Skip to content

eFactoryPro 3.0

eFactoryPro 3.0

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

311 results found

  1. Tech Portal: Add Predictive Support and Personnel tracking

    The tracking of Predictive equipment cases and personnel is a very manual process right now that involves spreadsheets, SharePoint and Outlook.

    We also don't have a process in place to effectively track the process from problems documented, to work orders created, repairs effected and cost savings/avoidance tied back to the original issue or root cause.

    This will reduce man-hours needed for the current process and improve the tracking of program effectiveness and BI metrics.

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Metric for PM feedback

    Metric for PM feedback

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Have a way to schedule workorders back to individual as you reopen it, and be able to flag it so the technician Knows

    Have a way to schedule workorders back to the individual as you reopen it, and be able to flag it so the technician can Easly identify it needs reworked

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Refresh button in work module

    Within the work module of eFP, for the work order and task grid, can we get a refresh button, which would allow us to refresh the data. This helps with newer work orders which have been entered into the system.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Quantity Adjustment

    Supply chain specialists and technicians need to be able to adjust the quantity of parts ordered both up and down. Not allowing people to adjust upwards is not efficient and makes no sense at the site level.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. When scheduling a task in period or daily capacity - flag the that additional tasks exist for that asset.

    Period - Will help us ensure we're scheduling all open tasks for an asset that can be completed at once - planned correctives and current PMs.

    Daily - So we visit the asset only once

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Daily Schedule Portal Task Hyperlink

    Would like the ability to hyperlink into tasks from the daily schedule portal, would help to see notes and time already accomplished etc.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Sort field for Asset ID on daily capacity

    Add Assets ID for sort field on daily capacity

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Add LOCATION to search options field in Req/PO page of the eFP Client.

    Add LOCATION field to search options area in Req/PO page of the eFP Client. Site 0565 Trinity Rail Longview West needs this ability. They have 4 different Locations with separate Ship To addresses. Having the ability to search for unreleased Reqs. by Location would help the SCSs process Reqs.for different buildings by easily focusing on the Locations they are responsible for. This could be necessary also for other future new business ATS acquires.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. Event Monitor for specific days

    On the event monitor, can we add a "rule" that specifies what day of the week a breakdown comes in? For instance, if a down order comes in on a saturday can we have a notification but not for down orders on Mon-Fri? This would help sites that have On Call technicians for off hours

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Multi Select Option

    Option to choose multiples Task status in shift turn over report (Multi select option)

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Remove Delete buttons for SCS on Run Log

    SCS delete Run IDs from the Run Log thinking it will delete the actual Stock Count Run but it only deletes the historical data reported on the Run Log. The DELETE buttons should be removed from the Client on the Run Log.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Stock Count should not allow new Stock to be created by user if a previous Stock Count is still open.

    We could avoid Stock Count Exceptions if eFP did not allow users to create a new Stock Count Run if a previous Stock Count Run ID is still open.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Stock Count creation should require Place ID be entered.

    The Stock Counts should require Place ID to be entered in filed provided. eFP currently shows Place ID field is Required field but the system does not actually require it. Sites often mistakenly run Stock Counts wide-open for All materials sites.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Client  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Adding the parts section to the WO print out

    It would be beneficial for the Techs if the parts need section appeared when a WO is printed. Currently there is a part used section, and I would think that we could add a sub set in this section of the print out.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    3 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Suma de Horas de mano de Obra

    Algo que ayudaría mucho es agregar la opción de sumar las horas de mano de obra de una semana o fecha determinada.
    O como mínimo que cuando se genere el reporte de Excel en la columna de DURACION, el valor de la celda sea sumable, así al generar el reporte podremos seleccionar de una fecha a otra y poder realizar la sumatoria de Horas de mano de obra totales de la semana.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Automatic Refresh

    Can it be made where recent customer requests automatically refreshes every few minutes.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    2 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Change WO from RCT to OTH

    Work is being raised as reactive despite many reminders that it is not a reactive job. The majority are "Other" as they relate to projects, planned calibration, machinery being removed from site, or moved from one location to another. My idea is to allow SM / DFO to change them from RCT to OTH

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Change MRCT WO/Task Type to PR

    supervisor having ability to change an MRCT WO/Task to a project. A lot of times the requestor selects the wrong type of work order and it take time to cancel and create new WOs when tis happens after the fact

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Equipment in Work module needs an additional field to identify "At Risk" equipment.

    Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.

    5 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    under review  ·  1 comment  ·  Portal  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Feedback and Knowledge Base