from available count.
Staged parts should be removed from inventory availability count. This will trigger the system to initiate a restock based on demand. Also, this will allow for inventory to be staged in reusable job plans that regenerate.
3 votes -
DT required button added to job plan
Add a field in the Job plan template to indicate if this task requires DT
14 votesUnder review with IT team.
-
Replace the planned start date with the first date of the period capacity or Scheduling Period dates on the all open tasks screen.
Replace the planned start date with the first date of the period capacity or Scheduling Period dates on the all open tasks screen.
3 votes -
Letters/words still too light
Please make the words on the screen darker and easier to see. For sites using older screens, the text is still too light to see clearly causing eye strain.
1 vote -
Job Remarks Section
The original EfP had a job remarks section that would allow you to view all remarks under an asset without needing to open each individual work order. That feature was widely used and very helpful in looking for previous issue, repairs, and machine health trends. This would be useful in the current iteration as well.
2 votes -
PM -> AM button changes labor time field.
When adding labor to a task after 12PM, if you select the start time and enter the hour then minute then click the PM -> AM button, it appears to work but will enter a different time when you press 'Set'. The PM -> AM button must be pressed first to work correctly. Would be nice if it worked in any order.
2 votes -
Limit technician active sites
Allow the technician to remain active on one site at a time. If the technician migrates from the site, automatically mark his team status at the previous site as inactive.
10 votes -
Multiple Bins
If the part is in multiple bins allow the option to select which bin you want to pull the part from. Right now it defaults based on BIN name alphabetically. This can cause confusion and inventory discrepancies.
4 votes -
Equipment in Work module needs an additional field to identify "At Risk" equipment.
Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.
5 votes -
Task Planned Proccess Easier and Quicker
Would be helpful to have a quick access to the planner portal into the task to plan the task you are working on it, then once planned back to the task, and dont have to copy the task number, load the planner portal and search the task you want to plan. This would be easier and quiker our work.
28 votes -
Labor Hour Tab Quits Working After 15 days
The labor tab every month only displays out to the 15th. Then I have to select the 16th thru the rest of the month or each day. I use this feature to keep track of my tech utilization hours. Thank you, Michael
1 vote -
Parts requsition vs consumption quantity
Parts (especially liquids) which are allocated/used in quantities different than their containers hold are troublesome. It would be efficient to be able to receive quantities separate from how allocated and used. so 5 gallon pails(or any volume) could be requisitioned and the allocation and use could be done in a different qty/volume count.
6 votes -
test-tru
test
2 votes
- Don't see your idea?