eFactoryPro 3.0
308 results found
-
GNS PO Receipts need to batch at 11:58 PM instead of Midnight
GNS PO Receipts need to batch at 11:58 PM instead of Midnight for reporting purposes at sites that need to provide reports to our customers for amount spent in a specific time frame. The current method makes it difficult to accurately report when GNS PO receipts are made the last day of the month but reports show transaction at midnight on the first of the month.
10 votes -
Tech Portal: Multi-Filters in Portal Search
Can you please add the option to select more than one filtered option when using the search function on the portal.
i.e. i would like to display tasks or work orders for several different sub-locations
10 votes -
Dark mode option
Dark mode to prevent headaches and eye strain during long time use
9 votes -
Customer adding attachments to WOs when they make them
I know this has been suggested before and the concern was bad actors would add malicious files. I'm wondering if it would be possible to let the customers add attachments in the screen where they enter new WOs and not just at any point in the process. I know it would be very beneficial to our site for customers to be able to enter pictures of problems.
9 votes -
Improve "Feedback" function in Planning/job plans.
When sorting by "Feedback" in Planning/job plans, need to be able to tell if we have already addressed that issue. Today, when we sort by Feedback, it lists every job plan with feedback that was ever created. In order to see what has been addressed and what is new, the Planner has to re-review EVERY feedback note. Very impractical.
9 votes -
Change asset IDs without having to delete time, repair, and malfunction.
When an operator submits a task with the wrong asset id, and it isn't noticed until after labor and notes have been added, they have to be deleted and put back on once the asset ID has been changed.
9 votes -
Change Asset Search Criteria when creating new work order to "contains"
Change the Search functionality in the work order generation portal that the customer uses from Equals to Contains. By changing the search function to contains, it will help the customer find specific sub-assets that are tied to a main asset without having the exact wording. should reduce the number of workorders input incorrectly on asset name and also make it easier to find the asset when entering work orders
9 votes -
PO GNS Receipt Improvement
When booking in GNS parts is it possible to remove the "Total Cost" field? The reason being is that it does not make any difference to the total, no matter what value i put in this box. Therefore we are all wasting our time every time we book in a GNS part when we fill in this field.
9 votes -
Add a "Missed" button to WO Type: MPRO > Task Type: PM
There needs to be an additional button labeled as "Missed" in the Work Order or Task Pane for "PM" Task Types only. This button should function similar to the Red X for "Cancel Work Order" or "Cancel Task", except when you select this option, it should trigger a window to pop up requesting a reason for variance. i.e. Equipment Unavailable, Personnel Needed etc. and it should also require the user to type a comment/note.
Example for why this option needs to be available:
Asset XYZ-123 has a PM generated on a monthly interval.
The monthly PM was completed in Jan,…9 votes -
Addition of materials need from to the PM Forecast SSRS Report
Eaton has requested a monthly materials spend forecast for all needed PMs. The PM forecast will show man hours but no parts that are associated with the task template. The reference table is TaskTemplatePart_Need. This information needs to show up in the PM Forecast Report on the SSRS reporting.
9 votes -
Tech Portal: Add Reason For Variance to the PM Compliance Panel
In the v4 portal, can we add the reason for variance to the PM Compliance information at the bottom of the screen where it shows 'compliance start and finish and date' completed?
This was requested by Mark Howard at Site 491 and Michael Spigner site 202
9 votes -
Tech Portal: Add date completed line to work order history
When you look at a piece of equipment's work order history , please add a date completed line.
If there is an AUDIT you can print the machine history to show past PM's completed as well as work orders completed
9 votes -
Pictures/Attachments at the Task Level
Provide the ability to add in Pictures and Documents at the task step level. This will provide more direction on the activities required by the technicians and enable the ability to provide more detailed procedures to support the execution of steps during work on a machine.
8 votes -
8 votes
-
Need excel export to include entire filtered selection
Period capacity currently exports only 100 rows. My exports would usually contain 400-500. I use this to allow the customer to see what work we have scheduled for a particular week.
8 votes -
New Repair Codes
New Repair codes for cFactory Pro
Laser
Anode
Circuit Board8 votes -
Daily capacity
40-hour jobs should fill week out when assigned – Once assigned to one tech the week is filled vs having to create 5 tech slots to fill week
8 votes -
EFP 3.0 inventory levels
In the old system, us technicians on the floor could visually see the min/max levels of parts we were consuming. This allowed us to know if the part was going to be reordered or not. In the technicians portal of EFP3.0, we are unaware if the part we have consumed will be reordered or not. This is valuable to know if we will need that part again and not be in stock.
8 votes -
Adding Sublocation description on Work order print
When using work order print on report server, the sublocation number is given. It would be more user friendly if this was the sublocation description instead.
8 votes -
Scheduled/Unscheduled Downtime in Malfunction Screen
Today in the Malfunction Screen there is logic built in that determines if a Malfunction is considered a Breakdown which dictates if the Downtime/Reduced time is "Scheduled" or "Unscheduled". This logic does not accurately show this and causes excess rework to modify tasks to place the data into the right category. This causes inaccuracy in downtime calculations and Eaton CONC calculations which we are held accountable to with our customers. We should remove the logic with these breakdowns and create a toggle for the user to define if the Downtime is Scheduled or Unscheduled with Unscheduled being the default category.
7 votes
- Don't see your idea?


