eFactoryPro 3.0
270 results found
-
Error de suministro de aire
Si la maquina no activa el aire, la causa mas probable es que el sistema electrico no hace el aterrizamiento de la corriente directa el voltaje a tierra a el sumistro de energia, en este caso el boton de paro hace la intermitencia de ese aterrizamiento.
1 vote -
BOM
It would benefit the technician if we could see the bill of material (BOM) on the work order for that specific piece of equipment. This was good on efactory 2.0.
3 votes -
Make Feedback two-way
During feedback review, would be nice to be able to reply to feedback to submitter via email directly from P/S portal.
2 votes -
Customer Sign-in
Portal login screen asks for email address where the customer logs in; it should ask for site number or user name.
2 votes -
I-Pad FM Tasks Creation
I-Pad not able to create FM type tasks
2 votes -
Mass Cancel tasks in Ready Backlog
Allow sites to mass cancel open tasks from the Period capacity screen that are no longer needed or past PM dates.
6 votes -
Unit of measure on req/po and the ability to issue parts out by unit of measure
include a drop down for unit of measure on REQ (EA,CS,PCK,BX,LB, etc.) allowing definition by SCS what quantity they are requesting. There then should be a place to define how many units per case and this information should be recorded under the "Supplier parts" tab under the "Parts" section of the system. Once item is received in, you should be able to issue part by unit of measure (EA,CS,PCK,BX) allowing for more accurate inventory and PO receipt relation as well as inventory actual cost on hand information.
4 votes -
Change Priority in Period Capacity to Scheduler
Allow sites to change priority on a task from the period capacity screen in the scheduling portal. This would allow us to be able to move it to the current week without having to go back and forth between the P/S role and the Tech role.
5 votes -
Need to add "NDA EARLY AM" to delivery type menu when processing requisitions.
Need to add "NDA EARLY AM" to delivery type dropdown menu when processing requisitions. This would help with enhancing communication because there are scenarios when "EARLY AM" is needed versus just "NEXT DAY". It's known that the buyer typically selects delivery type when processing req. into POs, but to help enhance communication, the SCS should be able to select delivery type as part of req. processing. If the urgency changes during the transition, then buyer can update as needed.
4 votes -
Put high priority icon (fire) on tiles in the My Schedule view.
Put the same high priority icon (fire) that appears in the planner portal on the tiles in the technician My Schedule views.
1 vote -
PM status change option in planner portal
Can the supervisors or planners have the ability to cancel work orders in the planner portal, either in the daily capacity or period capacity views?
Also, an alternative to "Cancel" missed PM's, since they were not technically cancelled. I don't mind the extra time it takes since it shouldn't be easy. But a better option that more accurately reflects the situation:
Missed-Customer - Due to customer constraints
Missed-Maintenance - Example, equipment not found, low staff, etc
Skipped - Example, in shop for repairs, awaiting parts, etc.To show in the drop down window with Cancel, Cancel-Duplicate, etc.
Just more robust…5 votes -
Daily Schedule Portal Task Hyperlink
Would like the ability to hyperlink into tasks from the daily schedule portal, would help to see notes and time already accomplished etc.
6 votes -
attachment for requisition
The ability to attach information to requisition
1 vote -
Sort field for Asset ID on daily capacity
Add Assets ID for sort field on daily capacity
7 votes -
Daily capacity
40-hour jobs should fill week out when assigned – Once assigned to one tech the week is filled vs having to create 5 tech slots to fill week
7 votes -
Free text space
Free text note filled in period capacity, i.e. offsite – able to add notes as needed from week to week
3 votes -
Period Capacity Select all feature
Select all on period capacity – able to select all will be able to move all over to execution faster
11 votes -
Color Change for rescheduled tasks
Different color (Orange) for items being rescheduled – When assigning tasks from previous week into daily capacity a visual identifier would help
6 votes -
Technicians wish to see compliance window in My Schedule
Technicians have requested the ability to see the compliance window on the My Schedule view in the new system. This will allow for corrections in case the supervisor or planner schedule the PM incorrectly.
13 votes -
BOM Expansion
On the parts tab have a tab/dropdown for listing all parts on the BOM
4 votes
- Don't see your idea?