Stock Count should not allow new Stock to be created by user if a previous Stock Count is still open.
We could avoid Stock Count Exceptions if eFP did not allow users to create a new Stock Count Run if a previous Stock Count Run ID is still open.
6 votes -
Stock Count creation should require Place ID be entered.
The Stock Counts should require Place ID to be entered in filed provided. eFP currently shows Place ID field is Required field but the system does not actually require it. Sites often mistakenly run Stock Counts wide-open for All materials sites.
6 votes -
Inventory Stat Report should have the Customer Account included in the unsimple report
Inventory Stat Report should have the Customer Account included in the unsimple report
6 votes -
Adding the parts section to the WO print out
It would be beneficial for the Techs if the parts need section appeared when a WO is printed. Currently there is a part used section, and I would think that we could add a sub set in this section of the print out.
6 votes -
Suma de Horas de mano de Obra
Algo que ayudaría mucho es agregar la opción de sumar las horas de mano de obra de una semana o fecha determinada.
O como mínimo que cuando se genere el reporte de Excel en la columna de DURACION, el valor de la celda sea sumable, así al generar el reporte podremos seleccionar de una fecha a otra y poder realizar la sumatoria de Horas de mano de obra totales de la semana.6 votes -
Automatic Refresh
Can it be made where recent customer requests automatically refreshes every few minutes.
6 votes -
Job Plan steps need line and paragraph breaks in work orders
Planner/Schedulers go to great care to create detailed steps often with several sub-steps and places to check off completion. It looks great printed out in a pdf. But on the computer or iPad screen, carriage returns and paragraph breaks are ignored and the steps are just giant run on sentences that are jumble together.
5 votes -
Expanded PM Generation Abilities
Add in expanded generation rules for triggering PMs. The want is the ability to exclude certain days. Example- exclude weekends for daily PM Generation
5 votes -
Filter for Task Sub-type in the Review window
Filter for Task Sub-type in the Review window
5 votes -
Agilizar el filtrado de ordenes a revisar (Supevisores)
Visibilidad en pantalla principal de revisión de ordenes de que técnico cerró la tarea.
Nos agilizará a los supervisores el filtrado de las ordenes que requerimos revisar.
5 votes -
Equipment in Work module needs an additional field to identify "At Risk" equipment.
Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.
5 votes -
Work module part search is not looking for manufacturer part number which is what we typically use.
When we search for a part using the manufacturer number it comes back with no results. Also if we use a dash it will come back with all the site parts.
5 votes -
Operator Performed Maintenance sub-type should be available for MCRT type work orders.
Customer has requested all down work orders use sub-types to track responsibility for assets being down. The "Operator Performed Maintenance" sub type cannot be added to a MCRT work order. We need this sub-type to be available to MCRT work orders. Can have changed so it is available on MCRT?
5 votesAfter further review with the site, it seems there is a little confusion on this request.
"Operator error" the Operator causes the problem. "Operator performed maintenance" the Operator fixes the problem. The site is trying to use the sub-types to distinguish between who is responsible for resolving an issue and any extended downtime that occurred.
An example of "operator performed maintenance" 3rd shift operator has a non-maintenance machine issue related to training or experience that prevents running the machine. So, the machine sits idle with a down work order submitted. 1st shift operator arrives and being more experienced is able to fix the issue and begins running the machine.
This functionality will also be useful as our Operator-Performed Maintenance (OPM) program continues to grow within ATS. I am reopening the request to discuss further with our teams.
-
Part number search should disregard dashes, slashes, etc.
When searching for a part, if the number has a dash it will not show any results if you do not type the dash.
5 votes -
Task View
When I scroll down to look for a particular task and find and open the task, I found the task list jumps back to top of the list and then I have to scroll through the list again to find what I was looking for. I suppose if I noted the task number it would not be that big of an issue, but it would be handy if the list just stayed in the position that I stopped. Really a pain when you have multiple Work Orders.
5 votesunder review ·AdminOldfield, Michelle (Business Analyst, Advanced Technology Services, Inc.) responded
Thank you for your feedback! We are looking into the technical requirements for making this happen.
-
list Task# on feedback
Description :
eFactory Pro 3.0 Planner/Scheduler portal - Job Plans, Job plan feed back. Please add Task# to Feedback.Job plans are used on multiple assets and work orders. Sometimes feedback is machine specific. The list of feedback for any given job plan does not list the Task# that the feedback was entered on. With hundreds of work orders using the same job plan in a given month, it becomes very difficult to validate the feedback.
5 votes -
Change Priority in Period Capacity to Scheduler
Allow sites to change priority on a task from the period capacity screen in the scheduling portal. This would allow us to be able to move it to the current week without having to go back and forth between the P/S role and the Tech role.
5 votes -
PM status change option in planner portal
Can the supervisors or planners have the ability to cancel work orders in the planner portal, either in the daily capacity or period capacity views?
Also, an alternative to "Cancel" missed PM's, since they were not technically cancelled. I don't mind the extra time it takes since it shouldn't be easy. But a better option that more accurately reflects the situation:
Missed-Customer - Due to customer constraints
Missed-Maintenance - Example, equipment not found, low staff, etc
Skipped - Example, in shop for repairs, awaiting parts, etc.To show in the drop down window with Cancel, Cancel-Duplicate, etc.
Just more robust…5 votes -
MIN/MAX
I would be helpful to have access to the parts that still have a min/max that hasn't been set. If Supply Chain could get our hands on a list of parts that don't have a min/max set we could get ahead on submitting SARS instead of waiting for Stock Count or Work Orders to come in. When we enter Stock Counts at the end of the month when we are already busy, if we could enter SARS for items that don't have a min/max when we have down time, we could chip through them then.
5 votes -
Inverse filtering.
In addition to having filters such as "starts with," "equals," and "contains." Can we have the inverse, such as "does not start with," "does not equal," and "does not contain."
5 votes