eFactoryPro 3.0
313 results found
-
Suma de Horas de mano de Obra
Algo que ayudaría mucho es agregar la opción de sumar las horas de mano de obra de una semana o fecha determinada.
O como mínimo que cuando se genere el reporte de Excel en la columna de DURACION, el valor de la celda sea sumable, así al generar el reporte podremos seleccionar de una fecha a otra y poder realizar la sumatoria de Horas de mano de obra totales de la semana.6 votes -
Automatic Refresh
Can it be made where recent customer requests automatically refreshes every few minutes.
6 votes -
BI Shift Turnover Report
In the shift turnover report, the object / symptom / problem / resolution columns are very beneficial for REs to build out FMEA analysis. These columns' inputs are generated from the repair codes that techs select when completing the tasks, but there is an option for "Other - see comments" that is used when the standard selections do not apply. If we could have the report generate the comments that the techs input into those column fields instead of just listing "Other - see comments", it would save a lot of time having to go back and manually input the…
5 votesWe are putting this idea on hold due to the precedence of the SC project; however, the requirements remain under review
-
Add the ability to create alert conditions for individual assets in the Event Monitor
Currently, alerts can only be set up based on the list found below. Our customer is requesting alerts on specific assets. Can Asset ID be included in this list?
Work Order Priority
Equipment Criticality
Operating Status
Work Order Status
Task Type
Sublocation
Task Type5 votes -
Filter for Task Sub-type in the Review window
Filter for Task Sub-type in the Review window
5 votes -
Agilizar el filtrado de ordenes a revisar (Supevisores)
Visibilidad en pantalla principal de revisión de ordenes de que técnico cerró la tarea.
Nos agilizará a los supervisores el filtrado de las ordenes que requerimos revisar.
5 votes -
Equipment in Work module needs an additional field to identify "At Risk" equipment.
Adding a field for "At Risk" Equipment allows filtering out these assets to support Design for Reliability Process on the Reliability Maturity Pyramid process. This should have functionality to be mass updated with the Master Equipment list load and able to be modified easily by the site Planner/Scheduler Role.
5 votes -
Part Notes/Description section
It would be great if parts has a better notes/description text section so that additional info buyers need to get the actual specifics correct could be entered or misc info that is helpful to everyone
5 votes -
Operator Performed Maintenance sub-type should be available for MCRT type work orders.
Customer has requested all down work orders use sub-types to track responsibility for assets being down. The "Operator Performed Maintenance" sub type cannot be added to a MCRT work order. We need this sub-type to be available to MCRT work orders. Can have changed so it is available on MCRT?
5 votesAfter further review with the site, it seems there is a little confusion on this request.
"Operator error" the Operator causes the problem. "Operator performed maintenance" the Operator fixes the problem. The site is trying to use the sub-types to distinguish between who is responsible for resolving an issue and any extended downtime that occurred.
An example of "operator performed maintenance" 3rd shift operator has a non-maintenance machine issue related to training or experience that prevents running the machine. So, the machine sits idle with a down work order submitted. 1st shift operator arrives and being more experienced is able to fix the issue and begins running the machine.
This functionality will also be useful as our Operator-Performed Maintenance (OPM) program continues to grow within ATS. I am reopening the request to discuss further with our teams.
-
Posting PO generates parts label to be printed
Instead of generating a receipt document to print or save, have that receipt generate as a document attached to that PO receipt transaction and have the system generate a parts label so that you don't have to copy and paste everything from the client into the parts label reports every time you receive an inventory item in.
5 votes -
Task View
When I scroll down to look for a particular task and find and open the task, I found the task list jumps back to top of the list and then I have to scroll through the list again to find what I was looking for. I suppose if I noted the task number it would not be that big of an issue, but it would be handy if the list just stayed in the position that I stopped. Really a pain when you have multiple Work Orders.
5 votesunder review ·
AdminOldfield, Michelle
(Business Analyst, Advanced Technology Services, Inc.)
responded
Thank you for your feedback! We are looking into the technical requirements for making this happen.
-
list Task# on feedback
Description :
eFactory Pro 3.0 Planner/Scheduler portal - Job Plans, Job plan feed back. Please add Task# to Feedback.Job plans are used on multiple assets and work orders. Sometimes feedback is machine specific. The list of feedback for any given job plan does not list the Task# that the feedback was entered on. With hundreds of work orders using the same job plan in a given month, it becomes very difficult to validate the feedback.
5 votes -
Change Priority in Period Capacity to Scheduler
Allow sites to change priority on a task from the period capacity screen in the scheduling portal. This would allow us to be able to move it to the current week without having to go back and forth between the P/S role and the Tech role.
5 votes -
PM status change option in planner portal
Can the supervisors or planners have the ability to cancel work orders in the planner portal, either in the daily capacity or period capacity views?
Also, an alternative to "Cancel" missed PM's, since they were not technically cancelled. I don't mind the extra time it takes since it shouldn't be easy. But a better option that more accurately reflects the situation:
Missed-Customer - Due to customer constraints
Missed-Maintenance - Example, equipment not found, low staff, etc
Skipped - Example, in shop for repairs, awaiting parts, etc.To show in the drop down window with Cancel, Cancel-Duplicate, etc.
Just more robust…5 votes -
Acknowledgment that No Parts are needed for a work order
It was brought to my attention by one of my technicians that there should be a check box acknowledgement that no parts are needed for a work order reminding them not to forget to sign out parts. He stated that several times, techs forget to add parts to the work order and with the new update, they can't add parts after the work order is closed.
5 votes -
MIN/MAX
I would be helpful to have access to the parts that still have a min/max that hasn't been set. If Supply Chain could get our hands on a list of parts that don't have a min/max set we could get ahead on submitting SARS instead of waiting for Stock Count or Work Orders to come in. When we enter Stock Counts at the end of the month when we are already busy, if we could enter SARS for items that don't have a min/max when we have down time, we could chip through them then.
5 votes -
Inverse filtering.
In addition to having filters such as "starts with," "equals," and "contains." Can we have the inverse, such as "does not start with," "does not equal," and "does not contain."
5 votes -
Closed Work Order
A closed Work Order can still be used as reference for the WO field requirement of a GNS requisition - the system shouldn't allow this and when an SCS will try to do it, there should be an error message saying something like "Reference WO is already closed; choose an open WO number."
5 votes -
When Part ID is added/extended to a site in eFP Client, the system should create a Stock Escalation if a Min/Max >0 is entered.
When a Part ID is added/extended to a site in the eFP Client, the system should create a Stock Escalation if a Min/Max >0 is entered. It normally does this when a Part ID already exists at a site but it does not generate a Stock Escalation when a Part ID is initially added to a site Stock Record. We need to initiate this to comply with SAR (Stock Auth. Req.) process.
5 votes -
closing tasks
There are too many steps to close a work order that does not belong to ATS and does not impact our metrics. i have tp close approximately 150 work orders from other non-ats department's.
5 votes
- Don't see your idea?


