Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

298 results found

  1. display

    Can you have the option of saving personal preferences

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Make Criticality emergency-1 the default when customer is creating reactive W/O

    When customer is creating a work order they hardly pick the level 1-emergency schedule breaker, if default was level 1 we would have less of a chance of it getting overlooked in the daily schedule.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Make more User friendly Group List

    Option to adjust group list to have most used at top of list by as set by individual user.
    Ex: -RIW -RIW: Phase 1 ..... I dont need these at the top of my list having them at top pushes the groups i use lower down.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. When Parts Arrive For Work Orders

    When Parts Arrive For Work Orders Let The Assigned Tech Know With An Automated Email

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Parts Needs Forecast

    A report that will look at all needed materials on all open PMs, show the availability (in stock or not) and the pm compliance dates. This would help with kitting and verifying all needed parts are at least on order for future PMs with customer promise dates prior to compliance due dates.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Vista previa de imagenes

    Tener vista previa de las fotos subidas, sin tener que descargarlas.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Include Teams as option in control center.

    Description :
    eFactory Pro 3.0 Portal - Control Center, Can we either have "team" or an option for "external team" added to the conditions to set up a new rule.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. list Task# on feedback

    Description :
    eFactory Pro 3.0 Planner/Scheduler portal - Job Plans, Job plan feed back. Please add Task# to Feedback.

    Job plans are used on multiple assets and work orders. Sometimes feedback is machine specific. The list of feedback for any given job plan does not list the Task# that the feedback was entered on. With hundreds of work orders using the same job plan in a given month, it becomes very difficult to validate the feedback.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Error de suministro de aire

    Si la maquina no activa el aire, la causa mas probable es que el sistema electrico no hace el aterrizamiento de la corriente directa el voltaje a tierra a el sumistro de energia, en este caso el boton de paro hace la intermitencia de ese aterrizamiento.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Training  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. BOM

    It would benefit the technician if we could see the bill of material (BOM) on the work order for that specific piece of equipment. This was good on efactory 2.0.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Make Feedback two-way

    During feedback review, would be nice to be able to reply to feedback to submitter via email directly from P/S portal.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Customer Sign-in

    Portal login screen asks for email address where the customer logs in; it should ask for site number or user name.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. I-Pad FM Tasks Creation

    I-Pad not able to create FM type tasks

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Mobile  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Mass Cancel tasks in Ready Backlog

    Allow sites to mass cancel open tasks from the Period capacity screen that are no longer needed or past PM dates.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Unit of measure on req/po and the ability to issue parts out by unit of measure

    include a drop down for unit of measure on REQ (EA,CS,PCK,BX,LB, etc.) allowing definition by SCS what quantity they are requesting. There then should be a place to define how many units per case and this information should be recorded under the "Supplier parts" tab under the "Parts" section of the system. Once item is received in, you should be able to issue part by unit of measure (EA,CS,PCK,BX) allowing for more accurate inventory and PO receipt relation as well as inventory actual cost on hand information.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Change Priority in Period Capacity to Scheduler

    Allow sites to change priority on a task from the period capacity screen in the scheduling portal. This would allow us to be able to move it to the current week without having to go back and forth between the P/S role and the Tech role.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Need to add "NDA EARLY AM" to delivery type menu when processing requisitions.

    Need to add "NDA EARLY AM" to delivery type dropdown menu when processing requisitions. This would help with enhancing communication because there are scenarios when "EARLY AM" is needed versus just "NEXT DAY". It's known that the buyer typically selects delivery type when processing req. into POs, but to help enhance communication, the SCS should be able to select delivery type as part of req. processing. If the urgency changes during the transition, then buyer can update as needed.

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Put high priority icon (fire) on tiles in the My Schedule view.

    Put the same high priority icon (fire) that appears in the planner portal on the tiles in the technician My Schedule views.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. PM status change option in planner portal

    Can the supervisors or planners have the ability to cancel work orders in the planner portal, either in the daily capacity or period capacity views?

    Also, an alternative to "Cancel" missed PM's, since they were not technically cancelled. I don't mind the extra time it takes since it shouldn't be easy. But a better option that more accurately reflects the situation:
    Missed-Customer - Due to customer constraints
    Missed-Maintenance - Example, equipment not found, low staff, etc
    Skipped - Example, in shop for repairs, awaiting parts, etc.

    To show in the drop down window with Cancel, Cancel-Duplicate, etc.
    Just more robust…

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Daily Schedule Portal Task Hyperlink

    Would like the ability to hyperlink into tasks from the daily schedule portal, would help to see notes and time already accomplished etc.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
1 2 6 8 10 14 15
  • Don't see your idea?

Feedback and Knowledge Base