eFactoryPro 3.0
287 results found
-
Addition of materials need from to the PM Forecast SSRS Report
Eaton has requested a monthly materials spend forecast for all needed PMs. The PM forecast will show man hours but no parts that are associated with the task template. The reference table is TaskTemplatePart_Need. This information needs to show up in the PM Forecast Report on the SSRS reporting.
9 votes -
Tech Portal: Add Reason For Variance to the PM Compliance Panel
In the v4 portal, can we add the reason for variance to the PM Compliance information at the bottom of the screen where it shows 'compliance start and finish and date' completed?
This was requested by Mark Howard at Site 491 and Michael Spigner site 202
9 votes -
Tech Portal: Add date completed line to work order history
When you look at a piece of equipment's work order history , please add a date completed line.
If there is an AUDIT you can print the machine history to show past PM's completed as well as work orders completed
9 votes -
Change asset IDs without having to delete time, repair, and malfunction.
When an operator submits a task with the wrong asset id, and it isn't noticed until after labor and notes have been added, they have to be deleted and put back on once the asset ID has been changed.
8 votes -
8 votes
-
EFP 3.0 inventory levels
In the old system, us technicians on the floor could visually see the min/max levels of parts we were consuming. This allowed us to know if the part was going to be reordered or not. In the technicians portal of EFP3.0, we are unaware if the part we have consumed will be reordered or not. This is valuable to know if we will need that part again and not be in stock.
8 votes -
Adding Sublocation description on Work order print
When using work order print on report server, the sublocation number is given. It would be more user friendly if this was the sublocation description instead.
8 votes -
Improve "Feedback" function in Planning/job plans.
When sorting by "Feedback" in Planning/job plans, need to be able to tell if we have already addressed that issue. Today, when we sort by Feedback, it lists every job plan with feedback that was ever created. In order to see what has been addressed and what is new, the Planner has to re-review EVERY feedback note. Very impractical.
7 votes -
Predictive Maintenance still generates
PDM tasks should generate as PdM task types instead of PM. Also, there should be some differentiation in FM tasks based on whether they come from PdM and PM's to allow for easier data analysis of PM and PdM Effectiveness.
7 votes -
Repair Notes Visibility
Create a report presenting repair notes per Task Number or add repair notes to the remarks or add repair notes to the shift turnover report.
7 votes -
Have a way to schedule workorders back to individual as you reopen it, and be able to flag it so the technician Knows
Have a way to schedule workorders back to the individual as you reopen it, and be able to flag it so the technician can Easly identify it needs reworked
7 votes -
Include a column for Asset criticality in the Tasks portal.
We have almost 200 WO tasks with a priority 3 status. It would be nice to see the asset criticality to prioritize the wo tasks.
7 votes -
Need excel export to include entire filtered selection
Period capacity currently exports only 100 rows. My exports would usually contain 400-500. I use this to allow the customer to see what work we have scheduled for a particular week.
7 votes -
New Repair Codes
New Repair codes for cFactory Pro
Laser
Anode
Circuit Board7 votes -
Sort field for Asset ID on daily capacity
Add Assets ID for sort field on daily capacity
7 votes -
Daily capacity
40-hour jobs should fill week out when assigned – Once assigned to one tech the week is filled vs having to create 5 tech slots to fill week
7 votes -
Add "Requestor" as a column in Tasks tab in the Technician portal
Add "Requestor" column in the TASKS tab in the Technician portal that is similar in the WORK ORDERS tab. This will be very useful for management to identify the Technician that creates a FM (Follow-Up Maintenance) task on MPRO Work Orders. The current process requires the user to click on each individual FM task and scrolling the summary page to find the technicians name under "CREATED".
7 votes -
7 votes
-
Bill of Materials Report-Add Bin Location
The Bill of Material (BOM) report in the client should include the bin location of each part listed on the BOM. This way it's easier for a tech or SCS or Planner etc to physically look for these parts in the Crib.
7 votes -
Please consider a dropdown list, or equivalent, to work order review that identifies which organization is responsible for work.
Our site is being asked to track all physical downtime on assets, and then be able to report out who's scope of work the downtime falls under for CI efforts. Possible examples are "Lubrication Provider," "Facilities," and "Outside Contractor/Services."
7 votes
- Don't see your idea?